Electrical Specs-00f1 - Fire Station
Electrical Specs-00f1 - Fire Station
Electrical Specs-00f1 - Fire Station
PMT OPRNS
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
MAS
MAS
10/27/16 00
28-00014
00
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
TABLE OF CONTENTS
MAS
MAS
28-00014
00
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
PART 1 - GENERAL
A. Codes and Standards: Comply with all applicable Codes and Standards including,
but not limited to, those listed below:
28-00014
– Parts 1 thru 7.
SEC 31-SDMS-02 REV.02 Specification for Low Voltage
00F1 12/1/16
DATE
10/27/16
Distribution Pillars.
SEC 40-SDMS-02 REV.02A & 02B Electronic Kilo-Watt-Hour
Meters.
NO.
REV
00
DISCIPLINE
SEC 42-SDMS-01 specifications for fiber glass reinforced
ENGINEER
ANP
polyester meter boxes.
12/1/16
SEC SDCS-03 Distribution network grounding (Parts 1 to 3).
DATE:
PROJECT
IEC International Electrotechnical Commission
ENGINEER
EIA Electrical Industries Association (EIA).
MAS
12/1/16
IBC International Building Code 2009 without references to the
DATE:
CERTIFIED
National Electrical Code.
REZ NFPA-70 National Electrical Code (for Emergency System only).
12/1/16 NFPA National Fire Protection Association (Emergency, Fire alarm
DATE:
CONSTRUCTION and Lightning Protection only).
AGENCY
AAG IES Illuminating Engineering Society of North America.
12/1/16
DATE:
OPERATIONS
SAES SAUDI ARAMCO Engineering Standards, (except : SAES-P-
SMK 101, SAES-P-104, SAES-P-111, SAES-P-113, SAES-P-121,
12/1/16
SAES-P-123.)
DATE:
SAMSS SAUDI ARAMCO Material System Specifications
CONTROL NUMBER
VERIFICATION
B. For detailed list of Codes and Standards, refer to the appropriate Specification
EDSD
sections.
DATE:
BY:
1.03 DEFINITIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
in chases.
5. Concealed, Exterior Installations: Concealed from view and protected from
DESCRIPTION
A. Work includes but is not limited to the following systems, equipment, and
services:
1. All work associated with the containment of the incoming electrical service
from substation, coordination, seals and provision within the main panel
JO/EWO
28-00014
28-00014
provisions.
3. 50mm conduit for fiber cable to SEC meter from distribution substation for
buildings, to SEC standards.
NO.
REV
00
DISCIPLINE
4. Switchboards, Distribution, and panel boards for lighting and power, including
ENGINEER final wiring to circuit breakers and lighting control relays.
ANP
12/1/16
5. Feeders, bus duct, sub feeders, and branch circuiting for light, power and
DATE:
PROJECT
control wiring, including connections to all service switchboards, distribution
ENGINEER switchboards, transfer switches, panel boards, transformers, mechanical
MAS
distribution panels, motor starter groups, motor control equipment,
12/1/16
DATE: disconnect devices, outlets, motors and equipment included in these
CERTIFIED
REZ Specifications or indicated on the drawings.
12/1/16 6. Furnishing and installation of lighting equipment, lighting fixtures, lamps,
DATE:
CONSTRUCTION
contactors, lighting control systems, etc.
AGENCY
AAG
7. Installation and testing of lighting equipment and controls.
12/1/16
8. Telecommunications empty cable containment system.
DATE:
OPERATIONS
9. A complete electrical grounding/earthing system.
SMK
10. Lightning protection system
12/1/16
11. Testing and Balancing Loads. Installation and wiring of individual motor
DATE:
controllers and mechanical distribution panels, including variable speed
CONTROL NUMBER
VERIFICATION
13. Furnishing and installing equipment interlock wiring not provided by the
BY:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
16. Final connection of all equipment furnished under other Divisions and/or by
REZ
ENGG CERT
REZ
herein and as required by the Authority Having Jurisdiction for the passage
of conduit, etc. through structural steel, decking, masonry and concrete walls
DESCRIPTION
and floors, drywall construction, any other rated construction assembly, and
elsewhere as will be required for the proper protection of each raceway and
busduct passing through a wall, floor, etc. Coordinate the work with the work
of other Trades in order to properly expedite and perform the work. Furnish
shop drawings showing the size and location of all required holes through
the concrete floors and walls.
22. Participate in and assist in the testing, operation and commissioning of all
electrically powered equipment as required during the performance testing
and startup of the work of other Sections.
23. Instruments as required for operating and testing the various systems shall
JO/EWO
28-00014
28-00014
00
DISCIPLINE
Jurisdiction and prepare, complete and file all forms, tabulations, plans,
ENGINEER including controlled inspections, pertinent thereto with the referenced
ANP
12/1/16
authorities and accomplish such work with qualified personnel, where so
DATE:
PROJECT
required. Patching or replace all fireproofing if it is damaged or removed
ENGINEER during the installation of the Electrical Work.
MAS
26. Furnish access doors in general construction.
12/1/16
DATE: 27. Power and empty cable containment system for the security system.
CERTIFIED
REZ 28. Power and empty cable containment systems, for the telecommunication
12/1/16 systems.
DATE:
CONSTRUCTION
29. All associated electrical work related to Outdoor lighting
AGENCY
AAG
30. Fire alarm and detection system.
12/1/16
DATE:
OPERATIONS
B. Builders Work In Connection With Electrical Services Installation
SMK
1. The Contractor is required to detail all builders work requirements in
12/1/16
connection with the electrical services installation. This shall include the
DATE:
following:
CONTROL NUMBER
VERIFICATION
a. Lifting beams
b. Holes/openings in structural elements
EDSD
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
Contractor only. The Contractor shall provide details of all builders work
required for the electrical installation.
3. The Contractor shall ensure that the fire integrity of any building element
which is affected by the electrical installation is made good using proprietary
products as detailed in specifications and drawings.
ISSUED FOR CONSTRUCTION
1.05 SUBMITTALS
DESCRIPTION
A. Submit detailed and fully coordinated and dimensioned shop drawings showing
all containment routes and equipment. The Electrical Rooms shall be detailed to
with large- scale (minimum 1:50) layout shop drawings.
28-00014
4. Current Transformers.
5. Circuit Breakers.
6. Wires and Cables (include sample).
00F1 12/1/16
DATE
10/27/16
00
9. Switches.
DISCIPLINE
ENGINEER 10. Lighting Control System.
ANP
11. Equipment/Devices Name Plates (include sample).
12/1/16
DATE: 12. Power Sockets (include sample).
PROJECT
ENGINEER 13. Lightning Protection System.
MAS
14. Panelboards.
12/1/16
DATE: 15. Fireproofing (include sample).
CERTIFIED
REZ 16. Cable tray and Fittings.
12/1/16
17. Cable Supports (include sample).
DATE:
18. Metering System.
CONSTRUCTION
AGENCY 19. Busways.
AAG
20. Fire alarm and detection system.
12/1/16
DATE: 21. Earthing Equipment.
OPERATIONS
22. Seismic Restraint Systems.
SMK
23. Uninterrupted Power Supply System.
12/1/16
DATE: 24. Mechanical Distribution Panels.
CONTROL NUMBER
26. Lamps.
EDSD
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
C. Submit maintenance manuals which shall include the following information for
REZ
ENGG CERT
REZ
equipment items:
MAS
MAS
instructions.
28-00014
E. Submit certified test reports and establish final trip setting by carrying out a
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
F. Prior to commissioning, the contractor shall submit blank site test reports for
ENGINEER comment for all equipment that is to be tested. Prior to Final Acceptance, the
ANP
12/1/16
following data shall be furnished to Saudi Aramco:
DATE:
PROJECT
1. Record Drawings.
ENGINEER 2. Coordination Drawings
MAS
3. Operation and Maintenance Manuals
12/1/16
DATE: 4. Manufacturer’s Data of the equipment and devices installed
CERTIFIED
REZ 5. Completed and signed site test reports.
12/1/16
DATE:
CONSTRUCTION
1.06 QUALITY ASSURANCE
AGENCY
AAG
A. All workmen performing under this Division shall be skilled workers of the
12/1/16
DATE: trade involved. Where specialty work, such as cable splicing, input testing
OPERATIONS
or welding are required, submit proof of training, experience and work
SMK
history for each workman, for review by Saudi Aramco. Only approved
12/1/16
DATE: workmen shall perform specialty work.
CONTROL NUMBER
VERIFICATION
recognized standard shall bear the conformance labeling of the third party
DATE:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
the Specifications, the Contractor shall apply, install, connect, erect, use,
clean, commission and condition manufactured articles, materials, and
MAS
MAS
1.07 GUARANTEE
B. Environmental Limitations:
1. Do not deliver or install electrical equipment until spaces are enclosed and
weathertight, wet work in spaces is complete and dry, work above electrical
JO/EWO
28-00014
28-00014
2. Rate equipment for continuous operation under the following conditions unless
otherwise indicated:
NO.
REV
00
12/1/16 A. The equipment selections used in the preparation of the Contract Documents will
DATE:
CONSTRUCTION
AGENCY
fit into the physical spaces provided and indicated, allowing ample room for
AAG access, servicing, removal and replacement of parts, etc. The Contractor shall
DATE:
12/1/16 ensure that adequate space is provided for clearance of the equipment supplied
OPERATIONS in accordance with Code requirements, the requirements of the local Authorities
SMK Having Jurisdiction, and the equipment manufacturer's recommendations.
12/1/16
DATE:
B. In the preparation of Drawings, a reasonable effort to accommodate acceptable
CONTROL NUMBER
VERIFICATION
mm high zone directly above the proposed finished ceiling in tenant areas as
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
shown on the architectural drawings to allow for tenant build-out and flexibility
REZ
ENGG CERT
REZ
28-00014
00
on walls, to group them into orderly relationships and/or increase their utility.
DISCIPLINE
ENGINEER 4. The Contractor shall check drawings of all trades to verify spaces in which
ANP
Work will be installed. Maintain maximum headroom in all areas. Where space
12/1/16
DATE: conditions appear inadequate, Saudi Aramco shall be notified before
PROJECT
ENGINEER proceeding with the installation.
MAS
5. Certain material will be furnished, installed, or furnished and installed, under
12/1/16
DATE: other Sections of the Contract Documents. Examine the Contract Documents
CERTIFIED
REZ to verify these requirements.
12/1/16
6. Equipment location and dimensions shown on the Drawings is approximate of
DATE:
CONSTRUCTION
a typical equipment of the class indicated and has been coordinated for
AGENCY
AAG
structural penetrations, electrical requirements, operating and service
12/1/16
requirements, and physical size with regard to the space where the equipment
DATE: is shown. Other manufacturers of this equipment will be acceptable contingent
OPERATIONS
on the Contractor providing a complete installation and maintaining full
SMK
responsibility to provide, at no additional cost, any modifications to the
12/1/16
DATE: structure or electrical service that are required to properly install, operate, and
CONTROL NUMBER
service the equipment. These modifications shall not include additional area
VERIFICATION
Floor Plans or on wall elevations shall take precedence over electrical plan
BY:
locations.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
1. Work out all "tight" conditions involving Work under this Division and Work in
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
other Sections such as space for access to pull boxes, cable support boxes,
control wiring and connections, access doors in ample time for installation.
DESCRIPTION
4. The General Contractor and all trades shall coordinate the installation of
equipment, conduit, busduct, ductwork, piping, cable, cable trays, etc., with
the installation of luminaires, special ceiling construction, air distribution
equipment and the structure. Provide additional rises, drops, offsets and
pullboxes as required. If, after installed, new conduit, busduct, ductwork,
piping or cable is found to be in conflict with the architecture, structure, or
other trade Work which is either existing or shown on the Contract
Documents, the conduit, busduct, ductwork, piping or cable shall be relocated
without additional cost to SAUDI ARAMCO.
5. Wherever work interconnects with work of other Sections, coordinate this work
JO/EWO
28-00014
28-00014
to insure that other Sections are advised of the information necessary so that
they may properly install all the necessary connections and equipment.
00F1 12/1/16
DATE
10/27/16
Identify all work items in an approved manner in order that the work of other
Sections may know where to install access doors and panels.
6. Furnish and set all sleeves for passage of the electrical service and
NO.
REV
00
DISCIPLINE
distribution, and telecommunication services through structural masonry and
ENGINEER
ANP
concrete walls and floors and elsewhere as will be required for the proper
12/1/16
protection of each conduit passing through building surfaces. Coordinate this
DATE:
PROJECT
work in order to properly expedite and perform this work and provide
ENGINEER fireproofing in accordance with these Contract Documents.
MAS
12/1/16
7. Architectural drawings shall be checked for ceiling height requirements.
DATE: Where no ceiling height is stated, and ceilings are present, request direction
CERTIFIED
REZ from Saudi Aramco prior to commencing work.
12/1/16 8. Field drilling, cutting and/or reinforcing of holes in structural metal deck
DATE:
CONSTRUCTION
required for work under this Section shall be coordinated through the General
AGENCY
AAG
Contractor and approved by the Structural Engineer. All such drilling, cutting
12/1/16
and reinforcing costs shall be included as work of this Section of the Contract
DATE:
OPERATIONS
Documents.
SMK
9. Coordinate electrical power and control wiring requirements of mechanical,
12/1/16
plumbing, and elevator equipment with Divisions 14, 21, 22,and 23.
DATE:
10. Coordinate electrical power and control wiring requirement of Building
CONTROL NUMBER
VERIFICATION
11. Equipment rough-in locations shown on the Drawings for equipment furnished
DATE:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
13. Coordinate with the Utilities Infrastructure Contractor for their requirements for
REZ
ENGG CERT
REZ
large scale and full size details of finished rooms, reviewed shop drawings.
Make any necessary adjustment of the work to fit conditions for luminaires,
DESCRIPTION
switches, Fire alarm devices and for outlets occurring in glazed tile, block,
wood paneling or other special finish material in order that all boxes shall be
flush with finish and centered properly. In centering outlets make due
allowance for overhead piping, ducts, window and door trim, variations in
thicknesses of furring, plastering, etc., as erected, regardless of conditions
which may be otherwise shown on small scale drawings.
16. Locate local switches, which are shown near doors at the strike side of the
door, unless specifically noted on plans on architectural details to be beyond
the open door.
17. In Mechanical Rooms, Electric Rooms, Elevator Machine Rooms, Pump Rooms,
JO/EWO
28-00014
28-00014
systems, racks and piping, conveyor belts layouts. Fixtures shall be mounted not
less than 2500 mm above the finished floor, unless otherwise noted on the
Drawings.
NO.
REV
00
DISCIPLINE
18. Coordinate all components and aspects of the work, in order to minimize power
ENGINEER shutdowns to the power distribution systems. Should any part of the Work require an
ANP
"off-hours" shutdown, supply temporary services or feeders to maintain operation of
12/1/16
DATE:
PROJECT
the existing systems and equipment.
ENGINEER 19. Coordinate arrangement, mounting, and support of electrical equipment:
MAS
20. To allow maximum possible headroom unless specific mounting heights that reduce
12/1/16
DATE: headroom are indicated.
CERTIFIED
REZ 21. To provide for ease of disconnecting the equipment with minimum interference to
12/1/16 other installations.
DATE:
CONSTRUCTION
22. To allow right of way for piping and conduit installed at required slope.
AGENCY
AAG
23. So connecting raceways, cables, wireways, cable trays, and busways will be clear
12/1/16
of obstructions and of the working and access space of other equipment.
DATE:
OPERATIONS
24. Coordinate installation of required supporting devices and set sleeves in cast-in-
SMK
place concrete, masonry walls, and other structural components as they are
12/1/16
constructed.
DATE:
25. Coordinate location of access doors for electrical items that are behind finished
CONTROL NUMBER
VERIFICATION
firestopping.
DATE:
27. Coordinate with the Elevator Contractor for their requirements for service
BY:
28. Coordinate with the Plumbing Contractor for their requirements for equipment
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
C. Coordination Drawings
REZ
ENGG CERT
REZ
3. All Contract Drawing space allocations shall be maintained, such as ceiling height,
chase walls, equipment room size, etc., unless prior written authorization is received
DESCRIPTION
28-00014
elevation, location, support points, static, dynamic and expansion forces and loads
imposed on the structure at support, and anchor points, and the size of all lines shall
00F1 12/1/16
DATE
10/27/16
be indicated.
7. All beam and slab penetrations shall be indicated, sized and coordinated. All work
routed underground or embedded in concrete shall be indicated by dimension to
NO.
REV
00
DISCIPLINE
column and building lines and shall be coordinated. This requirement for
ENGINEER "Coordination Drawings" shall not be construed as authorization for the Contractor to
ANP
12/1/16
make any unauthorized changes to the Contract Drawings.
DATE:
PROJECT
8. Prepare large scale detailed layout Drawings showing locations of equipment, cable
ENGINEER containment and conduit runs, panels, and all other elements of electrical systems
MAS
where required by other Sections of this Division, plus sections of all congested
12/1/16
DATE: areas to show relative position and spacing of affected elements. All symbols and
CERTIFIED
REZ designations used in preparing Record Drawings shall be as approved by Employer.
12/1/16 9. The Work shall be installed in accordance with the shop drawings and the
DATE:
CONSTRUCTION
“Coordination Drawings”. If the Contractor allows one trade to install their work
AGENCY
AAG
before coordinating with the work of other trades, the Contractor shall make
12/1/16
necessary changes to correct the condition without cost to the Employer.
DATE:
OPERATIONS
SMK
1.10 SHOP DRAWINGS AND SAMPLES
12/1/16
DATE: A. All shop drawings and samples shall be identified as follows
CONTROL NUMBER
1. Date of submittal.
VERIFICATION
2. Title of project.
EDSD
4. Number of submission.
BY:
B. The term "shop drawings" shall include layout, detail, and assembly drawings,
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
C. No part of the work shall be started in the shop or in the field until Saudi
Aramco has reviewed the shop drawings and samples for that portion of the
work and provided the approval required. Thereafter, the work shall be
executed in accordance with the Contract Documents and the indicated status of
ISSUED FOR CONSTRUCTION
D. Shop drawings and samples shall be submitted for review sufficiently in advance
DESCRIPTION
of the scheduled start of the work in the shop or in the field to allow ample time,
in consideration of the number and complexity of the drawings in the submittal,
for Saudi Aramco to make an orderly review. No extension to complete the work
will be granted to the Contractor by reason of his failure in this respect.
E. The Contractor shall carefully check shop drawings and samples, including those
received by them from Subcontractors and material personnel, for accuracy,
completeness of required information and conformance with the Contract
Documents. Shop drawings found to be inaccurate, incomplete or not in
JO/EWO
28-00014
28-00014
F. Each submitted shop drawing shall bear the Contractor's stamped and signed
certification (i.e., by the Project Manager) that the work has been checked for all
NO.
REV
00
related job conditions, for maintenance of architectural conditions, and coordinated with
DISCIPLINE
ENGINEER
the shop drawings of other trades for interrelated work, as required for the proper and
ANP complete performance of the work. No shop drawing submittal will be reviewed without
DATE:
12/1/16 this certification.
PROJECT
ENGINEER
MAS G. Each shop drawing and sample submitted for review shall be accompanied by a letter
DATE:
12/1/16 of transmittal, and shall be identified by the project title, Contractor's name, and a
CERTIFIED reference to the related part of the Contract Documents.
REZ
12/1/16
DATE: H. Shop drawings for manufactured material and equipment shall include model numbers,
CONSTRUCTION
AGENCY dimensioned drawings, operating weights, material specifications, operating features
AAG
and controls wiring diagrams, performance characteristics, service procedures,
12/1/16
DATE: including clearance requirements for maintenance work, and conformance to specified
OPERATIONS Codes and standards. Note that in addition to these requirements, other specific
SMK
submittal data, and forms of data submission, are required by the Contract Documents
12/1/16 for particular items of equipment and material.
DATE:
CONTROL NUMBER
VERIFICATION
I. Shop drawings for generator rooms, UPS rooms, electrical LV Rooms, electric closets,
EDSD
and for cable containment, conduit and similar distribution services shall show by
dimension the exact size and location of each element of the system in both the
DATE:
BY:
shall clearly show where doors providing access to equipment will be required in
finished construction. Pads, foundations, anchorages, supports and attachments to the
(DCC) NO. _____________________
28-00014-0002-0001
building structure, where required for the installation of the work shall be shown in
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
layout and detail with sizes, dimensions, materials and methods of construction noted.
REZ
ENGG CERT
REZ
The work described in any shop drawing submission shall be carefully checked by this
Contractor for all clearances, including those required for maintenance, servicing
MAS
MAS
J. Ensure clean pathways including use of elevators, hosts, cranes / gantries for
transportation of equipment to designated locations. Coordinate all openings required
ISSUED FOR CONSTRUCTION
L. Review of drawings and other material submitted shall not be construed as a complete
check or constitute a waiver of the requirements of the Contract Documents. This
review shall not relieve the Contractor of the responsibility to fit the proposed materials
JO/EWO
28-00014
28-00014
1.11 COMMISSIONING
NO.
