BILL OF QUANTITIES FOR FLAT NO 82-02-06 RENOVATION

PROJECT 2017
FLAT NO 82-02-06 RENOVATION PROJECT 2017
Hulhumalé, Republic of Maldives

BILL OF QUANTITIES
GENERAL CONSTRUCTION WORKS

SUMMARY
ITEM
DESCRIPTION AMOUNT
CODE

Section 1 : General Requirements


1.00 PRELIMINARIES & GENERAL ITEMS MVR. -

Section 2 : Facility Construction


2.00 DEMOLITION WORK MVR. -

3.00 FLOORING & TILING MVR. -

4.00 WOOD WORK & CEILING MVR. -

5.00 PAINTING MVR. -

6.00 DOORS & WINDOWS MVR. -

7.00 FURNITURES AND EQUIPMENT MVR. -

8.00 MISCELLANEOUS ITEMS MVR. -

Section 3 : Facility Services


9.00 ELECTRICAL INSTALLATION MVR. -

10.00 #NAME? MVR. -

GRAND TOTAL MVR. -

GST 6% MVR. -

GRAND TOTAL WITH GST MVR. -

NOTE: It is the Bidder's responsibility to ensure that there is no page missing and / or in duplicate from
these specified Bill of Quantities.
FLAT NO 82-02-06 RENOVATION PROJECT 2017
Hulhumalé, Republic of Maldives

BILL OF QUANTITIES
GENERAL CONSTRUCTION WORKS

SECTION 1: GENERAL REQUIREMENTS

DESCRIPTION UNIT QTY RATE AMOUNT


ITEM

General Notes :

The General Contractor is to provide any sum he considers necesssary in complying


with the following requirements and terms. The monetary value of any item which is
left unpriced shall be deemed to have been included in the rates of each item of work
in the Bill of Quantities.

The Bill of Quantities are prepared and grouped in sections. Within each section the
items are set out in trade order.

The General Contractor is requested to check the number of pages of the Bill of
Quantities and if any page is missing or duplicating or if any figure is indistinctive,
he shall notify the Project Manager who will rectify the matter. No claims for loss
consequent upon the General Contractor's failure to observe this Clause will be
considered.

Wherever the term "Ditto" appears in the Bill of Quantities, the item concerned will be
interpreted in the context of the preceding items. The term may refer to a single word
or phrase.

Wherever the term "Allow" occur in the Generally and Preliminaries, the General

* * * *
Contractor shall provide cost/price on such items. The cost / price indicated on such

* * * *
items will be at the General Contractor's risk and no adjustment in relation thereto will
be made at the Final Account, except where such adjustment is expressly provided
for in the Conditions of Contract. In the absence of any price against such items, the
cost of such items will be deemed to be included on the other rates contained in the
Bill of Quantities.

Wherever the term "Provisional Sum" occur in the Main Works, the General
Contractor shall provide cost on such items. The cost indicated on such items
will be subject to remeasurement based on the actual quantity installed. Provisional
Sums may be used in whole or in part as directed in writing by the Project
Manager. The balance shall be deductible from the Contract Price.

All items in the Bill of Quantities shall be priced in detail not grouped together as total
prices for any trades or sections.
The items of work and corresponding quantities indicated in the Bill of Quantities should
remain unchanged,

The Bid Price shall be considered as a Lump Sum/Fixed Rate and not subject to actual
remeasurement except items marked as provisional sum which are subject to
remeasurement . No claim shall be entertained due to the negligence of the General
Contractor in respect to the bill of quantities and item of work/pay item unless otherwise not
included in the tender plans .

The General Contractor shall be deemed to have taken into account all possible
inclement weather when preparing his Bid and shall not be entitled to extra payment by
reason of the occurrence or effect of excessive wind, typhoon or other meteorogical
phenomena.
DESCRIPTION UNIT QTY RATE AMOUNT
ITEM

1 PRELIMINARIES & GENERAL ITEMS

1.1 Mobilization & Demobilization


Allow all costs and charges associated in establishing site personnel, plant, equipment, and Item 1.00
its eventual clearing out of the site upon completion of the works.

1.2 Record Drawings


The contractor shall provide all "As-built" drawings and operation and maintenance
manuals . Item 1.00
- 1-set Hard Copy Orginal & Soft Copy for Architectural/Civil
(with complete products specs, origin,supplier name & details)
- 1 set Hard Copy Original & Soft Copy for Services

1.3 Site Management Costs


Allow for all on and off site management cost including costs of foreman and assistants, Item 1.00
temporary services, telephone,fax,hoardings and similar.

