PART COST -Bush

Sl. Part Tent. Blank Size in mm Input Part RM RM Scrap RM Rej'n ICC Net rm Total Profit Total
No. Part No. Level Part Discription Qty. Raw Matl. L W T No. Wt. Wt. Rate Cost Wt Cost 1.00% 1.00% Cost
Process (Machining cost
10% ) Remarks

mm mm mm Off. kg kg Rs/kg Rs kg 28.00 Rs. 0.01 0.0225 Rs. Cost 0.05

1 Bush -3 (L39.2 mm) 3 Bush -2Road 1 Bright Bar / CEW Tub 3000 ø28.00 3.1 65 0.088 0.054 130 11.43 0.034 0.94995 10.48 0.10 0.24 10.82 2.60 1.34 14.77
65.909091
2 Bush -4 (L21 mm) 4 Bush -2Road 1 Bright Bar /CEW Tub 3000 ø28.00 3.3 111 0.054 0.054 130 7.07 0.000 0.010367 7.06 0.07 0.16 7.29 2.60 0.99 10.88

111.53846

PROCESS COST DETAILS PROCESS COST DETAILS


CEW-1 Tube Bright Bar
No of
M/C Rate operation CostRs M/C Rate No of operation CostRs
Cutting & Cutting &
Tube Machining . Chemffering 2.5 1 2.5 Chemffering
M/c Tube Machining . M/c 4.5 1 4.5

0.1 1 0.1
Inspection Inspection 0.1 1 0.1

Total Cost Rs 2.6 Total Cost Rs 4.6