REV
00
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
PART 2 - PRODUCTS
MAS
MAS
A. SEC must approve all conduit and wiring related to the incoming electrical
service prior to ordering equipment and installation. Conduit, cables, and other
equipment related to the electrical service must be on the SEC approved vendor
ISSUED FOR CONSTRUCTION
list.
B. Equipment and materials furnished shall be new and unused, prior to this
DESCRIPTION
installation, first grade commercial quality and shall be essentially the standard
cataloged products of a manufacturer regularly engaged in the manufacture of
the products. Only those items specifically shown on the Drawings as Employer
furnished shall be reused in this installation. Rebuilt or remanufactured
equipment will not be permitted.
28-00014
00
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized
DATE:
steel, plain ends where they are exposed. Use PVC pipe sleeves where they are
BY:
not exposed.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
b. For sleeve cross-section rectangle perimeter equal to, or more than 1270
mm and 1 or more sides equal to, or more than 400 mm, thickness shall
MAS
MAS
be 3.5 mm.
C. SLEEVE SEALS
cable or conduit.
b. Pressure Plates: Stainless steel. Include two for each sealing element.
c. Connecting Bolts and Nuts: Stainless steel of length required to secure
pressure plates to sealing elements. Include one for each sealing
element.
D. Grout
Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged,
nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to
consistency suitable for application and a 30-minute working time.
JO/EWO
28-00014
28-00014
00F1 12/1/16
PART 3 - EXECUTION
DATE
10/27/16
3.01 INSTALLATION
NO.
REV
00
DISCIPLINE
ENGINEER 3.1 SEISMIC REQUIREMENT:
ANP
12/1/16
DATE: A. Seismic restraints for equipment, conduits, cable trays, devices, luminaries,
PROJECT
ENGINEER equipment housekeeping pads and equipment supports shall be provided in
MAS accordance with Section 260548 ‘Vibration and Seismic Controls for Electrical
12/1/16
DATE: Systems’.
CERTIFIED
REZ
3.2 PENETRATIONS:
12/1/16
DATE:
CONSTRUCTION
AGENCY
A. Avoid, if possible, the penetration of any waterproof membranes such as roofs,
AAG machine room floors, basement walls, and the like. If such penetration is
DATE:
12/1/16 necessary, perform it prior to the waterproofing and furnish all sleeves or
OPERATIONS pitch-pockets required. Advise Saudi Aramco and obtain written permission
SMK before penetrating any waterproof membrane, even where such penetration is
DATE:
12/1/16 shown on the Drawings.
CONTROL NUMBER
VERIFICATION
B. If Contractor penetrates any walls or surfaces after they have been waterproofed,
EDSD
C. Pack space between conduits, sleeves, cable trays and seal unused sleeves
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
D. Where conduits or cable ducts enters the building through a concrete foundation
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
F. Seal around penetrations and between conduits, cable trays, sleeves, etc. and
seal unused sleeves, in fire rated walls with NRTL listed fireproofing material to
ISSUED FOR CONSTRUCTION
maintain integrity fire rating. Refer to specifications for details and requirements.
G. The Contractor shall be responsible for the timely placing of sleeves for all
DESCRIPTION
piping passing through walls, partitions, beams, floors, and roofs, while the
same are under construction.
3.3 EXPANSION/DEFLECTION
A. Equip all cable trays and conduits, including those embedded in concrete,
which cross building expansion or control joints, with expansion fittings.
28-00014
A. Dissimilar metals shall mean those metals, which are incompatible with one
NO.
REV
00
DISCIPLINE
another in the presence of moisture. Where dissimilar metals come in contact,
ENGINEER
ANP
paint the joint both inside and out with approved coating so as to exclude
12/1/16
moisture from the joint, or provide a suitable insulating barrier separating the
DATE:
PROJECT
metals.
ENGINEER
MAS
B. Transitions in cable containment systems, from one metal to a dissimilar metal
12/1/16
DATE: shall only be made at boxes or other enclosures.
CERTIFIED
REZ
3.5 RUBBER MATS
12/1/16
DATE:
CONSTRUCTION
AGENCY A. Install a continuous one-piece rubber mats in front of each electrical equipment
AAG
such as switchboard, motor control center, switchgear, generator paralleling
12/1/16
DATE: switchgear, Uninterruptible Power Supply equipment, substation transformers,
OPERATIONS each side of a generator set, etc.
SMK
DATE:
12/1/16 B. Rubber mats when installed shall lay flat without curling.
CONTROL NUMBER
VERIFICATION
A. The work shall be carefully laid out in advance. Where cutting, channeling, chasing or
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
drilling of floors, walls, partitions, ceilings or other surfaces is necessary for the proper
OF THIS DRAWING IS COVERED, FOR ALL
shall be carefully done and where required, fire rating integrity shall be restored. Any
damage to the piping, equipment or defaced finish plaster, woodwork, metalwork,
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
additional cost to the Employer. Refer to architectural specifications for details and
requirements.
MAS
MAS
C. If holes and/or sleeves are not properly installed and cutting and patching
becomes necessary, it shall be done at no additional expense to the
DESCRIPTION
D. Where other Trades are required to do cutting and patching, furnish to the
General Contractor necessary information so that openings for this work can
be built into the floors and walls in time. Such cooperation is required to keep
cutting of walls and floors to a minimum.
28-00014
required in order to install equipment, conduits, etc., the expense of this cutting
and restoring of surfaces to their original condition shall be borne by this
Contractor.
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE A. Electrical penetrations occur when raceways, cables, wireways, cable trays, or
ENGINEER
ANP busways penetrate concrete slabs, concrete or masonry walls, or fire-rated
12/1/16 floor and wall assemblies.
DATE:
PROJECT
ENGINEER
B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled
MAS
12/1/16
holes or formed openings are used. Install sleeves during erection of slabs and
DATE:
CERTIFIED
walls.
REZ
12/1/16 C. Use pipe sleeves unless penetration arrangement requires rectangular sleeved opening.
DATE:
CONSTRUCTION
AGENCY
AAG
D. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and
wall assemblies unless openings compatible with firestop system used are
12/1/16
DATE: fabricated during construction of floor or wall.
OPERATIONS
SMK
E. Cut sleeves to length for mounting flush with both surfaces of walls.
12/1/16
DATE:
F. Extend sleeves installed in floors 100 mm above finished floor level.
CONTROL NUMBER
VERIFICATION
EDSD
G. Size pipe sleeves to provide 6 mm annular clear space between sleeve and
raceway or cable, unless indicated otherwise.
DATE:
BY:
H. Seal space outside of sleeves with grout for penetrations of concrete and masonry
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
1. Promptly pack grout solidly between sleeve and wall so no voids remain. Tool
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
between sleeve and raceway or cable, using joint sealant appropriate for size,
depth, and location of joint. Comply with requirements in Division 07 Section 07
MAS
MAS
92 00 Joint Sealants.
28-00014
00
12/1/16
B. Use type and number of sealing elements recommended by manufacturer for
DATE:
PROJECT
raceway or cable material and size. Position raceway or cable in center of
ENGINEER
sleeve. Assemble mechanical sleeve seals and install in annular space
MAS
12/1/16
between raceway or cable and sleeve. Tighten bolts against pressure plates
DATE:
CERTIFIED
that cause sealing elements to expand and make watertight seal.
REZ
12/1/16 A. Contractor shall take care to avoid accumulation of debris, boxes, crates, etc.,
DATE:
resulting from the installation of the work. Contractor shall remove from the
CONTROL NUMBER
VERIFICATION
premises each day all debris, boxes, etc., and keep the premises clean,
EDSD
subject to the Saudi Aramco instructions, which shall be promptly carried out.
DATE:
BY:
B. Contractor shall clean up all luminaires and equipment at the completion of the project.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
vacuumed clean prior to energizing equipment and at the completion of the project.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
Aramco for review, outlining all aspects of the testing, including tests to be
performed and the expected results.
DESCRIPTION
28-00014
required, to prove the operation and performance of a system and its equipment.
00
DISCIPLINE
ENGINEER
ANP E. Should the foregoing test reveal any defects, promptly correct such defects
12/1/16 and re-run the tests until the entire installation conforms to the requirements of
DATE:
PROJECT these Specifications and the Drawings.
ENGINEER
MAS
12/1/16
F. Tests requiring certified reports and those requiring factory or field inspection
DATE:
CERTIFIED
shall be conducted and reported to Saudi Aramco in conformance with
REZ standards specified in the applicable sections.
12/1/16
DATE:
CONSTRUCTION
G. In addition to the tests outlined above, after completion of the electrical system
AGENCY
AAG
and prior to occupancy, the following equipment and devices, as a minimum,
12/1/16
shall be thermo graphically inspected.
DATE:
OPERATIONS
1. Feeder splices and Connections.
SMK
2. Switchboard.
12/1/16
3. Panelboards.
DATE:
4. All 400 volt (nominal) cable connections rated 100 amperes or greater.
CONTROL NUMBER
VERIFICATION
company. The inspection shall be made with all equipment, motors, lighting
BY:
fixtures, and miscellaneous loads operating and with equipment covers removed.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
I. Inspection reports complete with color photographs of the infrared scan and
(DCC) NO. _____________________
control photographs indicating the ambient temperature and any hot spots of each item
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
J. The date for the final performance acceptance testing shall comply with the
Project construction schedule and shall be sufficiently in advance of the
Contract completion date to permit the execution of the testing by the
Contractor prior to occupancy and the close-out of the Contract. Specific
attention is required for any special spaces such as Tenant Areas, which will be
ISSUED FOR CONSTRUCTION
acceptance tests indicate as necessary for the proper and satisfactory functioning
of all equipment and systems shall be completed prior to the close-out of the
Contract. Re- tests shall not relieve the Contractor of completion date
responsibility.
A. The Contractor shall provide operating instructions and maintenance data books
for all equipment and materials furnished under this Section.
JO/EWO
28-00014
28-00014
complete lists of replacement parts (including part numbers), motor ratings, and
actual loads.
NO.
REV
00
D. Provide any and all electronic and database information to the clients supplied
EDSD
END OF SECTION
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 - GENERAL
1.1 GENERAL
A. The LSTK CONTRACTOR shall complete the shop drawings, coordination with
ISSUED FOR CONSTRUCTION
1.3 SUMMARY
28-00014
Equipment and Plant to fully execute the requirements to furnish, deliver, and
install the Works as expressly described in the Drawings and Specification, or
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
required that the provisions of this Specification section shall be complementary
ENGINEER
ANP
to, and shall be correlated with, the requirements of the Contract. Nothing in this
12/1/16
specification section shall limit the scope of work as required by the Contract.
DATE:
PROJECT
ENGINEER B. All cables indicated in Drawings are copper conductor.
MAS
12/1/16
DATE: 1.4 REFERENCES
CERTIFIED
REZ
A. Saudi Building Code Chapter 401 – Electrical.
12/1/16
DATE:
CONSTRUCTION
AGENCY B. Saudi Arabian Standards Organization (SASO).
AAG
DATE:
12/1/16 C. International Electrotechnical Commission (IEC).
OPERATIONS 1. IEC 60502 – Power Cables.
SMK 2. IEC 60364 – Low Voltage Installations.
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.6 SUBMITTALS
REZ
ENGG CERT
REZ
28-00014
D. Frequency: 60 Hz
00F1 12/1/16
DATE
10/27/16
00
A. Deliver low voltage electrical power conductors and cables in drums with
DATE:
BY:
sections, lengths and weights that can be moved past obstructions in delivery
path.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B. Remove metal fasteners, loose packing and flammable materials from cable
(DCC) NO. _____________________
28-00014-0002-0001
drums. Store in dry, protected areas with cable ends properly sealed.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
PART 2 - PRODUCTS
REZ
ENGG CERT
REZ
1. Jeddah Cables
2. Riyadh Cables
3. Saudi Cables
DESCRIPTION
4. Ducab
5. Oman Cables
6. Egytech Cables
7. Liban Cables
8. Jordan Cables
9. Al Fanar Electrical Systems
10. Elsewedy Cables
11. Polycab Wire
12. Nuhas Oman
JO/EWO
28-00014
28-00014
00
12/1/16
DATE: 2. IEC 502 type cables shall be rated 600/1000V, shall have a minimum rating of 85
CONSTRUCTION
AGENCY deg C, and shall meet the flame test of IEC 332-3.
AAG
12/1/16
DATE: B. Low voltage unjacketed insulated wires, shall comply with NEC or SSA 55.
OPERATIONS
SMK
1. NEC low voltage wires shall be rated 600V, shall have a minimum temperature
12/1/16
DATE: rating of 90 deg C dry/75 deg C wet, and shall conform to UL Standards according
CONTROL NUMBER
2. SSA 55 type low voltage wires shall be rated 450/750V, shall have a minimum
DATE:
rating of 85 deg C, and shall meet the flame test of IEC 332-1.
BY:
Exception:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
For wiring of equipment such as lighting fixtures, etc., that require higher temperature wires
28-00014-0002-0001
and cables, the above minimum temperature ratings shall be increased accordingly.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
C. Conductors: Power and control conductors shall be stranded copper, except solid
copper conductors 6mm square (10 AWG) and smaller may be used in non-industrial
MAS
MAS
locations. Mineral insulated cables and specialty cables (e.g. down hole pump motor
cables, high temperature cables, etc.) with solid conductors are also permitted.
E. Wiring Insulation for Interior Building Wiring: Unless otherwise indicated, provide
THHN/THWN insulation for all conductor sizes, except for equipment grounding
conductor which may have PVC or thermoplastic insulation (green).
28-00014
00
DISCIPLINE
ENGINEER Conductor – refer to IEC 60502 AND SASO Standards.
ANP
12/1/16
DATE: 2.2.2 ARMORED SINGLE-CORE CABLE CONSTRUCTION DETAILS (NON-FIRE
PROJECT
ENGINEER RATED)
MAS
DATE:
12/1/16 Conductor – refer to IEC 60502 AND SASO Standards.
CERTIFIED
REZ
2.2.3 NON-ARMORED SINGLE-CORE CABLE CONSTRUCTION DETAILS
12/1/16
DATE: (NON-FIRE RATED)
CONSTRUCTION
AGENCY
AAG Conductor – refer to IEC 60502 AND SASO Standards.
12/1/16
DATE:
OPERATIONS 2.3 CABLE DRUMS
SMK
12/1/16 A. All cables shall be supplied on cable drums with a maximum diameter of 2.55m and a
DATE:
maximum width of 1.28m. No drums with cable shall weigh more than 7.5 tons. In
CONTROL NUMBER
VERIFICATION
addition the lengths of cables on the drums shall be in accordance with the Schedule
EDSD
of Quantities.
DATE:
B. The drums shall be stoutly constructed of Timber and supported with steel tie
BY:
bars and shall be fully lagged and bonded. On each flange of each drum a steel
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
plate with tubular steel insert shall be fitted to accept a 100mm diameter
OF THIS DRAWING IS COVERED, FOR ALL
minimum of 400mm x 400mm x 5mm thick, welded to the tubular insert. The
plates shall be fixed with 6 bolts through the flange.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
1. Manufacturer’s name.
MAS
A. Color code secondary service, feeder, and branch circuit conductors with
factory applied color as follows:
JO/EWO
28-00014
28-00014
B Black
C Grey
NO.
REV
00
Neutral Blue
DISCIPLINE
ENGINEER Ground Green-and-yellow
ANP
12/1/16
DATE: B. Except for ground conductor in which green is mandatory, use conductors with
PROJECT
ENGINEER black insulation or jacket and color-code with Scotch No. 35 color-coding tape or
MAS
equivalent for specified insulations and jackets not manufactured by the selected
12/1/16
DATE: vendor with integral colors. Color-code each conductor entering every box,
CERTIFIED
REZ cabinet, panel board, through, and wire way. In wire ways and other locations
12/1/16
where conductors are accessible, color-code conductors every 1500mm (5 FT).
DATE:
CONSTRUCTION
AGENCY
AAG
PART 3 - EXECUTION
12/1/16
DATE: 3.1 GENERAL INSTALLATION REQUIREMENT
OPERATIONS
SMK
A. Cables shall be installed in accordance with SASO and IEC reference standards
DATE:
12/1/16 and the guidance notes published by the Institute of Electrical Engineers.
CONTROL NUMBER
VERIFICATION
B. Minimum leading radiuses for all cables shall not be exceeded as set out in
EDSD
D. The Contractor shall secure the manufacturers instruction with respect to:
OF THIS DRAWING IS COVERED, FOR ALL
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
E. Joints in cables will not generally be permitted unless specifically detailed elsewhere.
REZ
F. All conductors shall be terminated using compression lugs. Screw clamp tyre
MAS
MAS
terminals may however be used for cables with a cross section area of 16mm² or
less.
G. Earthing connectivity bonds shall be provided to all cable armoring. Bonds shall
be as defined in SASO and IEC reference standards.
ISSUED FOR CONSTRUCTION
voltage drop. The cable shall terminate in a junction box or isolator located,
adjacent to the apparatus. The final connectivity shall then be made using
multi core or single core cables as appropriate installed in flexible conduit.
Flexible conduits shall be metal with
P.V.C oversheath. A separate circuit protective conductor shall be installed in all cases.
I. Cable glands shall be installed for all cable terminations for example entries into
switchgear, terminal boxes or other enclosures. Glands shall be brass for steel
wire armored cables and tin nickel plated brass or aluminum alloy for aluminum
armored cables. Glands shall be manufactured in accordance with SASO and IEC
JO/EWO
28-00014
28-00014
reference standard. Locknuts and earthtags shall be provided for each cable and
shall be of the same material as the glands.
00F1 12/1/16
DATE
10/27/16
J. Cables shall be spread/segregated from other services as identified in the table below:
NO.
REV
00
Horizontal
Type of Service Vertical Spacing
DISCIPLINE Spacing
ENGINEER
ANP LV cable - LV cable ** 50mm 300mm
DATE:
12/1/16 LV cable - MV cable 300mm 300mm
PROJECT
ENGINEER
MV cable - MV cable ** 300mm 300mm
MAS LV cable - Communications cable 300mm 300mm
DATE:
12/1/16 MV cable - Communications cable 300mm 300mm
CERTIFIED
REZ
Note - unless shown otherwise on drawings
12/1/16
DATE: ** For single-core cables - distance between the group of cables, not between the cables in
CONSTRUCTION
AGENCY a group
AAG
DATE:
12/1/16 K. Cables shall be supported as identified in the table below. Unless otherwise
OPERATIONS shown on the drawings.
SMK
DATE:
12/1/16 Single-core cables laid in trefoil Secure in purpose-made trefoil cleats
Single-core cables laid side by side Individual secured using non-ferrous cleats
CONTROL NUMBER
VERIFICATION
Fixings for fire rated cables Able to withstand fire for same duration as cable
DATE:
Multi-core cables on ladder or tray In single layer, secured with cable ties
BY:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
M. Spacing of cable clips or saddles shall be as identified in the table below. In addition
cables shall be fixed at 150mm on either side of a set or board.
DESCRIPTION
Horizonta
Overall diameter of cable Vertical Spacing
l
Up to 9mm 250mm 400mm
9-15mm 300mm 400mm
15-20mm 350mm 450mm
20-40mm 400mm 550mm
Above Manufacturer's recommendation
JO/EWO
28-00014
28-00014
A. This relates to tests to be carried out during or after manufacture of the specified
cables. The following tests shall be carried out on each manufactured length of
NO.
REV
00
cable, or sample length as instructed by Saudi Aramco. The tests shall be per
DISCIPLINE
ENGINEER SASO and IEC reference standard
ANP
DATE:
12/1/16 B. Type tests
PROJECT
ENGINEER 1. The entire above test results to be certified and delivered to Saudi Aramco.
MAS
DATE:
12/1/16 C. Special tests
CERTIFIED 1. Conductor examination.
REZ
2. Check of dimensions.
12/1/16 3. Electrical test.
DATE:
CONSTRUCTION
AGENCY
4. Hot set test.
AAG
DATE:
12/1/16 D. Routine tests
OPERATIONS 1. Electrical resistance of conductors.
SMK 2. Insulation resistance between phases, phase and neutral, phase and earth/ground.
DATE:
12/1/16 3. Partial discharge test.
CONTROL NUMBER
VERIFICATION
END OF SECTION
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary
NO.
REV
00
to, and shall be correlated with, the requirements of the Contract. Nothing in this
DISCIPLINE
ENGINEER
specification section shall limit the scope of work as required by the Contract.
ANP
12/1/16
DATE:
PROJECT
ENGINEER
1.3 DESCRIPTION OF WORK
MAS
DATE:
12/1/16 A. This Section includes solid grounding of electrical systems and equipment in
CERTIFIED facilities, which may include, but not limited to:
REZ
12/1/16
DATE: 1. School buildings.
CONSTRUCTION
AGENCY 2. Electrical and Mechanical Equipment Rooms.
AAG
DATE:
12/1/16 C. Grounding of Process control instrumentation and process control systems shall be
in accordance with Electrical system for Instrumentation.