1.4 General Clean-Up


Daily removal of debris and unnecessary materials from the project site to the dump site Item 1.00
area as designated by the employer. The General Contractor shall allow all costs for
proper housekeeping of the project site at all times.

Total carried to summary ....................................................Mrf.


FLAT NO 82-02-06 RENOVATION PROJECT 2017
Hulhumalé, Republic of Maldives

BILL OF QUANTITIES
GENERAL CONSTRUCTION WORKS

SECTION 3: FACILITY SERVICES

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

9 ELECTRICAL INSTALLATION

(a) The Bidders are requested to refer the Preamble Notes, General
notes, Specifications, and other relevant information prior to
pricing of the following items. Note

(b)
Rate shall include for necessary chasing, trenching, conduits, cables,
cable trays, fittings and clips, cutting holes and chases in brick
work/ block work/ concrete work complete with all necessary
accessories such as sockets, connections, cable glands and boxes
hardware clips, etc., for proper installing and laying of cables. Note

(c)
All under ground cables directly buried in ground to be properly
laid in ground trenches and covered with cable tiles. Rate for under
ground cables shall include for all necessary excavation, sand layers,
cable tiles, warning strips and back filling with approved quality
earth properly compacted. Note

(d)

Rates for all electrical panels shall include for supply and installation
of all necessary MCCB's, MCB's, EFR's, ELCB's auxiliary contacts,
Volt meters, ammeters, kWh meters, indicator lamps, selector
switches, inter connecting copper bus bars, inter locks aligning and
grounding the panel, interconnections, internal wiring instrument
wiring loops, connecting to switch gears, cable gland lugs, steel
channels and necessary hardware fixing and insulating materials
with fully enclosed metal clad panels and distribution boards where
ever necessary and complete as shown in drawing and comply with
the specifications, and as per relevant latest B.S. standards and I.E.T.
regulations and all complete to working order to the approval of the
Engineer. Note

Point wiring
(e) Rates shall include for all conduits, conduit fittings, clips, earth
cables, draw wire, wiring accessories, hardware fixing, insulating
materials, making holes and chases in brick work, concrete
work...etc. and making good the same. Note

(f) Rate for lamp point shall include for cables, ceiling roses, flexible
wire, bulb holders, and flush type switches, flush boxes etc.. Note

(g) Rates for socket outlets shall be inclusive of cables, switch socket
outlets of correct rating, sunk boxes etc. Note
(h) All cables for equipments and units designated to function under
fire condition to be in fire rated cables and steel conduits as
indicated and rates shall include accordingly. Note

Fittings
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(i) All the light fittings to be provided under this Contract shall be of
the best quality without any defects to the complete satisfaction of
the Architect/Engineer. Note

(j) Rates shall also include for supply and installation of all the fittings
complete with all the accessories, such as starters, bulbs, chokes,
power factor correction capacitors…etc Note

(k) Rates shall also include for all the fixing material such as rawl plugs,
hooks, chains, flexible cords...etc. Note

(l) Contractor shall get approval from the Engineer for Electrical fittings
before installation. Note
(m) All lighting and power circuits shall include earth cable of 2.5mm2
unless otherwise specified Note

(n)
All 5A/10A circuit shall be wired in 2x1/1.13 mm2 PVC insulated
sheathed Cu cables and earth cable taken through minimum size of
20 mm PVC conduit unless otherwise specified . All corridors &
staircases area lighting shall be wired with 2x2.5 mm2 PVC/PVC
Cu+2.5mm2E PVC Cu cables drawn in PVC Conduits Note

(o)
All 13A/15A circuit/Socket outlet shall be wired in 2x7/0.067 mm2
PVC insulated sheathed Cu cables and earth cable taken through
minimum size of 2.5 mm PVC conduit .All corridors & staircases
area small power outlets shall be wired with 2x4 mm2 PVC/PVC
Cu+2.5mm2E PVC Cu cables drawn in PVC Conduits Note

(p)
Contractor shall get the approval for position of fittings indicated in
drawings from Architect/Engineer before commencing the work . Note

(q)
Rate shall include for cutting ,trimming , dressing , connecting cables
,cutting holes & chase holes in brick work and connecting cables to
supply points and equipments complete with all accessories such as
sockets, connectors, conduits, cable trays, cable glands,cable lugs,
and boxes, hardware clips , fixing , etc. Note

(r) Please refer respective service drawings for AC plant location , water
pump,sewer pump.Treatment plants etc. locations etc Note