CONTROL NUMBER
VERIFICATION
EDSD
A. Applicable Codes and Standards: Comply with all applicable Codes and
Standards including but not limited to, those listed below:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
tωZ〉〉
Omb u
川← H 'l' 10 卧
去二君 J~ F
Ul Underwriters Laboratories
比。←Z
15;也 t~ Uι467 Grounding ancf Bonding Equipment
川
剧的zouzru国主川剧工←←DO工匕主←zuz=UD口阴阳工←ED国白
';;: S221锺 FZt B Listìno amd Labeüng: Provide products specified in this Section that are listed and
labe!~., 1M term⑤咱 sted!' and "Iabelèd" shall be defined as they are in the NEC ,
AriírcJe 1@:Ø:
主 ι
G. Elewi car C:afflÐonent Standarg: Components and installation shall comply with
,
24 辛苦$捂住也
海 U"" ~ 。 S IB'C 4 Q1 an cS t Þla< NEC: with , the SBCj 40t requirements, prevailing over the NEC
可,li' .p:忏 E ←
懂!ii
rovrsiGs, in aCliclitl oR' tO: the飞 requtrements . specified herein\
,
E式
Dγ FieJ(i如le时tl'la 傲。 anization .
Qualification2: ' To q 峭的 fOr acceptance , the
L 目可 $ 早 吁
AIE
人
ρ
SUBMIT1Al S
5
HJhJ
〈
口=
空垒旦旦到 Submit♀ the, fOllowing , in , accordance with、 Conditions of Contract and
…m
A.
uhZ
叶F
国H
;2黯
飞D口
〈〈
n←
O曲
h田
、 "
Z。
B .-' 、 尸 and吗 connection
H国
Pmdud data f0 1'f ground rods , connectors materials , and grounding
ω0H
fitbmg,s.
器 I~ 1~
h
1Z2HZD
口υ2口DEU国02.OUZ〈国〈吕=〈的LD〉←川
C. Field-t.estiÌ1lQ': organization certificate , signed by the C:;; ontractor , ce 而fying that the
普普拉 I U orQJa防阳就[(;J(Jll perlòrming field、 tests complies with、 tt>le requirements specified in
吨.(DlSCIPtt肉E t&
1 日划GINEiO'R ~~ Q崎~lyA随嗣nGe' above ,
f~À~1ID1nS; ]
O. Repolit 011 岱elâtests, and observations certifíed by the testing organization .
LJ踊路,又
门仨L旦竖一- ~ B'ÄR形:2~正 PHODU'CrS
l队也哩旦旦- --M
ltf C宦:mE2创-,i'".i '. :. MANUFAI口\LIlmE院g
F山~'
E
UoUd民且出口的山工←ω国〈ZU川
LWg阳GTI.0N ,~ ðvailable Manufacturers: Subject to compliance with requirements , manufacturers
L~ , AGENGY I~ offering products that may be incorporated in the Work include, but are not limited to ,
I'i__l"旦旦-liI the follow~1il9:
4ÀT~,哩坐立-B
头 OBEIR:岛市 10利$If
A'. B 二 Chanc:e、 Cø..
L二三r::_K___ [
剧
iiljij
General M.邵阳附 PI'Oøucts Co" Inc.
Kearney- 队Jationav
。~Z/Ged:ney: C(!)<.
i. >1鸟 L 8 运珞
Racb , lnc.
Thomas & Betts (C(i)fp'
ωE
Thermoweld Prodwets
Other A~fiJfO:ved Ma
iiH
i量 iE L
Z 墨E CON町阳c:r刷碗α附'AJ'tGNS,-民ECTRICAL r O~~TY..:E t 川T 向 IIN叫 ORAWINGNO
3 雪 3 运翻JTHf DHAH阳N HO附E ØWERSHIP RR0UECTS - SCHOOLSr DOC 1. &.. ^ I _ I
i ii 当
孟罢昌都,!J时翩翩邸
80川剧AH刚刚E &INNBRSHIP 削刊L
5阐 01 ARABIA
f' A18
[, EWO:
I A I DE-D20114
28-00014-00( 2 |iMni
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
Products: Of types indicated and of sizes and ratings to comply with SBC 401 and the
MAS
MAS
NEC. Where types, sizes, ratings, and quantities indicated are in excess of NEC
requirements, the more stringent requirements and the greater size, rating, and quantity
indications govern.
A. Conductor Materials:
DESCRIPTION
1. Conductors shall be soft drawn copper and shall conform to the following
applicable standards:
a. Solid Conductors: ASTM B-3.
b. Assembly of Stranded Conductors: ASTM B-8.
c. Tinned Conductors: ASTM B-33.
B. Conductors shall be insulated and PVC-jacketed with green or green with yellow
JO/EWO
28-00014
28-00014
00
A. General: UL-listed and labeled as grounding connectors for the materials used.
DISCIPLINE
ENGINEER
ANP
B. Pressure Connectors: High-conductivity-plated units.
12/1/16
DATE:
PROJECT
ENGINEER C. Bolted Clamps: Heavy-duty units listed for the application.
MAS
12/1/16
DATE: D. Exothermic Welded Connections: Provided in kit form and selected for the specific
CERTIFIED
REZ types, sizes, and combinations of conductors and other items to be connected.
12/1/16
DATE:
2.05 GROUNDING ELECTRODES
CONSTRUCTION
AGENCY
AAG
A. Ground Rods: Comply with the following:
12/1/16
DATE:
OPERATIONS
1. Shall be copper, copper-jacketed steel (“Copperweld” or equivalent) or
SMK
galvanized steel. Copper-clad or jacketed steel rod shall be steel with high-
12/1/16
DATE: strength steel core and electrolytic-grade copper outer sheath, molten
CONTROL NUMBER
2. Minimum Size:
DATE:
BY:
conductors.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 3 - EXECUTION
3.01 APPLICATION
A. Equipment Grounding Conductor for Feeder and Branch Circuits: Install separate
ISSUED FOR CONSTRUCTION
Comply with SBC 401 for sizes and quantities of equipment grounding conductors,
except where larger sizes or more conductors are indicated.
28-00014
3. Aluminum cable trays containing only circuits operated at, or below, 50V to
ground may be used as equipment grounding conductors provided the SBC
NO.
REV
00
requirements for such use are met. On other aluminum cable trays,
DISCIPLINE
ENGINEER common equipment grounding conductor external to the cables in the tray
ANP
may be used under the following conditions:
12/1/16
DATE:
PROJECT
ENGINEER a. This common conductor shall be sized in accordance with SBC for
MAS the largest power conductor in the tray, with a minimum size of
12/1/16
DATE: 16mm square.
CERTIFIED b. Connections shall be made between this common grounding
REZ
conductor and other grounding conductors for intersecting or branch
12/1/16
DATE: trays, and to extend the equipment grounding conductor beyond the
CONSTRUCTION
AGENCY tray.
AAG
c. This common conductor (or the largest individual grounding
12/1/16
DATE: conductor, if more than one are installed) shall be bonded to each
OPERATIONS
section of the cable tray system with a connector approved for a
SMK
copper to aluminum connection.
12/1/16
DATE:
CONTROL NUMBER
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
or covered.
MAS
MAS
3.02 INSTALLATION
A. General: Ground electrical systems and equipment in accordance with SBC 401
requirements.
B. Electrical Room Ground Bus: Size, location, and arrangement as indicated. Space
1 inch from wall and support from wall 6 inches above finished floor, except as
JO/EWO
28-00014
28-00014
otherwise indicated.
C. Ground Rods: Locate a minimum of one-rod length from each other and buried at
00F1 12/1/16
DATE
10/27/16
least 460mm below grade. Connect ground conductors to ground rods by means
of exothermic welds, brazing, or approved compression grounding connectors
NO.
REV
00
circulating currents are a problem, ground one end of the cable shield. Install a
VERIFICATION
DATE:
H. Ground metallic raceway conduit at both end points. Grounding with locknuts
BY:
coated conduits, do not scrape the coating to install grounding clamps. Use
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
I Bond metallic cable trays at both end points and a minimum of every 25 meters to
the local ground grid or ground electrode or to structural steel which is bonded to
the local ground grid or ground electrode.
ISSUED FOR CONSTRUCTION
J. Ground busses of motor control centers shall have two connections to the main
DESCRIPTION
ground electrode.
3.03 CONNECTIONS
28-00014
C. Exothermic Welded Connections: Use for connections to structural steel and for
underground connections to ground rods except those at ground test stations.
NO.
REV
00
12/1/16
DATE: D. Terminate insulated equipment grounding conductors for feeders and branch
PROJECT
ENGINEER circuits with pressure-type grounding lugs. Where metallic raceways terminate at
MAS
metallic housings without mechanical and electrical connection to the housing,
12/1/16
DATE: terminate each conduit with a grounding bushing. Connect grounding bushings
CERTIFIED
REZ with a bare grounding conductor to the ground bus in the housing. Bond
12/1/16
electrically non-continuous conduits at both entrances and exits with grounding
DATE:
bushings and bare grounding conductors.
CONSTRUCTION
AGENCY
AAG
E. Tighten grounding and bonding connectors and terminals, including screws and
12/1/16
DATE: bolts, in accordance with manufacturer's published torque tightening values for
OPERATIONS
connectors and bolts. Where manufacturer's torquing requirements are not
SMK
indicated, tighten connections to comply with torque tightening values specified in
12/1/16
DATE: UL 486A and UL 486B.
CONTROL NUMBER
VERIFICATION
correct circumferential pressure for compression connectors. Use tools and dies
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
code or other standard method to make a visible indication that a connector has
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
rods or ground buses, insulate the entire area of the connection and seal against
moisture penetration of the insulation and cable.
MAS
MAS
A. Independent Testing Organization: Arrange and pay for the services of a qualified
independent electrical testing organization to perform tests described below.
ISSUED FOR CONSTRUCTION
B. Tests: Subject the completed grounding system to a megger test at each location
DESCRIPTION
28-00014
00
DISCIPLINE
modify the grounding system to reduce resistance values. Where measures are
ENGINEER directed that exceed those indicated the provisions of the Contract, covering
ANP
12/1/16
changes will apply.
DATE:
PROJECT
ENGINEER E. Report: Prepare test reports, certified by the testing organization, of the ground
MAS
resistance at each test location. Include observations of weather and other
12/1/16
DATE: phenomena that may affect test results. Describe measures taken to improve test
CERTIFIED
REZ results.
12/1/16
DATE:
CONSTRUCTION
3.05 CLEANING AND ADJUSTING
AGENCY
AAG
12/1/16
A. Restore surface features at areas disturbed by excavation and re-establish original
DATE:
grades except as otherwise indicated.
OPERATIONS
SMK
B. Where sod has been removed, replace it as soon as possible after backfilling is
12/1/16
DATE: completed. Restore areas disturbed by trenching, storing of dirt, cable laying, and
CONTROL NUMBER
END OF SECTION
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary
NO.
REV
00
to, and shall be correlated with, the requirements of the Contract. Nothing in this
DISCIPLINE specification section shall limit the scope of work as required by the Contract.
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
1.3 DESCRIPTION OF WORK
MAS
DATE:
12/1/16 This Section includes secure support from the building structure for electrical items by
CERTIFIED means of hangers, supports, anchors, sleeves, inserts, seals, and associated fastenings.
REZ
2. Electrical components shall be listed and labeled by UL, ETL, CSA, BS or other
approved, nationally recognized testing and listing agency that provides third-party
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.5 SUBMITTALS
REZ
ENGG CERT
REZ
spacing, features, and application for each required type of hanger, support,
sleeve, seal, and fastener to be used.
DESCRIPTION
PART 2 - PRODUCTS
2.01 MANUFACTURERS
28-00014
00
DISCIPLINE
1. Slotted Metal Angle and U-Channel Systems:
ENGINEER ABAHSAIN-COPE S.A. LTD.
ANP
12/1/16
Allied Tube & Conduit
DATE:
PROJECT
American Electric
ENGINEER B-Line Systems, Inc.
MAS
GS Metals Corp.
12/1/16
DATE: Unistrut Diversified Products
CERTIFIED
REZ Other Approved Manufacturers
12/1/16
DATE:
CONSTRUCTION
2. Conduit Sealing Bushings:
AGENCY
AAG
12/1/16
Cooper Industries, Inc.
DATE:
OPERATIONS
GS Metals Corp.
SMK
Killark Electric Mfg. Co.
12/1/16
O-Z/Gedney
DATE:
Raco, Inc.
CONTROL NUMBER
VERIFICATION
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
Exception: Plant structural members used as supports for conduit and other
REZ
of SBC 401 and the NEC. Supports include clevis hangers, riser clamps, conduit
28-00014
28-00014
straps, threaded C-clamps with retainers, ceiling trapeze hangers, wall brackets,
and spring steel clamps.
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE 1. Expansion Anchors: Carbon steel wedge or sleeve type, zinc coated
ENGINEER
ANP
(indoor and outdoor use), or stainless steel (corrosive locations).
12/1/16
DATE:
PROJECT 2. Toggle Bolts: All steel springhead type (indoor use only).
ENGINEER
MAS
12/1/16 3. Powder-Driven Threaded Studs: Heat-treated steel, designed specifically
DATE:
CERTIFIED
for the intended service.
REZ
DATE:
12/1/16 C. Conduit Sealing Bushings: Factory-fabricated watertight conduit sealing bushing
CONSTRUCTION assemblies suitable for sealing around conduit, or tubing passing through concrete
AGENCY
AAG floors and walls. Construct seals with steel sleeve, malleable iron body, neoprene
12/1/16 sealing grommets or rings, metal pressure rings, pressure clamps, and cap screws.
DATE:
OPERATIONS
SMK D. Cable Supports for Vertical Conduit: Factory-fabricated assembly consisting of
12/1/16 threaded body and insulating wedging plug for nonarmored electrical cables in riser
DATE:
conduits. Provide plugs with number and size of conductor gripping holes as
CONTROL NUMBER
VERIFICATION
required to suit individual risers. Construct body of malleable-iron casting with hot-
EDSD
fittings and accessories that mate and match with U-channel and are of the same
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
manufacture.
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
C. Pipe Sleeves: Provide pipe sleeves (normally two sizes larger than conduit/pipe
DESCRIPTION
1. Sheet Metal: Fabricate from galvanized sheet metal; round tube closed
with snaplock joint, welded spiral seams, or welded longitudinal joint.
Fabricate sleeves from the following gage metal for sleeve diameter noted:
28-00014
00
DISCIPLINE
D. Hanger Rods: Mild low carbon steel, unless otherwise specified; fully
ENGINEER threaded or threaded each end, with nuts as required to position and lock rod
ANP
12/1/16
in place. All Hanger rods and associated accessories shall be galvanized
DATE:
PROJECT
plated.
ENGINEER
MAS
12/1/16
DATE: PART 3 - EXECUTION
CERTIFIED
REZ
corresponding SASO and IEC reference standards. Minimum rod size shall be 6
VERIFICATION
mm in diameter.
EDSD
DATE:
1. Secure raceways and cables to these supports with two-bolt conduit clamps
(DCC) NO. _____________________
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
3.02 INSTALLATION
MAS
MAS
B. Coordinate with the building structural system and with other electrical installation.
ISSUED FOR CONSTRUCTION
D. Strength of each support shall be adequate to carry present and future load
multiplied by a safety factor of at least four. Where this determination results in a
safety allowance of less than 200 lbs, provide additional strength until there is a
minimum of 200 lbs safety allowance in the strength of each support.
E. Install individual and multiple (trapeze) raceway hangers and riser clamps as
necessary to support raceways. Provide U- bolts, clamps, attachments, and other
hardware necessary for hanger assembly and for securing hanger rods and
conduits.
JO/EWO
28-00014
28-00014
00
DISCIPLINE
serving lighting and receptacle branch circuits above suspended ceilings only. For
ENGINEER hanger rods with spring steel fasteners, use 1/4-inch-diameter or larger threaded
ANP
12/1/16
steel. Use spring steel fasteners that are specifically designed for supporting
DATE:
PROJECT
single conduits or tubing.
ENGINEER
MAS
H. Space supports for raceways in accordance with the following Table. Space
12/1/16
DATE: supports for raceway types not covered by the above in accordance with SBC 401
CERTIFIED
REZ and the NEC.
12/1/16
DATE:
CONSTRUCTION
SPACING FOR RACEWAY SUPPORTS
AGENCY
AAG
is difficult to provide
supports except at interval
DATE:
construction.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
is difficult to provide
supports except at intervals
MAS
MAS
VERTICAL RUNS
½, 3/4 Exposed 7 7 -
DESCRIPTION
1, 1-1/4 Exposed 8 8 -
1-1/2 and Exposed 10 10 -
larger
Up to 2 Shaftway 14 10 -
2-1/2 Shaftway 16 10 -
3 & larger Shaftway 20 10 -
Any Concealed 10 10 -
* Maximum spacings for RSC above apply to straight runs only. Otherwise the
JO/EWO
28-00014
28-00014
00
DISCIPLINE
ENGINEER I. Support exposed and concealed raceway within 1 foot of an unsupported box and
ANP
access fittings. In horizontal runs, support at the box and access fittings may be
12/1/16
DATE: omitted where box or access fittings are independently supported and raceway
PROJECT
ENGINEER terminals are not made with chase nipples or threadless box connectors.
MAS
12/1/16
DATE: J. In vertical runs, arrange support so the load produced by the weight of the raceway
CERTIFIED
REZ and the enclosed conductors is carried entirely by the conduit supports with no
12/1/16
weight load on raceway terminals.
DATE:
CONSTRUCTION
AGENCY
AAG
K. Vertical Conductor Supports: Install simultaneously with installation of conductors.
12/1/16
DATE:
L. Miscellaneous Supports: Support miscellaneous electrical components as required
OPERATIONS
SMK
to produce the same structural safety factors as specified for raceway supports.
Install metal channel racks for mounting cabinets, panelboards, disconnects,
12/1/16
DATE: control enclosures, pull boxes, junction boxes, transformers, and other devices.
CONTROL NUMBER
VERIFICATION
M. In open overhead spaces, cast boxes threaded to raceways need not be supported
EDSD
separately except where used for fixture support. Support sheet metal boxes
DATE:
directly from the building structure or by bar hangers. Where bar hangers are
BY:
used, attach the bar to raceways on opposite sides of the box and support the
APPROVAL/CERTIFICATION REQUIREMENTS,
raceway with an approved type of fastener not more than 24 inches from the box.
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
N. Sleeves: Install in concrete slabs and walls and all other fire- rated floors and walls
28-00014-0002-0001
for raceways and cable installations. For sleeves through fire-rated wall or floor
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
construction, apply UL- listed firestopping sealant in gaps between sleeves and
REZ
ENGG CERT
REZ
enclosed conduits and cables in accordance with "Fire Resistant Joint Sealers"
requirement of Division 16 Section 16050.
MAS
MAS
O. Conduit Seals: Install seals for conduit penetrations of slabs on grade and exterior
walls below grade and where indicated. Tighten sleeve seal screws until sealing
grommets have expanded to form watertight seal.
ISSUED FOR CONSTRUCTION
P. Fastening: Unless otherwise indicated, fasten electrical items and their supporting
hardware securely to the building structure, including but not limited to conduits,
DESCRIPTION
28-00014
2. Do not weld conduit, pipe straps, or items other than threaded studs to steel
00F1 12/1/16
DATE
10/27/16
structures.
00
DISCIPLINE
ENGINEER Q. Holes cut to depth of more than 1-1/2 inches in reinforced concrete beams or to
ANP
depth of more than 3/4 inch in concrete shall not cut the main reinforcing bars. Fill
12/1/16
DATE: holes that are not used.
PROJECT
ENGINEER
MAS
R. Ensure that the load applied to any fastener does not exceed 25 percent of the
12/1/16
DATE: proof test load. Use vibration- and shock- resistant fasteners for attachments to
CERTIFIED
REZ concrete slabs.
12/1/16
3.03 TESTS:
DATE:
CONSTRUCTION
AGENCY
AAG
When directed by Company Representative to provide testing of fasteners, comply with
12/1/16
the following:
DATE:
OPERATIONS
SMK
A. Test pull-out resistance of one of each type, size, and anchorage material for the
following fastener types:
12/1/16
DATE:
CONTROL NUMBER
1. Expansion anchors.
VERIFICATION
EDSD
2. Toggle bolts.
DATE:
BY:
B. Provide all jacks, jigs, fixtures, and calibrated indicating scales required for reliable
(DCC) NO. _____________________
28-00014-0002-0001
testing.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
C. Obtain the Structural Engineer's approval before transmitting loads to the structure.
REZ
ENGG CERT
REZ
D. Test to 90 percent of rated proof load for fastener. If fastening fails test, revise all
MAS
MAS
similar fastener installations and retest until satisfactory results are achieved.
END OF SECTION
ISSUED FOR CONSTRUCTION
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 - GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
specification section shall limit the scope of work as required by the Contract.
00
DISCIPLINE
ENGINEER
ANP This Section includes raceways normally used in SAUDI ARAMCO facilities for
DATE:
12/1/16 electrical wiring. Types of raceways in this section include the following:
PROJECT
ENGINEER
MAS 1. Rigid steel conduit.
12/1/16
DATE:
CERTIFIED 2. Electrical Metallic Tubing (EMT).
REZ
DATE:
12/1/16 3. Flexible Metal Conduit.
CONSTRUCTION
AGENCY
AAG 4. Liquid tight Flexible Metal Conduit.