9.1 Main Power Connection


Charges for Providing Laying and connecting main cable from from
STELCO Transformer Board to Building Main Panel Board Item 0.00

9.2 Main Panel Board


Supply and Installation of Main Panel Board with KWH meter
complete including connection to Distribution Boards Nos 0.00

9.3 Distribution Boards


Supply and Installation of Distribution Boards 3 phase and
connection to main Nos 1.00

9.4 Electrical Wiring


9.4.1 Wiring for Power Points
a 1 x 13 A Wall Socket Outlet Nos 4.00
b 2 x 13 A Wall Socket Outlet Nos 6.00
c 1 x 15 A Wall Socket Outlet Nos 3.00
d 1 x 13 A Water proof Wall Socket outlet Nos 2.00
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
9.4.2 TV Outlets
Wiring for TV Outlets Nos 1.00

9.4.3 Fan Regulators Nos 3.00

9.5 Wires, Cables and Conduits


9.5.1 Wiring for Lighting Fixtures Nos 26.00
9.5.2 Wiring to power points Nos 15.00
9.5.3 Wiring to tv outlet with HDMI cable Nos 1.00

9.6 Switches
9.6.1 One Way Switch (One Gang) Nos 14.00
9.6.2 One Way Switch (2 Gang) Nos 2.00
9.6.3 One Way Switch (4 Gang) Nos 2.00

9.7 Lighting & Fixtures


9.7.1 Wall Mounted Lights Nos 6.00
9.7.2 Ceiling Flused Lights Nos 2.00
9.7.3 Wall Mounted Spot Lights Nos 2.00
9.7.4 Wardrobee Mounted Reading Lights Nos 4.00
9.7.5 Ceiling Fan Nos 3.00
9.7.6 AC (Indoor & Outdoor Unit) 9000 BTU Nos 3.00

9.7.7 Mixed Pendant Lights Item 1.00

9.8 Testing & Commisioning


Test the entire system as per STELCO regulations. Item 1.00

Total carried to summary ....................................................Mrf. -


FLAT NO 82-02-06 RENOVATION PROJECT 2017
Hulhumalé, Republic of Maldives

BILL OF QUANTITIES
GENERAL CONSTRUCTION WORKS

SECTION 2: FACILITY CONSTRUCTION

ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT

2 DEMOLITION WORK

(a) Cost to include supply of material , labour , tools, & equipment,


scaffolding, consumables (nails,screws,bolts,nuts,washer,etc..),,
cutting & forming, technical supervision and all other incidentals
necessary to complete the work all in accordance with plans &
specification.

(b) All the works in this section shall be carried out as directed by the
Engineer to his approval.

2.1 Demolition of Existing Kitchen Counter Item 1.00

2.2 Remove Existing Ceiling in the Toilets m2 5.20

2.3 Remove Tiles


2.3.1 Remove Existing Wall Tiles in the Toilets m2 32.69
2.3.2 Remove Existing Floor Tiles in the Toilets m2 5.20
2.3.3 Remove Existing Floor Tiles in the Balcony m2 2.11

2.4 Remove all existing toilets fittings and fixtures and cart away
debris from site as directed. Item 1.00

2.5
Remove carefully all electrical equipment including accessories
and wiring and hand over valuable materials to employer as
directed Item 1.00

2.6 Removal Of Existing Doors including hardware


(Note : remove door should be scratch/damage free for re-use) Item 1.00

2.7 Sealing off gaps/opening using similar material to existing after


removal works with accepted quality standards Item 1.00

2.8
Making good of all affected floor, wall and ceiling areas similar to
existing material & finishes after renovation works as per accepted
quality standards. Item 1.00

Total carried to summary ....................................................Mrf. -

3 FLOORING & TILING

(a) Rates shall include for: Fixing, bedding, grouting, and pointing
materials, making good around pipes, sanitary fixtures, and similar;
cleaning & Polishing.

(b) Rates shall include for laying 60mm thick screeding for general
floors & 35mm thick screed for toilet floors cement mortar in 1 : 5
mix ratio,cleaning down to reveals where necessary and water
proofing - Conmix Moyaproof HF to Toilet ,Kitchen and balcony
floors .