12/1/16
DATE:
OPERATIONS 5. Rigid PVC conduit.
SMK
DATE:
12/1/16 6. Non-metallic conduit.
CONTROL NUMBER
VERIFICATION
1.3 REFERENCES
EDSD
DATE:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
1.4 DESCRIPTION
ISSUED FOR CONSTRUCTION
Conduits are required for all final branch circuits unless shown or specified
otherwise.
B. Definitions: The term conduit, as used in this specification, shall mean any or all
of the raceway types specified.
1.5 DEFINITIONS
28-00014
00
DISCIPLINE
E. IMC: Intermediate metal conduit.
ENGINEER
ANP
12/1/16
F. LFMC: Liquidtight flexible metal conduit.
DATE:
PROJECT
ENGINEER
G. LFNC: Liquidtight flexible nonmetallic conduit.
MAS
12/1/16
DATE:
CERTIFIED
H. NBR: Acrylonitrile-butadiene rubber.
REZ
12/1/16
A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA,
DATE:
AND SAMPLES, furnish the following:
CONTROL NUMBER
VERIFICATION
B. Shop Drawings:
EDSD
1. Size and location of conduits, cable trays and trunking requiring integration
DATE:
4. The specific item proposed and its area of application shall be identified on
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
a. Cable trays.
b. Enclosures and cabinets.
MAS
MAS
c. For handholes and boxes for underground wiring, including the following:
1) Duct entry provisions, including locations and duct sizes.
2) Frame and cover design.
3) Grounding details.
4) Dimensioned locations of cable rack inserts, and pulling-in and lifting irons.
ISSUED FOR CONSTRUCTION
5) Joint details.
6. Coordination Drawings:
DESCRIPTION
a. Raceway routing plans, drawn to scale, on which the following items are
shown and coordinated with each other, based on input from installers of
the items involved:
1) Structural members in the paths of conduit groups with common supports.
2) HVAC and plumbing items and architectural features in the paths of
conduit groups with common supports.
7. Manufacturer Seismic Qualification Certification:
a. Submit certification that enclosures and cabinets and their mounting
provisions, including those for internal components, will withstand seismic
forces defined in Division 26. Include the following:
JO/EWO
28-00014
28-00014
00
DISCIPLINE
including its interior accessibility, after the seismic event."
ENGINEER 2) Dimensioned Outline Drawings of Equipment Unit: Identify center of
ANP
12/1/16
gravity and locate and describe mounting and anchorage provisions.
DATE:
PROJECT
3) Detailed description of equipment anchorage devices on which
ENGINEER the certification is based and their installation requirements.
MAS
12/1/16
DATE: 1.7 QUALITY ASSURANCE
CERTIFIED
REZ
12/1/16
A. Manufacturers: Firms regularly engaged in manufacture of the complete range
DATE:
CONSTRUCTION
of all supporting devices and ancillary electrical connection materials including
AGENCY
AAG
connectors, terminals, equipment supports, etc., whose products have been in
satisfactory use in similar services for not less than 5 years. Preference shall
12/1/16
DATE: be given to local manufacturers and suppliers/agents.
OPERATIONS
SMK
B. Installer: Firms regularly engaged and qualified with at least 5 years of
12/1/16
DATE: successful installation experience on projects with electrical installation work
CONTROL NUMBER
C. All type of products used for installation of equipment connections and supports
shall comply with SASO, NEC, NEMA, ASTM and AWS.
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.8 REFERENCES
REZ
ENGG CERT
REZ
A. Comply with the applicable SASO and IEC reference standard for the following:
MAS
MAS
D. Adapters
H. Steel trunking
I. Non-metallic Trunking
JO/EWO
28-00014
28-00014
1.09 COORDINATION
A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
ENGINEER
B. Coordinate installation of roof curbs, equipment supports, and roof penetrations,
ANP as specified in Division 07.
12/1/16
DATE:
PROJECT
ENGINEER
1.10 WARRANTY
MAS
DATE:
12/1/16 A. Refer to Division 1.
CERTIFIED
REZ
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
DATE:
12/1/16 Contractor to provide the manufacturer’s standard warranty period but shall not be
CONSTRUCTION less than the duration stipulated in contract.
AGENCY
AAG
DATE:
PART 2 - PRODUCTS
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. Manufacturers:
MAS
28-00014
B. Manufacturers:
1. Abahsain-Cope Saudi Arabia Co. Ltd.
2. Saudi Steel Pipe Company Limited.
00F1 12/1/16
DATE
10/27/16
00
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
B. Available Manufacturers:
REZ
ENGG CERT
REZ
A. EMT - Electrical metallic tubing (thin-wall) and fittings shall be galvanized steel.
C. Manufacturers
1. Abahsain-Cope Saudi Arabia Co. Ltd.
2. Saudi Steel Pipe Company Limited.
3. MK Cable management Saudi Arabia Limited.
JO/EWO
28-00014
28-00014
B. All preformed elbows shall be similar in construction to, and of a type designed for
NO.
REV
00
12/1/16 E. RGS shall be used for transition from underground PVC conduit to SEC meter
DATE:
CONSTRUCTION and to main panel boards and/or switchboards.
AGENCY
AAG
12/1/16
2.7 NON-METALLIC CONDUIT TUBING
DATE:
OPERATIONS
A. Schedule 40 PVC
SMK
12/1/16
DATE: B. Fittings to match conduit type
CONTROL NUMBER
VERIFICATION
C. Manufacturers
EDSD
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. Sheet Metal Outlet and Device Boxes: Per applicable SASO and IEC
reference standard.
C. Cast-Metal Outlet and Device Boxes: Per applicable SASO and IEC reference
standard, ferrous alloy with gasketed cover.
D. Nonmetallic Outlet and Device Boxes: Per applicable SASO and IEC
reference standard.
JO/EWO
28-00014
28-00014
E. Metal Floor Boxes: Per applicable SASO and IEC reference standard, cast metal,
fully adjustable, rectangular.
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
ENGINEER
ANP
G. Small Sheet Metal Pull and Junction Boxes: Per applicable SASO and IEC
12/1/16
reference standard.
DATE:
PROJECT
ENGINEER H. Cast-Metal Access, Pull, and Junction Boxes: Per applicable SASO and IEC
MAS
reference standard, galvanized, cast iron with gasketed cover.
12/1/16
DATE:
CERTIFIED
REZ I. Hinged-Cover Enclosures: Per applicable SASO and IEC reference standard, IP
12/1/16
67, with continuous-hinge cover with flush latch, unless otherwise indicated.
DATE:
CONSTRUCTION
1. Metal Enclosures: Steel, finished inside and out with manufacturer's
AGENCY
AAG
standard enamel.
2. Nonmetallic Enclosures: Plastic, finished inside with radio-frequency-
12/1/16
DATE: resistant paint.
OPERATIONS
SMK
J. Cabinets:
12/1/16
DATE: 1. Per applicable SASO and IEC reference standard, IP 31, galvanized-steel box
CONTROL NUMBER
with removable interior panel and removable front, finished inside and out with
VERIFICATION
2. Hinged door in front cover with flush latch and concealed hinge.
3. Key latch to match panel boards.
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
A. Description:
MAS
2. Configuration: Units shall be designed for flush burial and have closed
bottom, unless otherwise indicated.
3. Cover: Weatherproof, secured by tamper-resistant locking devices and
having structural load rating consistent with enclosure.
ISSUED FOR CONSTRUCTION
4. Cover Finish: Nonskid finish shall have a minimum coefficient of friction of 0.50.
28-00014
00
12/1/16 A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40,
DATE:
PROJECT galvanized steel, plain ends.
ENGINEER
MAS
12/1/16
B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron
DATE:
CERTIFIED
pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
REZ
12/1/16 C. Sleeves for Rectangular Openings: Galvanized sheet steel with minimum 1.3- or
DATE:
CONSTRUCTION
3.5- mm thickness as indicated and of length to suit application.
AGENCY
AAG
D. Coordinate sleeve selection and application with selection and application of
12/1/16
DATE: firestopping specified in Division 07.
OPERATIONS
SMK
2.11 SLEEVE SEALS
12/1/16
DATE:
CONTROL NUMBER
A. Description: Modular sealing device, designed for field assembly, to fill annular
VERIFICATION
cable.
2. Pressure Plates: Stainless steel. Include two for each sealing element.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
pressure plates to sealing elements. Include one for each sealing element.
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
A. Handhole and Pull-Box Prototype Test: Test prototypes of handholes and boxes
MAS
for compliance with ANSI / SCTE 77 Tier 22, unless noted otherwise.
MAS
PART 3 - EXECUTION
DESCRIPTION
28-00014
00
4. Concealed above Ceilings and in Interior Walls and Partitions: EMT or Cable Tray.
a. Connection to Vibrating Equipment (Including Transformers and Hydraulic,
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
D. Raceway Fittings: Compatible with raceways and suitable for use and location.
1. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings,
DESCRIPTION
28-00014
3.2 INSTALLATION
00F1 12/1/16
DATE
10/27/16
00
F. Conduit / trunking installations under fume and vent hoods are prohibited.
EDSD
G. Secure conduits to cabinets, junction boxes, pull boxes and outlet boxes with a
DATE:
conduit coupling and hexagon male smooth bore bush (Brass). Do not make
BY:
H. Unless otherwise indicated on the drawings or specified herein, all conduits and
(DCC) NO. _____________________
28-00014-0002-0001
trunking in public spaces shall be installed concealed within finished walls, floors
and ceilings.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
Contractor shall identify on the drawings all such locations and provide details of
MAS
J. Live terminations are not permitted in any part of the conduit installation including
associated boxes and other accessories.
K. Steel Conduit - Additional Requirements.
ISSUED FOR CONSTRUCTION
28-00014
00
1. All non-metallic conduits shall be heavy gage as per applicable SASO and
DISCIPLINE
ENGINEER
IEC reference standard.
ANP
2. All bends and sets in non-metallic conduits shall be formed using an
12/1/16
DATE: appropriate bending machine. Internal springs shall be used to prevent
PROJECT
ENGINEER collapse of the conduit wall. Conduits up to a size of 25mm may be cold set.
MAS 3. Boxes for use with non-metallic conduits shall have web mounded spouts and
12/1/16 brass thread inserts.
DATE:
CERTIFIED
REZ
4. Saddles and spacing’s shall be as those detailed for metallic conduits.
12/1/16
DATE: M. Arrange stub-ups so curved portions of bends are not visible above the finished
CONSTRUCTION
AGENCY slab.
AAG
DATE:
12/1/16 N. Install no more than the equivalent of three 90-degree bends in any conduit run
OPERATIONS except for communications conduits, for which fewer bends are allowed.
SMK
DATE:
12/1/16 O. Conceal conduit and EMT within finished walls, ceilings, and floors, unless
otherwise indicated.
CONTROL NUMBER
VERIFICATION
EDSD
slab support.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
expansion fittings.
(DCC) NO. _____________________
28-00014-0002-0001
3. Change from ENT to rigid steel conduit before rising above the floor.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
T. Raceways for Optical Fiber and Communications Cable used for electrical
controls: Install raceways, metallic and nonmetallic, rigid and flexible, as follows:
1. 20-mm Trade Size and Smaller: Install raceways in maximum lengths of 15m.
2. 25-mm Trade Size and Larger: Install raceways in maximum lengths of 25m.
3. Install with a maximum of two 90-degree bends or equivalent for each length
of raceway unless Drawings show stricter requirements. Separate lengths with
pull or junction boxes or terminations at distribution frames or cabinets where
necessary to comply with these requirements.
JO/EWO
28-00014
28-00014
U. Install raceway sealing fittings at suitable, approved, and accessible locations and
fill them with listed sealing compound. For concealed raceways, install each fitting
00F1 12/1/16
DATE
10/27/16
in a flush steel box with a blank cover plate having a finish similar to that of
adjacent plates or surfaces. Install raceway sealing fittings at the following points:
NO.
REV
00
8. Install each expansion-joint fitting with position, mounting, and piston setting
selected according to manufacturer's written instructions for conditions at
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
10. Use LFMC or LFNC in damp or wet locations not subject to severe
physical damage.
MAS
MAS
X. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of
masonry block, and install box flush with surface of wall.
Y. Set metal floor boxes level and flush with finished floor surface.
ISSUED FOR CONSTRUCTION
Z. Set nonmetallic floor boxes level.Trim after installation to fit flush with finished
floor surface.
DESCRIPTION
A. Direct-Buried Conduit:
1. Excavate trench bottom to provide firm and uniform support for conduit.
Prepare trench bottom as specified in Division 31 for pipe less than 150 mm in
nominal diameter.
2. Install backfill as specified in Division 31.
3. After installing conduit, backfill and compact. Start at tie-in point, and work
JO/EWO
28-00014
28-00014
toward end of conduit run, leaving conduit at end of run free to move with
expansion and contraction as temperature changes during this process. Firmly
hand tamp backfill around conduit to provide maximum supporting strength.
00F1 12/1/16
DATE
10/27/16
After placing controlled backfill to within 300 mm of finished grade, make final
conduit connection at end of run and complete backfilling with normal
NO.
REV
00
12/1/16 A. Install handholes and boxes level and plumb and with orientation and depth
DATE:
coordinated with connecting conduits to minimize bends and deflections required
CONTROL NUMBER
VERIFICATION
C. Elevation: In paved areas, set so cover surface will be flush with finished grade.
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
D. Install removable hardware, including pulling eyes, cable stanchions, cable arms,
REZ
ENGG CERT
REZ
and insulators, as required for installation and support of cables and conductors
and as indicated. Select arm lengths to be long enough to provide spare space for
MAS
MAS
future cables, but short enough to preserve adequate working clearances in the
enclosure.
holes for terminating fittings to be used, and seal around penetrations after fittings
are installed.
DESCRIPTION
B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled
holes or formed openings are used. Install sleeves during erection of slabs and
walls.
JO/EWO
28-00014
28-00014
C. Use pipe sleeves unless penetration arrangement requires rectangular sleeved opening.
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE 2. For sleeve cross-section rectangle perimeter equal to, or greater than, 1200
ENGINEER
ANP mm and 1 or more sides equal to, or greater than, 400 mm, thickness shall be
12/1/16 3.5 mm.
DATE:
PROJECT
ENGINEER
E. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall
MAS
12/1/16
assemblies unless openings compatible with firestop system used are fabricated
DATE:
CERTIFIED
during construction of floor or wall.
REZ
12/1/16 F. Cut sleeves to length for mounting flush with both surfaces of walls.
DATE:
CONSTRUCTION
AGENCY
AAG
G. Extend sleeves installed in floors 100 mm above finished floor level.
12/1/16
DATE: H. Size pipe sleeves to provide 6 mm annular clear space between sleeve and
OPERATIONS
raceway unless sleeve seal is to be installed.
SMK
DATE:
12/1/16 I. Seal space outside of sleeves with grout for penetrations of concrete and masonry.
CONTROL NUMBER
VERIFICATION
between sleeve and raceway, using joint sealant appropriate for size, depth, and
location of joint. Refer to Division 07 for materials and installation.
DATE:
BY:
partitions, ceilings, and floors at raceway penetrations. Install sleeves and seal
OF THIS DRAWING IS COVERED, FOR ALL
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
mechanical sleeve seals. Select sleeve size to allow for 25 mm annular clear
MAS
space between pipe and sleeve for installing mechanical sleeve seals.
B. Use type and number of sealing elements recommended by manufacturer for raceway
material and size. Position raceway in center of sleeve. Assemble mechanical sleeve
seals and install in annular space between raceway and sleeve. Tighten bolts against
pressure plates that cause sealing elements to expand and make watertight seal.
3.7 FIRESTOPPING
JO/EWO
28-00014
28-00014
00
DATE:
12/1/16 3.9 PROTECTION
CONSTRUCTION
AGENCY
AAG
A. Provide final protection and maintain conditions that ensure coatings, finishes,
12/1/16
and cabinets are without damage or deterioration at time of Substantial
DATE:
OPERATIONS
Completion.
SMK
1. Repair damage to galvanized finishes with zinc-rich paint recommended by
12/1/16
manufacturer.
DATE:
2. Repair damage to PVC or paint finishes with matching touchup
CONTROL NUMBER
VERIFICATION
DATE:
END OF SECTION 26 05 33
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
26 05 36 - CABLE TRAYS
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP
DATE:
12/1/16 1.3 DESCRIPTION OF WORK
PROJECT
ENGINEER
MAS A. This section includes Hot Dip Galvanized and aluminum cable trays.
12/1/16
DATE:
CERTIFIED 1.4 RELATED DOCUMENTS
REZ
12/1/16 A. Drawings and general provisions of the Contract, including General and
DATE:
CONSTRUCTION
AGENCY
Supplementary Conditions and Division 01 Specification Sections, apply to this
AAG Section.
12/1/16
DATE:
OPERATIONS 1.5 REFERENCES:
SMK
1.6 SUBMITTALS
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B. Product Data: Include data indicating dimensions and finishes for each type of
cable tray indicated.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
D. Coordination Drawings: Floor plans and sections, drawn to scale. Include scaled
cable tray layout and relationships between components and adjacent structural,
electrical, and mechanical elements. Show the following:
1. Vertical and horizontal offsets and transitions.
2. Clearances for access above and to side of cable trays.
3. Vertical elevation of cable trays above the floor or bottom of ceiling structure.
JO/EWO
28-00014
28-00014
00
D. Epoxy/Polyester coated cable tray shall be stored indoors. Protect cable tray
DATE:
BY:
from scratching and marring of finish. Unpack and dry wet materials before
storage.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
1.9 WARRANTY
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
MAS
Contractor to provide the manufacturer’s standard warranty period but shall not
MAS
D. During the guarantee period the manufacturer shall make all necessary repairs or
DESCRIPTION
PART 2 - PRODUCTS
2.1 MANUFACTURERS
28-00014
12/1/16
B. Concealed, Exterior Installations:
DATE:
1. Cable trays and associated accessories designed for exterior use shall be
CONTROL NUMBER
VERIFICATION
heavy duty aluminum, complying with applicable SASO and IEC reference
standard powder coated with UV resistant epoxy/polyester..
EDSD
DATE:
C. Cable Trays, base materials, Fittings, and Accessories: all bends, T connections
BY:
width reduction parts etc. shall be by the same manufacturer as the cable tray.
APPROVAL/CERTIFICATION REQUIREMENTS,
3. Supplier shall provide test certificates of corrosion resistance for tests done in
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
the presence of most common inorganic acids and alkalis confirming the
REZ
ENGG CERT
REZ
A. Fittings: Tees, crosses, risers, elbows, and other fittings as indicated, of same
materials and finishes as cable tray.
28-00014
of cable trays. Supplementary earth bonding shall be provided. This shall take
the form of an earth strap with a minimum cross sectional area of 4mm².
NO.
REV
00
DISCIPLINE
2.4 WARNING SIGNS
ENGINEER
ANP
12/1/16
A. Lettering: 40-mm high, black letters on yellow background with legend
DATE:
PROJECT
"WARNING! NOT TO BE USED AS WALKWAY, LADDER, OR SUPPORT FOR
ENGINEER LADDERS OR PERSONNEL." in English and Arabic.
MAS
B. Materials and fastening are specified in Division 26 Identification for Electrical
12/1/16
DATE: Systems.
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY PART 3 - EXECUTION
AAG
DATE:
12/1/16 3.1 CABLE TRAY AND LADDERS INSTALLATION
OPERATIONS
SMK A. Comply with recommendations in applicable SASO and IEC reference standard,
DATE:
12/1/16 the manufacturer and the local Wiring Regulations. Install as a complete system,
including all necessary fasteners, hold-down clips, splice-plate support systems,
CONTROL NUMBER
VERIFICATION
barrier strips, hinged horizontal and vertical splice plates, elbows, reducers, tees,
EDSD
and crosses.
DATE:
B. Remove burrs and sharp edges from cable trays fit plastic end caps on support
BY:
channel ends.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
C. Cable tray system shall be able to carry the weight of the installed cables, plus
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
E. Cable trays shall be bonded to the building’s grounding system at intervals not
exceeding 15m. When cable tray is insulated from a metallic supporting structure
bonding jumpers shall be provided.
ISSUED FOR CONSTRUCTION
F. Fasten cable tray supports to building structure and install seismic restraints.
1. Design each fastener and support to carry load indicated by seismic
requirements and to comply with seismic-restraint details according to
DESCRIPTION
Division 26.
2. Place supports so that spans do not exceed maximum spans allowed by
codes and standards, and manufacturers recommendations. Supports shall
be arranged to ensure that the maximum deflection of the fully loaded tray
does not exceed 1/360 of the span length. Supports shall additionally be
placed at either side of bends or intersections and at all changes of direction.
3. Construct supports from channel members, threaded rods, and other
appurtenances furnished by cable tray manufacturer. Supports shall be
manufactured from the same materials as the cable tray unless otherwise
JO/EWO
28-00014
28-00014
00
DATE:
12/1/16 G. Make connections to equipment with flanged fittings fastened to cable tray and to
PROJECT
ENGINEER
equipment. Support cable tray independent of fittings. Do not carry weight of cable tray
MAS on equipment enclosure.
12/1/16
DATE:
CERTIFIED H. Install expansion connectors where cable tray crosses building expansion joint
REZ
and in cable tray runs that exceed dimensions recommended in the relevant
12/1/16 standards. Space connectors and set gaps according to applicable standard.
DATE:
CONSTRUCTION
AGENCY
AAG I. Make changes in direction and elevation using standard fittings.
12/1/16
DATE:
OPERATIONS J. Make cable tray connections using standard fittings.
SMK
12/1/16
K. Seal penetrations through fire and smoke barriers according to Division 07.
DATE:
CONTROL NUMBER
L. Sleeves for Future Cables: Install capped sleeves for future cables through
VERIFICATION
DATE:
M. Workspace: Install cable trays with enough space to permit access for installing cables.
BY:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
P. Where cable trays receive minor damage during the course of the construction
works the galvanized surfaces shall be repaired by applying a zinc rich epoxy
primer – applied in accordance with the manufacturer’s instructions.
ISSUED FOR CONSTRUCTION
Q. Cutting of cable trays shall be along a plain line of material and shall not be made
along the line of the perforations in the cable tray.
DESCRIPTION
28-00014
S. Where cable trays are broken to enable cables to pass through walls proprietary
sleeves shall be installed to facilitate installation and later withdrawal. Where
cables pass through fire rated walls/floors sleeves shall be galvanized steel.
00F1 12/1/16
DATE
10/27/16
Where walls are non fire rated sleeves shall be Heavy gage P.V.C. Sleeves shall
have a minimum diameter of 25mm larger than the cable or bunch of cables
NO.
REV
DISCIPLINE
ENGINEER
ANP T. Sleeves passing through walls or floors shall extend for 50mm either side of the
12/1/16 penetration.
DATE:
PROJECT
ENGINEER
U. All holes through fire rated elements shall be sealed using proprietary products to
MAS
12/1/16
ensure that the original fire integrity of the element is maintained. Where holes
DATE:
CERTIFIED
pass through external walls additional sealing shall be provided using flexible
REZ rubber boot or shroud over sleeve projection.
12/1/16
DATE:
CONSTRUCTION V. For horizontal runs of cable trays /ladder trays, provide minimum 250 mm clear
AGENCY
AAG space from top and on side of tray, to facilitate cable installation.
12/1/16
DATE:
OPERATIONS
W. Where cable trays /ladders carrying power cables and conductors cross cable
SMK
trays for communication systems, provide minimum 150 mm clear space
12/1/16
between the top of the lower tray and bottom of the upper tray.
DATE:
CONTROL NUMBER
VERIFICATION
A. Install cables only when cable tray installation has been completed and inspected.
DATE:
BY:
enough to secure the cable, without indenting the cable jacket. Install cable ties
(DCC) NO. _____________________
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
450mm. Cable ties are not permitted. Install intermediate supports when cable
weight exceeds the load-carrying capacity of the tray rungs.
MAS
MAS
3.3 CONNECTIONS
ISSUED FOR CONSTRUCTION
A. Earth cable trays according to the requirements of the local Wiring Regulations.
A. After installing cable trays and after electrical circuitry has been energized,
survey for compliance with requirements. Perform the following field quality-
control survey:
1. Visually inspect cable insulation for damage. Correct sharp corners,
JO/EWO
28-00014
28-00014
00
DATE:
12/1/16 B. Report results in writing.
OPERATIONS
SMK 3.5 PROTECTION
12/1/16
DATE:
A. Protect installed cable trays.
CONTROL NUMBER
VERIFICATION
protection for cables and cable tray can be constructed of wood or metal
DATE:
END OF SECTION 26 05 36
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 05 39 - CABLE TRUNKING
REZ
ENGG CERT
REZ
MAS
MAS
PART 1 - GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP B. This Section includes the following:
12/1/16
DATE:
PROJECT
ENGINEER 1. Underfloor/Incavity floor trunking systems.
MAS 2. Trench type underfloor trunking systems.
12/1/16
DATE: 3. General purpose lighting and power trunkings.
CERTIFIED
REZ 4. Floor Boxes.
12/1/16
DATE:
CONSTRUCTION
AGENCY
1.3 DESCRIPTION
AAG
DATE:
12/1/16 A. Drawings and general provisions of the Contract, including General and
OPERATIONS Supplementary Conditions and Division 01 Specification Sections, apply to this
SMK Section.
12/1/16
DATE:
B. This section specifies the furnishing, installation, and connection of the underfloor
CONTROL NUMBER
VERIFICATION
personnel safety and to provide a low impedance path to ground for possible
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
1.5 REFERENCES:
28-00014
1.6 DEFINITIONS:
NO.
REV
A. Flush Floor Outlet Box: Used with raised modular flooring system, or with in-
00
DISCIPLINE screed trunking systems. The box shall house power receptacle and
ENGINEER
ANP communications outlet plates below a hinged lid. The hinged lid shall finish flush
DATE:
12/1/16 with the respective floor surface. The lid shall be recessed to accept
PROJECT carpet/ceramic tile as appropriate for the area used. Lids shall be provided with
ENGINEER
MAS flap type entry for routing of flexible power cords or communication cables.
12/1/16
DATE:
CERTIFIED B. Slab Box: Used in conjunction with raised modular flooring systems. Slab boxes
REZ shall be located in the floor cavity fixed directly to the structural floor. The box will
DATE:
12/1/16 house power receptacle and communication outlet plates. Slab boxes shall be
CONSTRUCTION used in conjunction with “grommet” plates recessed into the floor tile, providing
AGENCY
AAG flexible cable access to the slab box below.
12/1/16
DATE:
OPERATIONS C. In-screed trunking: Rectangular cross-section trunking with a removable lid
SMK installed with the top of the trunking flush with the surface of the concrete in
12/1/16 which it is embedded. Trunking lid shall accept floor covering i.e. Carpet/Ceramic
DATE:
tile.
CONTROL NUMBER
VERIFICATION
E. In-cavity Trunking: Underfloor trunking and outlet installed with the top of the
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
fixed portion of the connector assemblies located below the surface of the floor or
(DCC) NO. _____________________
floor covering and arranged to receive plug connectors with the bodies of the
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
equipment.
G. Underfloor Trunking: A conduit, duct, or trench located within the floor material,
floor cavity or with its top at the floor surface.
ISSUED FOR CONSTRUCTION
1.7 SUBMITTALS:
DESCRIPTION
28-00014
00
d. FA (Fire Alarm).
VERIFICATION
e. Controls
EDSD
mounting method, vertical supports, materials, fire stops, weather stops, and
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
13. Show fabrication and installation details for enclosed bus assemblies. Include
REZ
ENGG CERT
REZ
28-00014
00
DISCIPLINE
specified in Division 01, include the following:
ENGINEER 1. Manufacturer's written instructions for installing afterset inserts.
ANP
12/1/16
DATE: 1.8 QUALITY ASSURANCE:
PROJECT
ENGINEER
MAS A. All systems and associated components shall comply in all respects with the
12/1/16
DATE: requirements of applicable SASO and IEC reference standards and local wiring
CERTIFIED regulations. General purpose power outlets single or duplex associated with
REZ
floor trunking systems shall comply with the requirement of applicable SASO and
12/1/16
DATE: IEC reference standards. Communications outlet plates shall house Cat 6 type
CONSTRUCTION
AGENCY RJ45 receptacles as defined in the Civil Utilities specifications. Underfloor power
AAG
distribution shall comply with applicable SASO and IEC reference standard.
12/1/16
DATE:
OPERATIONS B. Testing Agency's Field Supervisor: Currently certified by an NRTL to supervise
SMK
on-site testing.
12/1/16
DATE:
C. Source Limitations for Electrified Cellular Steel Floor-Deck Components: Obtain
CONTROL NUMBER
VERIFICATION
header ducts, and trench header ducts from the cellular steel floor-deck
manufacturer.
DATE:
BY:
D. Source Limitations: For each building obtain components for each system
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
in the local wiring regulations, by a qualified testing agency, and marked for
REZ
ENGG CERT
REZ
1.10 COORDINATION
A. Furnish extra materials described below that match products installed and that
are packaged with protective covering for storage and identified with labels
describing contents.
1. Afterset Inserts: Furnish quantity equal to 10 percent of service fittings installed.
JO/EWO
28-00014
28-00014
00
DISCIPLINE 5. Tap-off Units: Furnish quantity equal to 25 percent of each type used on the project.
ENGINEER
ANP 6. Floor boxes: Furnish quantity equal to 25 percent of those used in the raised
12/1/16 floor areas.
DATE:
PROJECT
ENGINEER
B. Furnish six (3) set(s) of tools needed for installing afterset inserts in underfloor
MAS
12/1/16
service trunking, including but not necessarily restricted the following:
DATE:
CERTIFIED
1. Electric Drill: Variable speed, capacity to suit the application.
REZ 2. Hole Saw: Diamond bit, 50-mm size to suit the application.
12/1/16 3. Insert installation tool.
DATE:
CONSTRUCTION
AGENCY
AAG
1.12 WARRANTY
12/1/16
DATE: A. Refer to Section 017836 - Warranties.
OPERATIONS
SMK
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
12/1/16
DATE: Contractor to provide the manufacturer’s standard warranty period but shall not
CONTROL NUMBER
D. During the guarantee period the manufacturer shall make all necessary repairs or
replacement to achieve conformity to the requirements of the Contract
(DCC) NO. _____________________
28-00014-0002-0001
Documents.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
PART 2 - PRODUCTS
MAS
MANUFACTURERS
MAS
2.1
28-00014
00
DATE:
12/1/16 B. Header Assembly: A junction box and trunking arrangement arranged to feed
CONSTRUCTION
AGENCY
wires and cables to service trunkings.
AAG 1. Three-compartment junction box connecting blank, underfloor header
DATE:
12/1/16 trunking (no inserts) with cellular service trunkings.
OPERATIONS a. Arrange junction box in the center of 150cm length of header trunking.
SMK b. Header trunking shall have same dimensions as service trunkings.
DATE:
12/1/16 c. Provide capability for service trunkings to be run in both directions
from intersection with header trunking.
CONTROL NUMBER
VERIFICATION
multichannel header trunking (no inserts) and fitted to connect with cellular
service trunking at right angles to header trunking.
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
intersection, and access location. Include the following accessories and features:
1. Mounting brackets.
2. Escutcheons and holders to accommodate surrounding floor covering.
3. Means for leveling and height adjustment more than 10 mm before
ISSUED FOR CONSTRUCTION
B. Floor box flush in-screed or recessed within floor tile, Multiple System Floor
Outlet box for Rectangular Inserts: Include mounting, hinged cover, and trim to
JO/EWO
28-00014
28-00014
00
should be duplex switched type in accordance with applicable SASO and IEC
DISCIPLINE reference standard, suitable for use with 3 pin plug top.
ENGINEER
ANP
DATE:
12/1/16 C. Flush or Recess Monitored Floor Box: Modular fittings compatible with preset
PROJECT inserts and shall include covers; provisions for receptacles, jacks, and
ENGINEER
MAS connectors; and associated device plates for indicated systems. Include hinged
12/1/16 flush handhole covers with recessed depth to match thickness of floor finish
DATE:
CERTIFIED material. Provide for internally mounted receptacle- and communication-jack and
REZ
connector assemblies complying with requirements in Division 26 Wiring Devices
DATE:
12/1/16 and Voice and Data Communication Cabling.
CONSTRUCTION 1. Power receptacles.
AGENCY
AAG 2. Telephone-data jacks.
DATE:
12/1/16 3. Double duplex power receptacles.
OPERATIONS 4. Duplex power receptacle and duplex telephone-data jacks.
SMK 5. Double duplex telephone-data jacks, Category 6.
DATE:
12/1/16 6. Fiber-optic cable connector.
CONTROL NUMBER
VERIFICATION
D. Slab Floor Box: Modular fittings compatible with preset inserts and shall include
EDSD
covers, provisions for receptacles jacks and connector assemblies and wiring
extensions to wall-mounted outlets, and associated device plates for indicated
DATE:
systems. Include flush handhole covers, recessed to suit floor finish material.
BY:
comply with requirements in Division 26 Wiring Devices and Voice and Data
OF THIS DRAWING IS COVERED, FOR ALL
Communication Cabling.
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
E. Water-proof cover: A water-proof cover shall be provided for each floor box to
protect it when not in use.
28-00014
A. Trunkings for use with general purpose power and lighting branch circuits shall
be provided in accordance with BS 4678. Trunkings shall be steel (unless
00F1 12/1/16
DATE
10/27/16
otherwise indicated on the drawings) Steel trunking shall have a hot dipped
galvanized finish to applicable SASO and IEC reference standard class 3.
NO.
REV
00
DISCIPLINE B. The contract drawings show main cable trunking routes only. These shall be
ENGINEER
ANP supplemented by the contractor as necessary to provide a complete cable
DATE:
12/1/16 containment system.
PROJECT
ENGINEER
MAS C. Trunkings shall be provided with screw fixed lid, screws shall be slotted set
12/1/16 screws. Lids shall wherever possible be fixed on top.
DATE:
CERTIFIED
REZ D. Trunkings shall generally be run either horizontally or vertically and shall be
DATE:
12/1/16 installed parallel/perpendicular to building lines.
CONSTRUCTION
AGENCY
AAG E. Where Trunkings are installed above suspended ceilings trunking shall be
12/1/16 independently fixed. It will not be acceptable to fix trunkings to the ceiling support
DATE:
OPERATIONS
system.
SMK
12/1/16
F. All bends, sets and Tee’s etc shall be manufacturer’s standard fittings only. Site
DATE:
manufactured bends shall not be permitted.
CONTROL NUMBER
VERIFICATION
H. At building movement joints expansion couplings shall be used. These are not
28-00014-0002-0001
indicated on the drawings. The Contractor shall determine the location of all such
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
I. Earth continuity straps shall be placed across all joints in cable trunkings. Straps
MAS
MAS
J. Fire barriers shall be placed in trunkings in order to maintain the fire integrity of
the structure. Proprietary fire barriers shall be provided with a rating which is not
ISSUED FOR CONSTRUCTION
K. All trunking surfaces that receive superficial damage during installation shall be
repaired using zinc rich epoxy primer in accordance with the manufacturer’s
instructions.
28-00014
Finish
Lighting & Steel
Hot dip
All Areas E XX Series
power galvanised
00F1 12/1/16
Bench Top
DATE
10/27/16
galvanised
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
Fixing
PROJECT Compartments
ENGINEER Type of Overall Overall method
MAS
trunking Depth Width or other
12/1/16 Numbe Width
DATE:
details
CERTIFIED r
REZ Lighting &
12/1/16 Power
DATE:
CONSTRUCTION Bench By Contractor
AGENCY
AAG Top
12/1/16
DATE:
OPERATIONS
SMK Note 1- This Data Sheet covers trunking for final circuits, including types incorporating
12/1/16 accessories. Note 2- In screed trunking to be multiple compartment, typically 75mmx50mm
DATE: with 3 compartments.
CONTROL NUMBER
VERIFICATION
EDSD
PART 3 – EXECUTION
DATE:
BY:
3.1 EXAMINATION
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
A. Examine substrates, areas, and conditions, with Installer present, for compliance
(DCC) NO. _____________________
performance.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
B. Proceed with installation only after unsatisfactory conditions have been corrected.
REZ
ENGG CERT
REZ
3.2 INSTALLATION
MAS
MAS
A. Install trunkings aligned and leveled and, unless otherwise indicated, parallel or
perpendicular to building walls.
Install supports securely at ends and at intervals not to exceed 1500 mm, to
prevent movement during concrete pour.
DESCRIPTION
C. Level trunking components with finished slab and make adjustments for floor finishes.
D. Adjust supports to maintain a 1.6- to 10-mm finished concrete cover over preset
inserts.
F. Cap or plug boxes, insert- and service-fitting openings, and open ends of trunkings.
G. Seal trunkings, cells, junction boxes, and inserts to prevent water, concrete, or
JO/EWO
28-00014
28-00014
foreign matter from entering trunkings before and during pouring slab or placing
fill. Tape joints, or seal with compound, as recommended in writing by underfloor
00F1 12/1/16
DATE
10/27/16
trunking manufacturer.
H. Junction Boxes: Install tops level and flush with finished floor. Install blank
NO.
REV
00
DISCIPLINE
closure plates or plugs to close unused junction-box openings. Grout boxes in
ENGINEER place to prevent movement during construction. Place top covers in inverted
ANP
12/1/16
position during construction to prevent damage to surface of cover. Reinstall
DATE:
PROJECT
covers in proper position prior to final acceptance of Work.
ENGINEER
MAS
I. Earth underfloor trunking components.
12/1/16
DATE:
CERTIFIED J. Level trunking components with finished slab and make adjustments in trunking
REZ
component elevation to accommodate indicated floor finishes.
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE: END OF SECTION 26 05 39
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
required that the provisions of this Specification section shall be complementary to,
and shall be correlated with, the requirements of the Contract. Nothing in this
NO.
REV
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE: 1.3 DESCRIPTION OF WORK
PROJECT
ENGINEER
MAS A. This section includes underground electrical work including the following:
12/1/16
DATE:
CERTIFIED
REZ
B. Definitions
12/1/16
DATE: 1. Duct: The general term for electrical conduit and other raceway, either
CONSTRUCTION
AGENCY metallic or nonmetallic, specified for use underground, embedded in earth
AAG
or concrete.
12/1/16
DATE:
OPERATIONS
2. Duct Bank: A group of two or more ducts in a continuous run between two
SMK
points.
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
A. Codes and Standards: Comply with all applicable Codes and Standards including,
DATE:
BY:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
Engineers (ANSI/ASME)
REZ
ENGG CERT
REZ
28-00014
1.5 SUBMITTALS
NO.
REV
00
12/1/16
DATE: B. Product data for duct bank materials, and miscellaneous components. Include:
PROJECT
ENGINEER
MAS
Raceways and fittings.
12/1/16
DATE: Raceway supports.
CERTIFIED
REZ
12/1/16
C. Shop Drawings: Detail drawings of Duct Banks including reinforcing steel.
DATE:
CONSTRUCTION
AGENCY
AAG
D. Coordination drawings showing duct profiles and coordination with other utilities
12/1/16
and underground structures.
DATE:
OPERATIONS
SMK
1.6 DELIVERY, STORAGE, AND HANDLING
12/1/16
DATE: A. Deliver ducts to site with ends capped. Store non-metallic ducts with supports to
CONTROL NUMBER
A. Subsurface conditions were investigated during the design of the project. Reports
APPROVAL/CERTIFICATION REQUIREMENTS,
of these investigations are available for informational purposes only. Data in the
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
continuity of conditions (between soil borings or test kits). The Owner will assume
no responsibility for interpretations or conclusions drawn from this material.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
during the design of the project. Reports of these investigations are available for
informational purposes only. Data in the reports are not intended as
representations or warranties of accuracy regarding conditions and locations. The
this information.
DESCRIPTION
A. Coordination of the Work: Coordinate layout and installation with final arrangement
of ducts/ duct bank as influenced by actual final location of other utilities in the field.
Coordinate elevations of duct/ duct bank and raceway entrances into Buildings with
final profiles of conduits as determined by coordination with other utilities and
underground obstructions. Revise locations and elevations from those indicated as
required to suit field conditions.
JO/EWO
28-00014
28-00014
PART 2 - PRODUCTS
00F1 12/1/16
DATE
10/27/16
2.01 MANUFACTURERS
00
DISCIPLINE
offering products that may be incorporated in the Work include but are not limited
ENGINEER to the following:
ANP
12/1/16
DATE:
PROJECT
B. Manufacturers: Subject to compliance with requirements, provide products by one
ENGINEER of the following:
MAS
12/1/16
DATE: 1. Nonmetallic Ducts:
CERTIFIED
REZ
A. General: Ducts and duct fittings and accessories for which listing has been
EDSD
B. General: Ducts and duct fittings and accessories for which listing has been
APPROVAL/CERTIFICATION REQUIREMENTS,
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
A. Duct Supports: Rigid PVC spacers selected to provide minimum duct spacings
and concrete cover depths indicated, while rigidly supporting ducts during
concreting.
28-00014
as 35 deg F. Compound shall not slump at a temperature of 300 deg F and shall
10/27/16
00
materials, and the common metals. Compound shall have no injurious effect on
DISCIPLINE
ENGINEER worker's hands or materials.
ANP
12/1/16
DATE: PART 3 - EXECUTION
PROJECT
ENGINEER
MAS
3.01 WIRING METHOD
12/1/16
DATE:
CERTIFIED
REZ A. General: Install ducts for wiring runs indicated. Provide sizes as indicated.
12/1/16
DATE:
CONSTRUCTION
1. Single Duct Runs: PVC-coated galvanized rigid steel conduit, direct buried in
AGENCY
AAG
earth.
12/1/16
DATE:
2. Duct Banks: Heavy wall plastic utilities duct type DB, encased in concrete.
OPERATIONS
SMK
3. Duct Banks: PVC-coated galvanized rigid steel conduit buried in earth.
12/1/16
DATE:
CONTROL NUMBER
duty, hydraulic-operated compaction equipment shall not be used and trenching for
BY:
required pitch.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
stones, soft spots, and sharp objects. Where necessary, add a 3-inch layer
of stone-free sand or earth to trench bottom and compact to density of
MAS
MAS
adjacent undisturbed soil to provide suitable bearing for ducts. Backfill over
and around ducts on bottom of trench with stone-free sand or earth to 6
inches minimum above tops of ducts and compact by hand or pneumatic
tamper to density of adjacent undisturbed earth.