(c) All Tiling work in accordance with specifications and finishes


schedule.Toilet wall tiling shall be from the floor level to ceiling.
ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT

3.1 300 x 600 Floor Tiles (Ceramic floor Tiles)


3.1.1 Balcony m2 2.11

3.2 300 x 600 Floor Tiles (Matt floor Tiles)


3.2.1 Toilet 1 m2 2.77
3.2.2 Toilet 2 m2 2.55

3.3 300 x 600 mm Wall Tiles (Gloss white Wall tiles)


3.3.1 Toilet 1 m2 16.28
3.3.2 Toilet 2 m2 16.41

3.4 300 x 600 mm Wall Tiles (Texture white tiles)


3.4.1 Kitchen m2 1.50

3.5
Parquet Flooring (Angkor) or approved equivalent
3.5.1 Master Bed Room m2 12.63
3.5.2 Guest Room m2 9.33
3.5.3 Hallway & Laundry m2 5.33
3.5.4 Living Room & Kitchen m2 14.44

Total carried to summary ....................................................Mrf. -

4 WOOD WORK & CEILING

(a) Rates shall include for: all labour in framing, notching and fitting
around projections, pipes, light fittings,
hatches, grilles and similar and complete with cleats, packers,
wedges and similar and all nails,bolts & screws.

(b) Rate shall include for cement board false ceiling of approved
framing and hangers manufacturer fixed complete with suspension
system including , bulkhead, moulding, cornice and perforations
required for luminaries, grills and ducts etc. as specified and to the
approval of the Engineer.

4.1 Fiber Cement Board Celing


4.1.1 Toilets m2 5.20

4.2 Drop Celing for Hanged Pendent Light Item 1.00

Total carried to summary ....................................................Mrf. -

5 PAINTING

(a) Rates shall include for: the provision, erection and removal of
scaffolding, preparation, rubbing down
between coats and similar work, the protection and/or masking
floors, fittings and similar work, removing and
replacing door and window furniture.

(b) All painting work shall be carried in accordance with the drawings
and Specifications
ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT

(c) Rate shall include for putty and paint finish for interior surfaces of
the wall and ceilings complete including application of two coats of wall
sealer, two coats of putty finish and two coats of emulsion paint finish on
top for Interior painting.

5.1 Wall Painting


5.1.1 Painting Intenal walls m2 121.96
5.1.2 Painting External walls (Balcony) m2 4.66

5.2 Ceiling Painting


5.2.1 High Gloss White Paint Finish (Slab soffit)
a Master Bed Room m2 12.63
b Guest Room m2 9.33
c Hallway & Laundry m2 5.33
d Living Room & Kitchen m2 14.44

5.2.2 Matte White Paint Finish (ceiling : Toilets) m2 5.20

Total carried to summary ....................................................Mrf. -

6 DOORS & WINDOWS

(a) Rates shall include for locks, latches, closers, push plates, pull
handles, bolts, kick plates, hinges and all
door & window hardware.

(b) Rates shall include for door frames and window frames, mullions,
transoms, trims, glazing, tinting,
timber panels, boardings, framing, lining, fastenings and all fixings
and installation.

(c) All Timber door frames shall be treated timber.


(d) All louvres, windows and sliding doors shall be 80 micron powder
coated aluminium as per details given in
Door/Window schedule.

(e) Refer Detail drawing or Schedule for the Type & Size of Door /
Windows

6.1 Doors
a D1 (950mm x 2100mm) Nos 1.00
b D2 (850mm x 2470mm) Nos 1.00
c D3 (850mm x 2100mm) Nos 2.00
d D4 (700mm x 2050mm) Nos 1.00
e D6 (1850mm x 2100mm) Nos 1.00

6.2 Windows
Cleaning and Repair all existing windows as per the
6.2.1
Drawings Item 1.00
Supply and fixing decorative aluminium Security Grilles or
6.2.2
approved equivalent for all windows Item 1.00

Total carried to summary ....................................................Mrf. -


ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT

7 FURNITURES AND EQUIPMENT

(a) Rates shall include for: include supply of materials, labor, tools &
equipment, consumables (nails, screws, bolts, nuts, washer, etc.),
cutting, forming, drilling, & technical supervision and all other
incidentals necessary to complete the work all in accordance with
plans & specification as per the drawings

7.1 Fabricated Wardrobe

Wardrobe shall be 12mm ss Pipes for hangers, motion sensing LED


light srips fixed under hanger and 18mm thick block board finished
with gloss white formica Item 1.00

7.2 Beds Nos 2.00

7.3 Fabricated Cusion Sofa


All cusion should be fixed to base frame & Rates shall include for
Cusions and Cusion Covers Item 1.00

7.4 Cofee Table with Chairs Item 1.00

7.5 Dining Table Item 1.00

7.6 White Roller Shades


Supply and fixing White Roller Shades for all windows Item 1.00

7.7 56'' LED TV Nos 1.00


Rate shall included for installaiton

Total carried to summary ....................................................Mrf. -