ISSUED FOR CONSTRUCTION
3. For each additional layer of direct-buried ducts above bottom ducts, backfill
over and around each layer of ducts with stone-free sand or earth to 6
DESCRIPTION
A. Curves and Bends: Use manufactured elbows for stub-ups at equipment and at
JO/EWO
28-00014
28-00014
building entrances. For all other curves and bends, except as otherwise indicated,
use manufactured long sweep bends with a minimum radius of 25 ft. in both
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
manufacturer's instructions. Couplings shall be staggered so those of adjacent
ENGINEER ducts do not lie in the same plane.
ANP
12/1/16
DATE:
PROJECT
C. Duct Entrances to Buildings: Steel or schedule 80 PVC conduit. Transformations
ENGINEER from underground duct to conduit shall be made 6.5 ft. (2.0 meters) minimum,
MAS
outside the building wall and shall use fittings manufactured for the purpose. Install
12/1/16
DATE: in accordance with the following:
CERTIFIED
REZ
seal.
EDSD
anchored into the masonry construction with one or more integral flanges
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
following:
G. Concreting: Spade concrete carefully during pours to prevent voids under and
between conduits and at exterior surface of envelope. Do not use power-driven
agitating equipment unless specifically designed for duct bank application. Pour
each run of envelope between terminations in one continuous operation. Where
more than one pour is necessary, terminate each pour in a vertical plane and install
3/4-inch reinforcing rod dowels extending 18 inches into the concrete on each side
of the joint near the corners of the envelope.
H. Reinforcing: Reinforced duct banks where they cross disturbed earth and where
indicated. Size and arrangement of reinforcing steel as indicated.
JO/EWO
28-00014
28-00014
I. Forms: The walls of the trench may be used to form the side walls of the duct bank
00F1 12/1/16
DATE
10/27/16
provided the soil is self-supporting and concrete envelope can be poured without
soil inclusions. Use forms where the soil is not self-supporting.
NO.
REV
00
DISCIPLINE
J. Minimum Clearances Between Ducts: Three inches between ducts and exterior
ENGINEER envelope wall, 2 inches between ducts for like services, and 4 inches between
ANP
12/1/16
power and signal ducts.
DATE:
PROJECT
ENGINEER K. Depth: Except as otherwise indicated, top of duct bank shall be 24 inches below
MAS
finished grade, minimum, in nontraffic areas, and 30 inches below finished grade,
12/1/16
DATE: minimum, in vehicular traffic areas.
CERTIFIED
REZ
12/1/16 L. Stub-ups: Duct stub-ups to equipment shall be galvanized rigid steel. For
DATE:
CONSTRUCTION
equipment mounted on outdoor concrete pads, steel conduit shall extend a
AGENCY
AAG
minimum of 5 ft. away from edge of pad. Install insulated grounding bushings on
12/1/16
the terminations. The steel conduits shall be coupled to the ducts with adapters
DATE:
OPERATIONS
designed for the purpose and the whole encased with 3 inches of concrete.
SMK
12/1/16
M. Sealing: For ducts to be wired in this project, provide temporary closure at
DATE:
terminations. For spare ducts, seal bore of ducts at terminations. Use sealing
CONTROL NUMBER
VERIFICATION
DATE:
N. Pulling Cord: Install 100-pound test nylon cord in ducts including spares.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
rod and submit a report of the results. Use an instrument specifically designed for
REZ
ENGG CERT
REZ
B. Duct Integrity: Rod ducts with a mandrell 1/4-inch smaller in diameter than internal
diameter of ducts. Where rodding indicates obstructions in ducts, remove the
obstructions and retest.
A. Clean Ducts: Clean full length of ducts with a round bristle brush with a diameter
DESCRIPTION
28-00014
indicated.
00F1 12/1/16
DATE
10/27/16
END OF SECTION
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 1 – GENERAL
MAS
MAS
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
Construction of the facility.
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary to,
00F1 12/1/16
DATE
10/27/16
and shall be correlated with, the requirements of the Contract. Nothing in this
specification section shall limit the scope of work as required by the Contract.
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
1.3 RELATED DOCUMENTS
12/1/16
DATE:
PROJECT
1.3.1 Drawings and general provisions of the Contract, including General and
ENGINEER Supplementary Conditions and Division 01 Specification Sections, apply to
MAS
this Section.
12/1/16
DATE:
CERTIFIED
REZ 1.4 RELATED SECTIONS
12/1/16
DATE:
CONSTRUCTION
1.4.1 Site painting of electrical work: Section 09 Painting.
AGENCY
AAG
1.5 REFERENCE DOCUMENTS
12/1/16
DATE:
OPERATIONS 1.5.1 Applicable SASO reference standards
SMK
1.5.2 International Electrotechnical Commission (IEC)
DATE:
12/1/16 1.5.2.1IEC 60364 – Low Voltage Electrical Installations
1.5.3 NFPA 70 – National Electrical Code.
CONTROL NUMBER
VERIFICATION
EDSD
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
B. Installer: Firms regularly engaged and qualified with at least 5 years of successful
REZ
ENGG CERT
REZ
PART 2 - PRODUCTS
A. Lamicoid Nameplates: 3 mm thick plastic engraving sheet, black face, white core,
mechanically attached, sizes as follows:
1. Size 1: 12 mm high with 5 mm high letters.
DESCRIPTION
28-00014
PART 3 - EXECUTION
00
DISCIPLINE
ENGINEER
ANP
A. Electrical equipment shall be prefinished in coded colors designating voltage or
12/1/16
system, as indicated in Equipment Identification Schedule.
DATE:
PROJECT
ENGINEER B. Voltage color identification for line voltage equipment shall be as follows:
MAS
12/1/16
DATE: Voltage Color
CERTIFIED
REZ 230/400 V: Grey
12/1/16
DATE:
CONSTRUCTION
System Color
AGENCY
AAG
Fire Alarm and Fire Telephone: Red
12/1/16
Telephone Cabinets: Green
DATE:
OPERATIONS
Low Voltage Switching: Black
SMK
Annunciator Cabinets: Black
12/1/16
RFTV Distribution: Orange
DATE:
Computer and Data Systems: Orange
CONTROL NUMBER
VERIFICATION
AVTV: Green
Electrical Door Lock: Yellow
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
28-00014
A. Apply color banding tape in required colors for each voltage or system in 25 mm
wide bands all around conduit or cable as follows:
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
ENGINEER B. Apply color banding on electrical conduit / wireway and cable in the following
ANP
12/1/16
locations as defined in Section 09: Painting.
DATE:
PROJECT
1. Exposed in service areas.
ENGINEER 2. Exposed in unfinished areas.
MAS
3. Semi-concealed spaces.
12/1/16
DATE: 4. Exposed to Exterior.
CERTIFIED
REZ
12/1/16
3.5 IDENTIFICATION OF PULL AND JUNCTION BOXES
DATE:
CONSTRUCTION
AGENCY A. Identify pull and junction boxes over 100 mm size as follows:
AAG
1. Use boxes which are prefinished in coded colors, or spray paint inside and
12/1/16
DATE: outside of boxes prior to installation, in coded colors designating voltage or
OPERATIONS
system.
SMK
2. Apply size 2 lamicoid nameplate to cover of each box.Identify system name.
12/1/16
DATE: Where sequence identification is required, identify system name and number.
CONTROL NUMBER
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. Identify wiring larger than 1.5 mm² by continuous insulation color or by color
MAS
D. Where multi-conductor cables are used, use same color coding system for
ISSUED FOR CONSTRUCTION
A. Identify 6 mm² wiring and larger using one of the wire identification materials
specified in 2.1.
B. Type or print on blank wire identification materials using indelible black ink.
C. Identify wiring at all pull boxes, junction boxes, and outlet boxes for all systems.
JO/EWO
28-00014
28-00014
00
Nameplate
VERIFICATION
Equipment Color
EDSD
Nameplate Identification
Size
DATE:
BY:
- Main breaker
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
Metering cabinet 2
REZ
ENGG CERT
REZ
protective device
- Metering devices 1
28-00014
00
mnemonics Magnetic Mo
DISCIPLINE
ENGINEER
tor
ANP Starters
12/1/16 and
DATE:
PROJECT
ENGINEER Contac
MAS tors
12/1/16
DATE:
CERTIFIED
REZ
Wireways N/A - Voltage and system designation 2
Line Voltage Voltage - Designation and voltage 2
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16 Lamicoid
DATE:
Nameplate
OPERATIONS Equipment Color
SMK Nameplate Identification
Size
12/1/16
DATE:
Cabinets and Color - Major components within cabinets and
CONTROL NUMBER
VERIFICATION
1
Enclosures enclosures
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
END OF SECTION 26 05 53
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
required that the provisions of this Specification section shall be complementary to,
and shall be correlated with, the requirements of the Contract. Nothing in this
NO.
REV
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE: 1.3 DESCRIPTION OF WORK
PROJECT
ENGINEER
MAS A. This Section includes over current protective devices (OCPDs) rated 600V and
12/1/16
DATE: below and switching devices commonly used with them.
CERTIFIED
REZ
12/1/16
B. Panelboards: Application, installation, and other related requirements for over
DATE:
current protective device installations in distribution equipment are specified in
CONSTRUCTION
AGENCY other Division 16 sections.
AAG
12/1/16
DATE: 1.4 QUALITY ASSURANCE
OPERATIONS
SMK
A. Electrical Component Standard: Components and installation shall comply with
12/1/16
DATE: SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70 "National Electrical
CONTROL NUMBER
Code," with the SBC 401 requirements prevailing over the NFPA 70 provisions.
VERIFICATION
EDSD
B. Listing and Labeling: Provide products specified in this Section that are listed and
DATE:
labeled.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
1. The terms "listed" and "labeled" shall be defined as they are in the National
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
1.5 SUBMITTALS
B. Product data for fuses, fusible switches, circuit breakers, and OCPD accessories
DESCRIPTION
specified in this Section, including descriptive data and time-current curves for all
protective devices and let- through current curves for those with current limiting
characteristics. Include coordination charts and tables and related data.
A. Maintenance Stock Fuses: For types and ratings required, furnish spare fuses,
amounting to one unit for every 5 installed units, but not less than one set of 3 of
each kind.
JO/EWO
28-00014
28-00014
PART 2 - PRODUCTS
00F1 12/1/16
DATE
10/27/16
2.01 MANUFACTURERS
00
DISCIPLINE
offering products that may be incorporated in the Work include, but are not limited
ENGINEER to, the following:
ANP
12/1/16
DATE:
PROJECT
B. Manufacturers: Subject to compliance with requirements, provide products by the
ENGINEER following:
MAS
12/1/16
DATE: 1. Molded-Case Circuit Breakers:
CERTIFIED
REZ
Maximum)."
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
A. General: UL 489, "Molded Case Circuit Breakers and Circuit Breaker Enclosures,"
REZ
ENGG CERT
REZ
C. Characteristics: Indicated frame size, trip rating, number of poles, and a short-
ISSUED FOR CONSTRUCTION
28-00014
G. Enclosure for motor control center mounting: Provide individual mounting where
00F1 12/1/16
DATE
indicated.
10/27/16
00
12/1/16
2. Adjustability: Breaker ratings and trip settings shall be changeable by
DATE:
CONSTRUCTION
operation of controls on front panel of breaker, by change of plug-in
AGENCY
AAG
element without removing breaker from mounting, or by a combination of
12/1/16
the two methods.
DATE:
OPERATIONS
SMK
3. Ground-Fault Tripping: Adjustable for pick-up and time-delay values.
Provide for indicated units.
12/1/16
DATE:
CONTROL NUMBER
PART 3 – EXECUTION
VERIFICATION
EDSD
3.01 EXAMINATION
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
自 Z宝。的←HUK←
到~I~ hav@ lD:eel11 ass:emli>led'. OVel1euma时 protective devices that have not been
蝉 jg
Dzω的ZDUZω
submitteet amt é1lippfôV@d p>r阳r to c00fdination study may not be used in study.
←k 国主 ω工←kdO
j;1; Gathsr aOO tâ'b也11:ate the foU'Owin@ illlput da幅 to sUp J)û rt coordination study:
1[. If'roøud Data f(ilf (j)v.eF创Iment Ji)roteciive øeviees spedf.ie <d: in other Ði'ìl<ision 26
$eetrcoos afllCli! ifl 'ltÐ'IVed ~Pl øVeV(l:U Ffient prote c:tillB deMice coørdi Fl atiø F! sìudies.
如:
工』主← z…
lY5,e ' e.qlìli~.meAt øe~!matiQI'l tags that are consistent with electriGal
dislributiom s.ys恒m el.i agrams, 0>VefCurrent pr0tective device submittals , input
HE2U口
潜在 ii 配 a~可flii Ollllput Gfata , arrrd 阳efJ.lim l1Jilended cdevrce settings.
21; !饰rfl}eæFlC.e (i),f utirFrny seNfce'、 emtFa:n<!:e
D自工← zou-h
SS !Bedrìωt. E)js~fI'iOOfi(i)n 5彭stem Diagram: In hard-copy and electrOflfc-cøpY,
伽I1fillats, sl:\'t.ο,wing the f(!)U~wïH~:
a.. C~帧盹'F盹f咆εω
阳咄唰
肌itι
U 胁
F也切
bli1ea
甜}快
ke
即ralil
司1、'(!j\ 仙't!.lse-萨刊
fi 创刨
e
ω 圳IlJ
U
草划陌丁' F
附
川dZ
u
剧H
队飘lRelai)!s an(i} assøciateø Ji)0We F' and CUFrent transfolimer ratings and ratios.
b
〈←田。…出
c. Transf(!}rrner kil例。It ampe F' es , prima 叩 and secondary voltages ,
C0nneetiofl type , imJDedan<e e , and X/R ratios
44〈主的←国a
cl!.. Calo:tes: h7tetilta:æ c:(i)Jll~clh!JiiJt material , s~:z: es ø,f C0F叫 UCtOfS , conducìm
j;fiJa,terrÞat , i附电l:ta~i!即1、 al1'd length.
吃roc
~ØBl lNsr众lì..1LAτbON
;;L-T h
y eE肝.IFIIBil1 ~
3k.G:21,
ldenä螃 00阴阳ne'fl!ts i,n. a C;C;elF<1fa rneewiih [)ivision 16 Section "Electricalldenìificatio F'l."
CONill民Qι 以必R~NG ~I/\JiSτh\LlAτtON
川odι出口的 ω工←川剧国Z
diÄfE: 1 旦旦旦-1 Di\ÞiSfOIi1略 Seeti0n "Wires and Cables" fOf hard wired connections
…
Dτ E: .Ii
A. ~k C@:r1'flectOil毡, termi 阳帖, bus joints , and mou Fl tings fQr tightness Tighten field-
,
〈E 国U工口 UZH
eÐÐ fl'ecte Q> eCmf!l6ctøfls and terminals , including screws and bolts , in aCGordance
w.ith e~uip'men~ manufacturer's published torque tightening values. Where
〈←zouzo-←〈ztDHLZ工
J;(1;'ft: GROtJ协Dtþ.\t(G;
gωlíl<1ttf1g.
! c叫叫栅阳TRUC
阳阳町
阳川
Uω
c口m羽τI删唰倒…盼归叩盹邸n;:阳阳阳τm阳仰附 E叫
t旺E朋m
町盯附阳叫
c盹且 | 阳忖
ι…m
啊…叫叫E叫|忡阳N盯T 叫
H工的←
DRAWING NO
(烟翻姐盹摞附削。剧
HA州"阳州邸唰跚E 唰ER'
陇酬罚阿莎叩
F 阳阳lEÆ:.
俩 '耐市-5'部
eH阳O。饥
凶s
L 叫
叫I ÐOC I ___ I I
SOUTHDH,翩翩帆。阻E <llllll阻附HIP AJ'tι 1 A18 I A I DE-D20114
lzlOOF1
EDSDj2616.-0399 :doc
SAUDI AHABIAN OIL COMPANY
dZEOELDE
2且@8l' FIE 七 D ' QU:AL 阿YCûN1ROL
出 ZDUEEZEE-o
Ä. ' |naepelild e.mtτesthno ûnoani2ê1tio r,r Arrange and pay for the services of an
indelile'f1(del\l~ eteetrical 饺到stìng organi:zation to perform tests and observations on
OCJDD也.
B::.>;: 旦旦是旦旦~: Prrepave: w'ri ,tite l'Jll pe~ F1:5 eertified by Testing CDrganization on tests and
工匕主← Z E B U P 臼王军 庄
obs剧iVatìofiTs,. lRepø f1l de负~etiY$e materials and workmanship and l:msatisfact0叩 te5t
resul:ts. l,ncJwd'e: oomp恰te ne.eø.rEis 0;1 Fepairs and adjustrnents mao:e
C. L坐豆监g: liJJ1l<i).fIi S础is1actoey C(j)lll fDl创iOfl of tests and rel'ated eft,侃, apply a label to
tes恒d <C 0 f1l1l pone:f!1ts inoieatin9 恒Sl res,ults , date , and responsible organ恒 atio n. and
perS<D n.
HZH声由 254
D. · $ 主cl:l皇量监皇 visual'
and mechanical iFl spections and el怆
ectr川ica
刽1 怡
t'es
剖ts with 剖
at 陆
1 eas
卧t one
week's advance notification.
主的医
E Pretes.tinoí. l);PÆH'} compl'eti'lilg installation of the s附em , perform the følløwing
prep;aratioAS f:ou indepeooent test5:
EZEDJ=ZHZDEED
Make' insulation resistance tests of OCPD buses , components , and
<c oRlileding supply , feeder , and control circuits ,
国20ZEOUEgEDas
3': !ppov irle: s:e:t m Qlf"trad Ðocuments to test personne.l. Include 缸H upäaHng
Ofli finaf sysfem C.Ofl白9uration and parameters where they sUJ!)plement or
diffe:Ff.VO;m tiilose 阳di~ed ffl original Contract Oocuments,.
4~ Pro ide I!naflufadure f"s instfuctions for installatioll aFl d testing of OCPDs to
'ì,l
test, pefisonnel.
主 EEZJDZZ
F ViS I!J忽1 aflo: meεnaflllÌcat ilílsoe.c.tion: Include the following inspections and related
work.
←自〈
setling5 to lDe apprQpriate for final system arrangement and parameters. Where
ZHEEBZ
dise.repaneies a陀 f~und, ~est ørgafl~zatio f1 shall recommend finat protective device
rati.mgs arld sei1 i'ngs,. LJse a(i;cepted revised ratings Gl r settings to make the final
system a<<t1:l!Jstmems,
〈←ZOUZOEEDLZZZ
~nspeet tOf cdefeds and physical damage , NRTl labeling , and nameplate
compliance with C::lJrrrent single line diagram.
2: lE:xe r,cise and perf(!) r, m øperational teslS of all mechanical compO Fl ents and
øtt1 eF operable devices in accordance with manufacturer's instFuction
←口 ZZZ
manu,al.
豆豆。出←
DE-D20114
OOF1
28.- 00014-0002
飞川
_' "可
dEZE
wreneh. Refer t0 man:ufaeturel地 instr-uctions fol' proper tOF q,Ue v-alues.
比。←Z旧的ZOUEE
4 Clean 0CPDs ustn g. rnan时actufer's ap fDr0ved methods and materials.
5-. 、 Veri:fy iflstaHation 0f pf<1lper 1'u se types and rati l'lgs in fusibte <D~PDs.
室里←
1'1\ Elèctrical、 节es悔 kndude: the f <1ll 1ÐWi'fil g iter:n s per::formed i J'i), aceordanee with
=ozk 主星星
manufactur凹'8 instrudii(i}J1ls:
BEmHFED
less: than 11QO me90hli'li'IS is nøt aeceptabte.
2. CO l'l taet resistance test (i),f, r:neasurement of mimvolt drop a([;ross eøntacts of.
drawøut eirel!1it b~eakefs at r勘ed eu,nrent. Compare Gontaet resi.s tance 0 1'
国LBZHd←ED 崽」」主已经且
mi HivØ:比 ør(!1p va阳es (!}f a伽i:eJil.t poles an ø. of' similar breakers,. Deviatiøns 01'
more tha fi} 56 percent are 1'l 0~ acce阱able.
ZHg 」42比ZHZOEEgBdDZDUEgs23
phase. I‘ nsufatiøn resistanre fess than 10@ megohms is n'Ot aeceptable.
哩L崖D
Ðeterrnine gfOllI'nd!-fa:u 民 cuvrent pickup and corresponding delay
口P国且出口E
time ,
的E
5. Verify trfp unit reset characte r. istics for insulated心ase cÞrcuit breakers.
军
ZHEESZH 〈←zouzo-
6. Make adj ustme 时s for wnal 5e柑ngs 01 adjustable-trip devfces.
10. Check key and other intef~ock and safety devices for operation and
REV O
M川
DE-D20114
OOF1
28-00014-0002
SAUÐI ARABtAN OIL COMPANY
duzZELDE
seqNeI'l<re'. M拙e ctosing attempts on 10cked-øfJen and opening attempts on、
l E)'e~ee-cl.osecj dev.j ces including moveable barrrers a f'1!d shuUers
出 ZOUEE
B盟垦st: C:ørrecd a~fíeiencies, identified by tests and olD servations and provide
re:幅sNn~' of OCPDs t,,~ tesHn~ orgaA~zati"Ün. Vefi'市~ Ðy the system tests tha t.
罢
Sfllee涌创, r> eqwflìements afe met
E ←←HJDE主← ZEDUD己的HEED 庄
,.
3..00 GltB~e强协蜓L
ZO-
←03g
UÐÐ!lkC瞅瞅销JD.filt ~ ilíls幅tl~捕。肉~, ir斗s,ped OC.PDs. Remωe I\)aimt slD la忧 ers and øthe~ spots ,
←由zoogou
撒哈 andi el否如 fs.τ。阳.111< UjD'; s:cratefl'es and mars (i)J íinish t o, maieh (ilFÎglÎf1 al finish.
3矶市ð: ßÆ:M0,~li~T[OO'
比。川
EEEK-EE
3剧
BZH 声回 25
A. 直窒圄mg: Arra.f'Tgß' amet pa~ f0~ tÞTe serviees of factoliY-authorized喇 service
晒呻一
8;) ♀旦旦盛监E盛主 a mi
呐n
川叫叫in
叫1丁 im
叽r.l 川
UI汀m
」主的 EEzgJ
哗跑εi丽简'ed u.肌lil.d
阳制l' "t阳fll:附附
e I隐s
挝时tr阳
l U则刷
T瓦 时t创
c 剧i恼(j)flS 阳t''0 Ow
唰附¥fI斗le , Em伊回仰
i协
0罗归
ees" in the "Pr。叫jeet'、 Gloseout"'
$'e(时
戎tÌ(阳酬
z 即i)f11;侨非 E创
9 Z洲iIi 悻t阶阳#树闸
T陌e:se 叩
sP阴雨l~tiÐAS. fncluØe. bøth ClaSSI'ÐØ:J1ll trainfn~自 and hands-on
equtfi)'rn:e nt 0lPematr0:fI\ aAC!i matotenance飞 prroeedli.lres.
」EZHZDEEDEUZZDUZ
E主 组担重也!垒 tr-aÎ'A.ing w~tn a辈 least seven days' advance f10tification.
豆主口 220
主臣民 DE 出口的空←
EZE
翌日
ZH
〈←ZOUZOEEDLZHEE
王军王军己的白←
rz NO
DR Uv
DRAWING N0
DE-Ð20114
' OOF1
28-0001 4--0002
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 24 13 - SWITCHBOARDS
REZ
ENGG CERT
REZ
PART 1 - GENERAL
MAS
MAS
1.1 GENERAL
A. The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
ISSUED FOR CONSTRUCTION
1.3 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary
NO.
REV
00
DISCIPLINE
to, and shall be correlated with, the requirements of the Contract. Nothing in this
ENGINEER specification section shall limit the scope of work as required by the Contract.
ANP
12/1/16
DATE: 1.4 RELATED WORK
PROJECT
ENGINEER
MAS A. Division 26 Vibration And Seismic Controls for Electrical Systems
12/1/16
DATE:
CERTIFIED B. Division 26 Common Work Results for Electrical: General electrical
REZ
requirements and items that are common to more than one section of Division
12/1/16
DATE: 26.
CONSTRUCTION
AGENCY
AAG C. Division 26 Overcurrent Protective Device Coordination Study: Coordination
DATE:
12/1/16 study of overcurrent protection devices.
OPERATIONS
SMK D. Division 26 Raceway and Boxes for Electrical Systems: Conduits and outlet boxes.
12/1/16
DATE:
E. Division 26 Low-Voltage Electrical Power Conductors and Cables: Cables and wiring.
CONTROL NUMBER
VERIFICATION
EDSD
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.5 SUMMARY
REZ
ENGG CERT
REZ
A. Section Includes:
MAS
6. Identification.
7. Mimic bus.
DESCRIPTION
28-00014
1.7 STANDARDS
00
12/1/16
1.8 SUBMITTALS
DATE:
PROJECT
ENGINEER A. Data: For each type of switchboard, overcurrent protective device, transient
MAS
voltage suppression device, ground-fault protector, accessory, and component
12/1/16
DATE: indicated. Include dimensions and manufacturers' technical data on features,
CERTIFIED
REZ performance, electrical characteristics, ratings, accessories, and finishes.
12/1/16
DATE:
B. Shop Drawings: For each switchboard and related equipment.
CONSTRUCTION
AGENCY 1. Include dimensioned plans, elevations, sections, and details, including
AAG
required clearances and service space around equipment. Show tabulations
12/1/16
DATE: of installed devices, equipment features, and ratings.
OPERATIONS
2. Detail enclosure.
SMK
3. Detail bus configuration, current, and voltage ratings.
12/1/16
DATE: 4. Detail short-circuits current rating of switchboards and overcurrent protective
CONTROL NUMBER
devices.
VERIFICATION
translucent log-log graft paper; include selectable ranges for each type of
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
11. Provide copies of factory test results including prototype tests, IR and
continuity tests.
28-00014
00
3. Results of failed tests and corrective action taken to achieve test results that
DISCIPLINE comply with requirements.
ENGINEER
ANP
DATE:
12/1/16 G. Operation and Maintenance Data: For switchboards and components to
PROJECT include in emergency, operation, and maintenance manuals. In addition to items
ENGINEER
MAS specified in Division 01 include the following:
12/1/16 1. Routine maintenance requirements for switchboards and all installed components.
DATE:
CERTIFIED 2. Manufacturer's written instructions for testing and adjusting overcurrent
REZ
protective devices.
DATE:
12/1/16 3. Time-current coordination curves for each type and rating of overcurrent
CONSTRUCTION
AGENCY
protective device included in switchboards. Submit on translucent log-log
AAG graph paper; include selectable ranges for each type of overcurrent protective
DATE:
12/1/16 device.
OPERATIONS
SMK H. Switchboards shall be fully tested by a recognized independent testing
12/1/16 laboratory per SASO standards. Submit certified test results to Saudi Aramco for
DATE:
revew.
CONTROL NUMBER
VERIFICATION
DATE:
Laboratory (NRTL).
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
28-00014
B. Remove loose packing and flammable materials from inside switchboards and
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
1.11 PROJECT CONDITIONS
ENGINEER
ANP
A. Installation Pathway: Remove and replace access fencing, doors, lift-out
12/1/16
DATE: panels, and structures to provide pathway for moving switchboards into place.
PROJECT
ENGINEER
MAS B. Environmental Limitations:
12/1/16 1. Do not deliver or install switchboards until spaces are enclosed and
DATE:
CERTIFIED
REZ
weathertight, wet work in spaces is complete and dry, work above
switchboards is complete, and temporary HVAC system is operating and
12/1/16
DATE: maintaining ambient temperature and humidity conditions at occupancy
CONSTRUCTION
AGENCY levels during the remainder of the construction period.
AAG
2. Rate equipment for continuous operation under the following conditions
12/1/16
DATE: unless otherwise indicated:
OPERATIONS
a. Ambient Temperature: Not exceeding 50 deg C.
SMK
b. Altitude: Not exceeding 500 m.
12/1/16
DATE: c. Service Conditions:
CONTROL NUMBER
1.12 COORDINATION
DATE:
BY:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
1.13 WARRANTY
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
Contractor to provide the manufacturer’s standard warranty period but shall not
DESCRIPTION
D. During the guarantee period the manufacturer shall make all necessary repairs
or replacement to achieve conformity to the requirements of the Contract
Documents.
JO/EWO
28-00014
28-00014
PART 2 - PRODUCTS
00F1 12/1/16
DATE
10/27/16
00
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
J. Insulation and isolation for main bus of main section and main and vertical
buses of feeder sections.
ISSUED FOR CONSTRUCTION
28-00014
M. Bus Transition and Incoming Pull Sections: Matched and aligned with basic
switchboard.
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
O. Hinged Front Panels: Allow access to circuit breaker, metering, accessory, and
ENGINEER blank compartments.
ANP
12/1/16
DATE: P. Pull Box on Top of Switchboard:
PROJECT
ENGINEER 1. Adequate ventilation to maintain temperature in pull box within same
MAS limits as switchboard.
12/1/16
DATE: 2. Set back from front to clear circuit-breaker removal mechanism.
CERTIFIED
REZ
3. Removable covers shall form top, front, and sides. Top covers at rear shall be
12/1/16
easily removable for drilling and cutting.
DATE:
4. Bottom shall be insulating, fire-resistive material with separate holes for cable
CONSTRUCTION
AGENCY drops into switchboard.
AAG
5. Cable supports shall be arranged to facilitate cabling and adequate to
12/1/16
DATE: support cables indicated, including those for future installation.
OPERATIONS
SMK
Q. Buses and Connections: Three phase, four wire unless otherwise indicated.
12/1/16
DATE:
CONTROL NUMBER
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
conductors.
REZ
ENGG CERT
REZ
4. Main Phase Buses and Equipment Ground Buses: Uniform capacity for
entire length of switchboard's main and distribution sections. Provide for
MAS
MAS
28-00014
DISCIPLINE exceeding the switchboard short-circuit rating, and with the following features
ENGINEER
ANP and accessories:
DATE:
12/1/16 1. Fuses, rated at 100-kA interrupting capacity.
PROJECT 2. Fabrication using bolted compression lugs for internal wiring.
ENGINEER
MAS 3. Integral disconnect switch.
12/1/16 4. Redundant suppression circuits.
DATE:
CERTIFIED 5. Redundant replaceable modules.
REZ
6. Arrangement with wire connections to phase buses, neutral bus, and ground bus.
DATE:
12/1/16 7. LED indicator lights for power and protection status.
CONSTRUCTION 8. Audible alarm, with silencing switch, to indicate when protection has failed.
AGENCY
AAG 9. Form-C contacts rated at 5 A and 250-V ac, one normally open and one
DATE:
12/1/16 normally closed, for remote monitoring of system operation. Contacts shall
OPERATIONS reverse position on failure of any surge diversion module or on opening
SMK of any current-limiting device. Coordinate with building power monitoring and
DATE:
12/1/16 control system.
10. Four digit, transient-event counter set to totalize transient surges.
CONTROL NUMBER
VERIFICATION
EDSD
C. Peak Single-Impulse Surge Current Rating: 160 kA per mode/320 kA per phase.
DATE:
D. Withstand Capabilities: 12,000 IEEE C62.41, Category C3 (10 kA), 8-by-20-mic.sec. surges
BY:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
F. Protection modes for 400V, three-phase, three-wire, delta circuits shall be as follows:
MAS
28-00014
00
2
DISCIPLINE
ENGINEER
5. Current-Limiting Circuit Breakers: Frame sizes 400 A and smaller;
ANP 6. Integrally Fused Circuit Breakers: Thermal-magnetic trip element with
DATE:
12/1/16 integral limiter-style fuse listed for use with circuit breaker; trip activation on
PROJECT
ENGINEER fuse opening or on opening of fuse compartment door.
MAS 7. GFCI Circuit Breakers: Single- and two-pole configurations with Class A
DATE:
12/1/16 ground- fault protection (6-mA trip).
CERTIFIED 8. Ground-Fault Equipment Protection (GFEP) Circuit Breakers: Class B
REZ
ground-fault protection (30-mA trip).
12/1/16
DATE: 9. Molded-Case Circuit-Breaker (MCCB) Features and Accessories:
CONSTRUCTION
AGENCY a. Standard frame sizes, trip ratings, and number of poles.
AAG
b. Lugs: Compression style, suitable for number, size, trip ratings, and
12/1/16
DATE: conductor material.
OPERATIONS c. Application Listing: Appropriate for application; Type SWD for switching
SMK
fluorescent lighting loads; Type HID for feeding fluorescent and high-
12/1/16 intensity discharge (HID) lighting circuits.
DATE:
CONTROL NUMBER
ground-fault indicator.
e. Communication Capability: Din-rail-mounted communication module with
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
2.4 INSTRUMENTATION
DESCRIPTION
28-00014
00
DATE:
12/1/16 2.5 CONTROL POWER
CERTIFIED
REZ
A. Control Circuits: 231-V ac, supplied through secondary disconnecting devices
DATE:
12/1/16 from control-power transformer.
CONSTRUCTION
AGENCY
AAG B. Electrically Interlocked Main and Tie Circuit Breakers: Two control-power transformers in
12/1/16 separate compartments, with interlocking relays, connected to the primary side of each
DATE:
OPERATIONS
control-power transformer at the line side of the associated main circuit breaker. 230-V
SMK
secondaries connected through automatic transfer relays to ensure a fail-safe automatic
transfer scheme.
12/1/16
DATE:
CONTROL NUMBER
D. Control Wiring: Factory installed, with bundling, lacing, and protection included. Provide flexible
DATE:
BY:
conductors for 4 mm sq. and smaller, for conductors across hinges, and for conductors for
interconnections between shipping units.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
A. Accessory Set: Include tools and miscellaneous items required for overcurrent
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
protective device test, inspection, maintenance, and operation – Two (2) sets
REZ
ENGG CERT
REZ
B. Portable Test Set: For testing functions of solid-state trip devices without
MAS
removing from switchboard. Include relay and meter test plugs suitable for
testing switchboard meters and switchboard class relays – Two (2) sets for the
project.
ISSUED FOR CONSTRUCTION
2.7 IDENTIFICATION
28-00014
00
DISCIPLINE
ENGINEER
ANP
PART 3 - EXECUTION
12/1/16
DATE:
PROJECT
3.1 EXAMINATION
ENGINEER
MAS
A. Receive, inspect, handle, and store switchboards according to the applicable
12/1/16
DATE: SASO and IEC applicable reference standard.
CERTIFIED
REZ
B. Examine switchboards before installation. Reject switchboards that are
12/1/16
DATE: moisture damaged or physically damaged.
CONSTRUCTION
AGENCY
AAG
C. Examine elements and surfaces to receive switchboards for compliance with
12/1/16
DATE: installation tolerances and other conditions affecting performance of the Work.
OPERATIONS
SMK D. Proceed with installation only after unsatisfactory conditions have been corrected.
12/1/16
DATE:
3.2 INSTALLATION
CONTROL NUMBER
VERIFICATION
EDSD
otherwise indicated, install dowel rods on 450-mm centers around the full
perimeter of concrete base.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
components.
28-00014
3.3 CONNECTIONS
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
A. Comply with requirements for terminating feeder bus specified in Division 26
12/1/16
Enclosed Bus Assemblies. Drawings indicate general arrangement of bus,
DATE:
PROJECT
fittings, and specialties.
ENGINEER
MAS
B. Comply with requirements for terminating cable trays specified in Division 26
12/1/16
DATE: Cable Trays for Electrical Systems. Drawings indicate general arrangement
CERTIFIED
REZ of cable trays, fittings, and specialties.
12/1/16
DATE:
CONSTRUCTION
3.4 IDENTIFICATION
AGENCY
AAG
A. Identify field-installed conductors, interconnecting wiring, and components;
12/1/16
DATE: provide warning signs complying with requirements for identification specified
OPERATIONS
in Division 26 Identification for Electrical Systems.
SMK
DATE:
12/1/16 B. Switchboard Nameplates: Label each switchboard compartment with a
nameplate complying with requirements for identification specified in Division 26
CONTROL NUMBER
VERIFICATION
C. Device Nameplates: Label each disconnecting and overcurrent protective device and
DATE:
BY:
each meter and control device mounted in compartment doors with a nameplate complying
with requirements for identification specified in Division 26 Identification for Electrical Systems.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
28-00014
00
DATE:
12/1/16 F. Switchboard will be considered defective if it does not pass tests and inspections.
CONSTRUCTION
AGENCY
AAG G. Prepare test and inspection reports, including a certified report that identifies
12/1/16 switchboards included and that describes scanning results. Include notation of
DATE:
OPERATIONS deficiencies detected, remedial action taken, and observations after remedial
SMK action.
12/1/16
DATE:
3.6 ADJUSTING
CONTROL NUMBER
VERIFICATION
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
3.7 PROTECTION
REZ
ENGG CERT
REZ
A. Separate and dispose of waste in accordance with the Project’s Waste Management
Plan.
DESCRIPTION
END OF SECTION 26 24 13
JO/EWO
28-00014
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 24 16 - PANEL BOARDS
REZ
ENGG CERT
REZ
PART 1 – GENERAL
MAS
MAS
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
Construction of the facility.
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary to,
00F1 12/1/16
DATE
10/27/16
and shall be correlated with, the requirements of the Contract. Nothing in this
specification section shall limit the scope of work as required by the Contract.
NO.
REV
00
DISCIPLINE
ENGINEER
ANP 1.3 DESCRIPTION OF WORK
12/1/16
DATE:
PROJECT
ENGINEER
A. This Section includes lighting and power circuit breaker type panelboards and
MAS associated auxiliary equipment rated 600V or less.
12/1/16
DATE:
CERTIFIED 1.4 QUALITY ASSURANCE
REZ
12/1/16
DATE: A. Applicable Codes and Standards: Conform to the Codes and Standards listed, but
CONSTRUCTION
AGENCY not limited to:
AAG
12/1/16
DATE: 1. Provide products that are listed and labeled by UL, NEMA, or other
OPERATIONS internationally recognized testing laboratory.
SMK
DATE:
12/1/16 2. Electrical Component Standard: Components and installation which shall
comply with SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70
CONTROL NUMBER
VERIFICATION
"National Electrical Code," with the SBC 401 requirements prevailing over
EDSD
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
gzEDELD
S 6J BMITTA 七S
←z出 ZDUZωE 罢
A: 豆豆旦旦旦!: Submit tMe folløWfflg} in aeoordanoe with Conditions of Contract and
Division; 1. S [i)e Gi flcatiøn SecHoA's.
1. Proouct( dat毡. fQ I' eac h' t!1Jlle P翻刨boa时, accesso叩 item , and component
ωEEDE3
,
s~ecjfieØi.
ZOF03区←田ZCO 篮。比。因3崎啤
←zωESD口的HEEDEBZ 声 EE 国 44
plalils, s~tì.侧&,. aflø etev.atj(!);fJls, Show\ tabulation S'‘ of installed deviees ,
m a:j,0f 但at'lll f8S, amØ \1i~ltage 阳4柄1!iJ) l M.cluàe飞 the' fbllowing:
abed
[lllel'~ lìJfe ~pe with d'etaHs fôp ty;p, es other than NEMA Type 1.
IÐus e:ÐI1l,f.fg,Ufa'扳倒耳 anø e'urflent\ ratings.
Snl\)'fib.. circuft c lU.r rent rating,吧 。李 panelboard .
Ir eatlllres;, eh百!l.F8cteristies, ratiHgs, and factory settings of individual
~rotective deviees and auxilia 叩 eomponents .
主的是
3 JL Q1Jallfieéi政íi{lltl e1ai'国 fOfi ffeld~testiRg org~nization
certificates , signed by the
叶F
42-gJJEZHZ0522228 王军
00;时ra.dCfl,. eeJtißti;r:'I Q t.na'也 theωgan区创ìon' complies with the requiremerlts
飞口口口EH
wi~ÞY 1'11'0庐et FfgmeS, 8í制:resses ,ι and; names or Architect and Owner plus
basi:c; Qfg邵阳atKlm q.ualifie前 iøns aata
4. Re~ (i)f fie! (ij1 te.s ts an Cit øbserv,捕。ns cert1fied by the testing organization
52aLDE
"BasFC: IEIe:e::triea中Rieq.wirerner可t5, " Include instructions for testing circuit
,
break:e s.
国旦。庄出口的
11 6~ EXTRA'、 MATERIA IL S
A. 旦旦主; Fumish si说 spafes of each type för panelboard cabinet locks.
EE
定 ZE 空白
B. Touch-u o, Pail1lt . fQ17 sl坏fcl即社!1T:l@1JJiI始d ø.aß e1 bo8 r;ds: Ofle hal在 pint container.
2,:0/1';主 MANUFACl'URERS
s.:
〈 UEEE
Manûfactw re r~: $uÐjeci toωrn Jilfiooce with requirements , provide products by the
following r:ecømmended' m创l:.Jfa~t:UFe陪:
口的自←
R V NO
E』
DRAWING NO.
r
DE-D20114'
OOF1
28-00014-0002
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
28-00014
C. Front: Secured to box with concealed trim clamps except as indicated. Front for
00F1 12/1/16
DATE
10/27/16
surface-mounted panels shall be same dimensions as box. Fronts for flush panels
shall overlap box except as otherwise specified.
NO.
REV
00
DISCIPLINE
ENGINEER D. Directory Frame: Metal, mounted inside each panel door.
ANP
12/1/16
DATE: E. Bus: Hard drawn copper of 98 percent conductivity.
PROJECT
ENGINEER
MAS
F. Main and Neutral Lugs: Compression type.
12/1/16
DATE:
CERTIFIED
REZ G. Equipment Ground Bus: Adequate for feeder and branch-circuit equipment ground
12/1/16
conductors. Bonded to box.