8 MISCELLANEOUS ITEMS

8.1 Pantry cabinets

Rate shall include for, supply and fix complete including all fittings
Pantry under counter cabinet base unit complete with gloss white
finish , stainless steel skirting (IS9.00), shutters, shelves and pull out
drawer, ironmongeries, LED light strip under top kitchen cabinet,
Minibar Fridge, Stove Cooker finishes as per approved by the
Engineer and as specified (counter top and kitchen sink measured
elsewhere) Item 1.00

8.2 Kitchen Counter & Island


Supply and fixing Kitchen Counter & Island inclding 4 Nos Bar
Chairs Item 1.00

8.3 Kitchen Table Top


Supply and fixing Marble sheet top in kitchen Item 1.00

8.4 Laundry
Rate shall include for, supply and fix complete washing machine
and laundary storage including all wall fittings, flushed handles and
finished with gloss white formica as per the drawings Item 1.00

Total carried to summary ....................................................Mrf. -


Page 12

FLAT NO 82-02-06 RENOVATION PROJECT 2017


Hulhumalé, Republic of Maldives

BILL OF QUANTITIES
GENERAL CONSTRUCTION WORKS

SECTION 3: FACILITY SERVICES

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

10 HYDRAULIC & DRAINAGE

(a)
Rate shall include for sockets,running joints, connectors
elbows,junctions,valves,reducers,expansion joints,backnuts and
similar:Incidential Note
fittings,clips,saddles,brackets,straps,hangers,screws,nails and fixing
complete including cutting and forming holes,excavating,laying
pipes and backfilling trenches.

(b) Design provide and install plumbing network for the entire
building complete in accordance to standard set by the local Note
governing body MWSC

(c) The following items and description and the plumbing drawings
are given as guidance as to the nature of the information to be Note
returned by the contractor.

(d) Ground water connection shall be made as specified in the


Note
drawings.

(e) All pipes shall be High Pressure uPVC . Note

10.1 Sanitory Pipe Network


10.1.1 Charges for connecting to Sewer Main using 100mm uPVC pipes
including connection cost Item 0.00

10.1.2 100mm uPVC Sewage/discharge pipe work complete including


cleanouts with cap for toilet (water closet). Item 1.00

10.1.3 50mm uPVC Sewage/discharge pipe work complete including


cleanouts with cap . Item 1.00

10.2 Inspection chambers


10.2.1
Construction of inspection chambers as per the detailed drawings.
Rate to include all excavation & backfilling & compaction, concrete Nos 0.00
work including form work & reinforcements, plumbing works and
all other related incidentals and consumables to complete.

10.3 Fresh Water Supply Network


10.3.1 Connecting to MWSC water main including water meter & Nos 0.00
connection charge.

10.3.2 35mm dia uPVC Fresh water supply pipe work complete. Item 1.00

10.4 Ground Well Water Supply


Page 13

ITEM DESCRIPTION UNIT QTY RATE AMOUNT


10.4.1 Supply & Laying 35mm dia uPVC pipe network for ground water
supply (Well water) including all valves and other necessary Item 1.00
accessories

10.5 Pumps
10.5.1
Supply and installation of Booster Pump set including floating
switches & valves, pressure tank, pressure gauge and all piping &
wiring works and all other necessary accessories & consumables Nos 0.00 -
with sufficient capacity as per building plan requirement to
complete.

10.6 Sanitory Fittings


10.6.1 Water Closet Nos 2.00
10.6.2 Wash Basin including Counter Nos 2.00
10.6.3 Wash Basin tap Nos 2.00
10.6.4 Toilet Paper Holder Nos 2.00
10.6.5 Towel Holder Nos 2.00
10.6.6 Mirror Set (with LED Strips) Nos 2.00
10.6.7 Muslim Shower Nos 2.00
10.6.8 Kitchen Sink Nos 1.00
10.6.9 Sink Tap Nos 1.00
10.6.10 Floor Trap Gully with Drain Nos 2.00
10.6.11 Soap Holder Nos 2.00
10.6.12 Rain Shower Nos 2.00

10.7 Hot and Cold water system


10.7.1 Supply and Fixing Hot and cold water system Nos 1.00
10.7.2 Supply & Laying PPR hotwater pipe (PN20) And PN10 COLD
WATER pipe network for Hot and cold water supply including all Item 1.00
valves and other necessary accessories .

10.8 Testing and Commissioning


10.8.1 Rate to include all testings to be done all plumbing systems and all
Item 1.00
other fittings and accessories to complete.

Total carried to summary ....................................................Mrf. -