DATE:
CONSTRUCTION
AGENCY
AAG
H. Service Equipment Approval: Listed for use as service equipment for panelboards
having main service disconnect.
12/1/16
DATE:
OPERATIONS
I. Provision for Future Devices: Equip with mounting brackets, bus connections, and
SMK
necessary appurtenances, for the OCPD ampere ratings indicated for future
12/1/16
DATE: installation of devices.
CONTROL NUMBER
VERIFICATION
DATE:
2. Hinged Front Cover: Entire front trim hinged to box with standard door
(DCC) NO. _____________________
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
3. Skirt For Surface-Mounted Panels: Same gage and finish as panel front
REZ
ENGG CERT
REZ
way to overhead junction box equipped with ground and neutral terminal
buses.
DESCRIPTION
A. Doors: In panel front, with concealed hinges. Secure with flush catch and tumbler
lock, all keyed alike.
JO/EWO
28-00014
28-00014
A. Doors: In panel front, omit single panelboard door in cabinet front for fusible switch
panelboards except as indicated. Secure with vault-type with tumbler lock, all keyed
alike.
NO.
REV
00
DISCIPLINE
ENGINEER B. Branch-Circuit Breakers: Where OCPDs are indicated to be circuit breakers, use bolt-
ANP
on breakers except circuit breakers 225-ampere frame size and greater may be plug-in
12/1/16
DATE:
type where individual positive locking device requires mechanical release for removal.
PROJECT
ENGINEER
MAS
2.05 IDENTIFICATION
12/1/16
DATE:
CERTIFIED
REZ A. General: Refer to Division 16 Section "Electrical Identification" for labeling
12/1/16
materials.
DATE:
CONSTRUCTION
AGENCY
AAG
B. Panelboard Nameplates: Engraved laminated plastic or metal nameplate for each
12/1/16
panelboard mounted with epoxy or industrial cement or industrial adhesive.
DATE:
OPERATIONS
SMK
PART 3 - EXECUTION
12/1/16
DATE: 3.01 INSTALLATION
CONTROL NUMBER
VERIFICATION
instructions.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
with installation guidelines of SBC 401 and BS 7671, " Requirements for Electrical
Installations. IET Wiring Regulations "
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
C. Mounting Heights: Top of trim 6'-2" above finished floor, except as indicated.
REZ
ENGG CERT
REZ
D. Mounting: Plumb and rigid without distortion of box. Mount flush panels uniformly
MAS
MAS
E. Circuit Directory: Typed and reflective of final circuit changes required to balance
panel loads. Obtain approval before installing.
ISSUED FOR CONSTRUCTION
G. Provision for Future Circuits at Flush Panelboards: Stub four 1- inch empty
conduits from panel into accessible ceiling space or space designated to be ceiling
space in future. Stub four 1-inch empty conduits into raised floor space or below
slab other than slabs on grade.
I. Wiring in Panel Gutters: Train conductors neatly in groups, bundle, and wrap with
wire ties after completion of load balancing.
JO/EWO
28-00014
28-00014
3.02 IDENTIFICATION
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
ENGINEER 3.03 GROUNDING
ANP
12/1/16
DATE:
PROJECT
A. Connections: Make equipment grounding connections for panelboards as
ENGINEER indicated.
MAS
12/1/16
DATE: B. Provide ground continuity to main electrical ground bus indicated.
CERTIFIED
REZ
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
D. Procedures: Make field tests and inspections and prepare panelboard for
ISSUED FOR CONSTRUCTION
28-00014
00
DISCIPLINE
Where discrepancies are found, recommend final protective device ratings
ENGINEER and settings. Use accepted ratings or settings to make the final system
ANP
12/1/16
adjustments.
DATE:
PROJECT
ENGINEER E. Visual and Mechanical Inspection: Include the following inspections and related
MAS
work:
12/1/16
DATE:
CERTIFIED
REZ 1. Inspect for defects and physical damage, labeling, and nameplate
12/1/16
compliance with requirements of up-to-date drawings and panelboard
DATE:
CONSTRUCTION
schedules.
AGENCY
AAG
12/1/16
2. Exercise and perform of operational tests of all mechanical components
DATE:
and other operable devices in accordance with manufacturer's instruction
OPERATIONS
SMK
manual.
12/1/16
DATE: 3. Check panelboard mounting, area clearances, and alignment and fit of
CONTROL NUMBER
components.
VERIFICATION
EDSD
5. Perform visual and mechanical inspection and related work for over current
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
Protective Devices."
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
manufacturer's instruction:
MAS
MAS
3. Test main and subfeed over current protective devices in accordance with
DESCRIPTION
3.06 CLEANING
28-00014
3.07 COMMISSIONING
A. Balancing Loads: After Substantial Completion, but not more than two months
NO.
REV
00
DISCIPLINE
after Final Acceptance, conduct load-balancing measurements and circuit changes
ENGINEER as follows:
ANP
12/1/16
DATE:
PROJECT
1. Perform measurements during period of normal working load as advised by
ENGINEER the SAUDI ARAMCO Representative.
MAS
12/1/16
DATE: 2. Perform load-balancing circuit changes outside the normal
CERTIFIED
REZ occupancy/working schedule of the facility. Make special arrangements
12/1/16 with SAUDI ARAMCO Representative to avoid disrupting critical 24-hour
DATE:
CONSTRUCTION
services such as FAX machines and on-line data processing, computing,
AGENCY
AAG
transmitting, and receiving equipment.
12/1/16
DATE:
OPERATIONS
3. Recheck loads after circuit changes during normal load period. Record all
SMK
load readings before and after changes and submit test records.
12/1/16
DATE:
4. Tolerance: Difference between phase loads exceeding 20 percent at any
CONTROL NUMBER
VERIFICATION
DATE:
BY:
END OF SECTION 26 24 16
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 27 13 - ELECTRICITY METERING
REZ
ENGG CERT
REZ
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2. SUMMARY
28-00014
specification section shall limit the scope of work as required by the Contract.
00
DISCIPLINE
ENGINEER
ANP B. Section covers requirements for the Saudi Electric Company (SEC) meters.
12/1/16
DATE:
PROJECT 1.3 DESCRIPTION
ENGINEER
MAS
12/1/16 1.3.1 Drawings and general provisions of the Contract, including General and
DATE:
CERTIFIED Supplementary Conditions and Division 01 Specification Sections, apply to
REZ
this Section.
12/1/16
DATE:
CONSTRUCTION
AGENCY
1.4 RELATED WORK
AAG
DATE:
12/1/16 1.4.1 Division 26 Common Work Results for Electrical: General electrical
OPERATIONS requirements and items that is common to more than one section of Division
SMK 26.
12/1/16
DATE:
1.4.2 Provide 50mm HDPE conduit from SEC meter to respective substation for
CONTROL NUMBER
VERIFICATION
fiber optic cable. Provide (2) drag lines in conduit. Provide all excavation and
EDSD
backfill as required. Coordinate work with the site infrastructure team. HDPE
conduit shall be as per SEC standards.
DATE:
BY:
1.5 SUBMITTALS
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B. Shop Drawings:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
D. Manuals: Four weeks prior to the final inspection, submit four copies of the
following to Saudi Aramco:
1. Complete maintenance, operating and testing manuals including wiring
diagrams, technical data sheets and information for ordering replacement
parts.
2. Application and operating software documentation.
3. Software licenses.
4. Software service agreement.
JO/EWO
28-00014
28-00014
E. Certifications: Two weeks prior to final inspection, submit four copies of the
NO.
REV
00
DATE:
12/1/16 1.6.1 Saudi Arabian Standards Organization (SASO)
CONSTRUCTION 1.6.2 Saudi Electrical Company (SEC) – For SEC meters
AGENCY
AAG 1.6.2.1 SDCS Construction Standard for the Underground Network
DATE:
12/1/16 1.6.2.2 40-SDMS-02A and 02B – Specifications forKilo-Watthour Meter
OPERATIONS 1.6.2.3 42-SDMS-01 – Specifications for Fiber Glass Reinforced Polyester Meter Boxes.
SMK
1.7.1 Manufacturers: Firms regularly engaged in manufacture of electric meters of types, sizes
and ratings required, whose projects have been in satisfactory use in similar service for
EDSD
not less than 10 years and approved by SEC. Preference shall be given to local
manufacturers and agents/suppliers.
DATE:
BY:
B. Installer: Firms regularly engaged and qualified with at least 5 years of successful
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.8 WARRANTY
REZ
ENGG CERT
REZ
1.8.2 Refer to Saudi Aramco contract for minimum required warranty after
handover. Contractor to provide the manufacturer’s standard warranty period
but shall not be less than the duration stipulated in contract.
ISSUED FOR CONSTRUCTION
1.8.4 During the guarantee period the manufacturer shall make all necessary
repairs or replacement to achieve conformity to the requirements of the
Contract Documents.
PART 2 - PRODUCTS
28-00014
A. SEC METERS
1. SEC meters shall be approved by SEC. Installation of meters shall follow
00F1 12/1/16
DATE
10/27/16
SEC standards.
2. SEC meters shall be smart meter type and shall have termination to accept
fiber optic cable for remote data monitoring of energy meter.
NO.
REV
00
DISCIPLINE
ENGINEER B. MANUFACTURERS: Subject to full compliance with requirements and SEC
ANP
12/1/16
approval, manufacturers offering product that may be incorporated into work
DATE:
PROJECT
include but are not limited to the following:
ENGINEER 1. MEMF
MAS
2. Saudi Swiss Co.
12/1/16
DATE: 3. Holley
CERTIFIED
REZ 4. AEM
12/1/16 5. Arabian Meter Factory
DATE:
CONSTRUCTION
6. Landis & Cyr Hellas
AGENCY
AAG
12/1/16
PART 3 - EXECUTION
DATE:
OPERATIONS
3.1 INSTALLATION
SMK
12/1/16
DATE: A. Install meters furnished by utility company. Install raceways and equipment
CONTROL NUMBER
3.2 IDENTIFICATION
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
3. Run test load continuously for one hour minimum, or longer, to obtain a
measurable meter indication. Use test-load placement and setting that
ensures continuous, safe operation.
4. Check and record meter reading at end of test period and compare with
actual electricity used, based on test-load rating, duration of test, and sample
measurements of supply voltage at test-load connection. Record test results.
C. Electricity metering will be considered defective if it does not pass tests and
inspections.
JO/EWO
28-00014
28-00014
END OF SECTION 26 27 13
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 27 26 - WIRING DEVICES
REZ
ENGG CERT
REZ
PART 1 – GENERAL
MAS
MAS
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
Construction of the facility.
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary
00F1 12/1/16
DATE
10/27/16
to, and shall be correlated with, the requirements of the Contract. Nothing in this
specification section shall limit the scope of work as required by the Contract.
NO.
REV
00
DISCIPLINE
ENGINEER
B. This section includes the followings:
ANP
12/1/16
DATE: Outlet boxes and plates.
PROJECT
ENGINEER Lighting switches.
MAS Socket outles.
12/1/16 Dimmer panel.
DATE:
CERTIFIED
REZ
Time controlled switches.
Lighting contactors.
12/1/16
DATE: Photoelectric cells.
CONSTRUCTION
AGENCY Pushbutton.
AAG
12/1/16
DATE: 1.3 RELATED DOCUMENTS
OPERATIONS
SMK
C. Drawings and general provisions of the Contract, including General and
DATE:
12/1/16 Supplementary Conditions and Division 01 Specification Sections, apply to this
Section.
CONTROL NUMBER
VERIFICATION
EDSD
A. All devices and equipment shall comply with local and applicable Wiring
Regulations. Where conflicts arise, Saudi Aramco's Representative shall be
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.5 STANDARD
REZ
ENGG CERT
REZ
A. All devices shall be listed and approved by the applicable SASO standard
MAS
MAS
A. Product Data: Manufacturer's data on each electrical wiring device specified for
approval by Saudi Aramco.
ISSUED FOR CONSTRUCTION
28-00014
00
C. Standards Compliance: provide wiring devices, which are listed and comply with
DISCIPLINE
ENGINEER applicable standards for various applications indicated in specification.
ANP
12/1/16
DATE: 1.9 SEQUENCE AND SCHEDULING
PROJECT
ENGINEER
MAS A. Schedule installation of finish plates after surface upon which they shall be
DATE:
12/1/16 installed has received final finish.
CERTIFIED
REZ
1.10 WARRANTY
12/1/16
DATE:
CONSTRUCTION
AGENCY
A. Unless otherwise stated in this specification section all materials, assemblies,
AAG components parts and workmanship shall be guaranteed against defect,
DATE:
12/1/16 damage, or non- conformity for a period of one (1) year.
OPERATIONS
SMK B. During the guarantee period the manufacturer shall make all necessary repairs
DATE:
12/1/16 or replacement to achieve conformity to the requirements of the Contract
Documents.
CONTROL NUMBER
VERIFICATION
EDSD
PART 2 - PRODUCTS
DATE:
BY:
2.1 MANUFACTURERS
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
4. LeGrand
5. Schneider electrical Al-Khobar
B. Wiring shall be carried out in strict accordance with cable sizes and circuit details
JO/EWO
28-00014
28-00014
provided in load schedules and on drawings. All wiring on multi-point sub circuits
shall be carried out as a “loop-in” system and no joints at any point in cable runs
shall be allowed.
00F1 12/1/16
DATE
10/27/16
C. Single phase circuits taken from TP and N Distribution Boards shall have their
NO.
REV
00
C. Switches shall be installed in boxes with adjustable lugs to ensure front plate is
true and square. Flush boxes shall be flush with finished wall surface and
DATE:
BY:
overlapping front plated shall be used. Boxes shall be suitable for wiring system
used.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
F. Switches shall be suitable for back and side wiring with 4.0 mm2 or 2 x 2.5 mm2
stranded conductors.
ISSUED FOR CONSTRUCTION
A. Socket outlets shall comply to the applicable SASO and IEC reference standard,
DESCRIPTION
B. Plugs tops shall be fitted with correct rated fuse for appliance to which it is connected.
C. Socket outlets shall be complete with boxes not less than 35mm deep and box
shall have a suitable mounted, brass, protective conductor terminal.
D. Socket outlets installed in flush installations shall have overlapping front plates.
JO/EWO
28-00014
28-00014
E. In surface installations front plates shall be flush with sides of box and shall be
metal clad unless otherwise specified.
00F1 12/1/16
DATE
10/27/16
F. Earth pin of socket outlets shall be connected to box earth terminal with a green
and yellow PVC-insulated protective conductor. Cover screws are not acceptable
NO.
REV
00
DISCIPLINE
for earth continuity.
ENGINEER
ANP
G. Indicating pattern socket outlets shall be used for appliances containing a
12/1/16
DATE: heating element and like.
PROJECT
ENGINEER
MAS H. Socket outlet shall be suitable for back and side-wiring 1 x 6mm2 0r 2 x 4.0mm2
12/1/16
DATE: stranded conductors.
CERTIFIED
REZ
12/1/16
DATE: 2.5 FUSED CONNECTION UNITS
CONSTRUCTION
AGENCY
AAG A. Fused connection units shall be per applicable SASO and IEC reference
DATE:
12/1/16 standard, double-pole, insulated pattern, switched with neon Indicator as
OPERATIONS specified, with face plates to match socket outlets.
SMK
DATE:
12/1/16 B. Where used as a flexible outlet to an appliance, fused connection units shall be
of flexible outlet pattern with cable anchoring clamp. Fuses shall be provided with
CONTROL NUMBER
VERIFICATION
A. Socket outlets and switch cover plate finishes shall be as specified above.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B. Samples of all cover plated shall be provided to Saudi Aramco for approval prior
(DCC) NO. _____________________
28-00014-0002-0001
to ordering.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
A. Sockets shall comply with applicable SASO and IEC reference standard and
MAS
C. All single-phase sockets shall be 230-250 volts and all three-phase sockets shall
be 400- 415 volts.
DESCRIPTION
E. Sockets shall be complete with surface back base and shall be angled at
approximately 45 degree.
G. Sockets in the classrooms and public spaces shall have integral childproof
shutter feature.
JO/EWO
28-00014
28-00014
2.8 PLUGS
A. Type: compatible with type of socket outlet specified, break resistant, of impact
00F1 12/1/16
DATE
10/27/16
00
12/1/16
DATE: 2.9 TIME CONTROLLED SWITCHES
OPERATIONS
SMK A. Time Controlled Switches: provide electrically operated time controlled switches
DATE:
12/1/16 with 24-hour dials capable of periodically and automatically switching indoor and
outdoor lamps both ON and OFF selectively.
CONTROL NUMBER
VERIFICATION
EDSD
B. Select switches, which permit selection of from 1 to 12 ON- OFF operations each
day and allow timing durations of 1 to 23 hours; with ratings (231V) (50 Hz) and
DATE:
BY:
C. Provide indoor/outdoor mount steel enclosure, have suitable protection, with side
OF THIS DRAWING IS COVERED, FOR ALL
D. Provide timing switch with manual circuit by-pass switch and separate grounding
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
terminal.
REZ
ENGG CERT
REZ
Saudi Aramco.
MAS
A. Type: double pole for single phase and neutral circuits, and triple pole for three
phase circuits, mechanically held, electrically operated, rated 600 V, of current
DESCRIPTION
ratings shown on Drawings, and complying with IEC 60947-4 category AC 5a for
discharge lamps and category AC 5b for incandescent lamps.
B. Contacts: copper alloy, with silver cadmium alloy double break contacts designed
for switching inductive ballast loads and switching of tungsten lamp loads.
28-00014
D. Enclosure: unless forming part of system housed in sheet steel panel, contactor
is shall be provided with IP 42 enclosure for indoor use or IP 65 enclosure for
00F1 12/1/16
DATE
10/27/16
outdoor use.
00
DISCIPLINE
to have on/off pilot lights and set of on/off push buttons mounted on cover.
ENGINEER
ANP
F. Central Control: provide interfacing elements to match with control system, BMS
12/1/16
DATE: system, and remote control wiring terminals as necessary and as shown on Drawings.
PROJECT
ENGINEER
MAS
12/1/16
DATE: 2.11 PHOTOELECTRIC CELLS
CERTIFIED
REZ
A. Omnidirectional cadmium sulphide, hermetically sealed, with 2:1 on/off
12/1/16
DATE: adjustment possible by moving light level selector, set to operate at luminance
CONSTRUCTION
AGENCY levels shown on Drawings. Unit is to include timer giving 3-minute delay to
AAG
prevent false switching. Unit must be capable of accurate operation in a
12/1/16
DATE: temperature range of - 10 deg. C to +80 deg.
OPERATIONS
SMK B. Safety: Control shall be designed such that in case of failure, unit fails in on position.
12/1/16
DATE:
C. Contacts shall close or open as illumination level increases to set level with
CONTROL NUMBER
VERIFICATION
D. Outdoor Sealed Units: heavy duty cast metal, with translucent dome of
DATE:
polycarbonate or other equal and approved product, to protect against high ultra
BY:
violet rays, and be provided with 180 deg. swivel base and 16 mm threaded
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
2.12 PUSHBUTTON
REZ
ENGG CERT
REZ
A. Pushbutton shall match other wiring devices. The color and finishing shall subject
MAS
PART 3 - EXECUTION
B. Coordinate with other Work, including painting, electrical boxes and wiring
installations, as necessary to interface installation of wiring devices with other
Work.
C. Install wiring devices only in electrical boxes, which are clean; free from building
materials, dirt, and debris.
JO/EWO
28-00014
28-00014
D. Install surface mounted devices with metal clad wall plates with a corrosion and
scratch resistant metallic powder coated paint finish in unfinished spaces.
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE Electrical Design Drawings: generally show approximate locations of outlets and
ENGINEER
ANP
equipment. Exact locations shall be determined from interior finishing and detail
12/1/16 drawings. Any condition that would place an outlet in an unsuitable location shall
DATE:
PROJECT
be referred to Saudi Aramco.
ENGINEER
MAS
F. Unless otherwise shown or instructed, mount lighting switches and socket outlets
12/1/16
DATE: generally at 1250 mm and 450 mm from finished floor level respectively. Mount
CERTIFIED
REZ switches with long dimension vertical and operating handle, if of toggle type, up
12/1/16 when switch is in on position.
DATE:
CONSTRUCTION
AGENCY
AAG
G. Connect switches in phase wire. Do not run neutral wire through switch boxes.
12/1/16
DATE: H. Provide additional outlets to those shown on Drawings as required by equipment
OPERATIONS
manufacturers for control or other wiring.
SMK
12/1/16 I. Securely Exposed Outlet Boxes: securely fasten to wall with machine screws to
DATE:
CONTROL NUMBER
J. Provide neat openings for recessed boxes, allowing for thickness of finishing,
and use extension rings if required. Repair damaged finishing to original
DATE:
BY:
K. Install exposed boxes and plate’s plumb, square and parallel to finished wall
OF THIS DRAWING IS COVERED, FOR ALL
surface. Exposed plates covering recessed boxes shall rest neatly on wall
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
N. Install single throw switches with lever in “UP” position when switch is closed.
O. Connection of Appliances:
DESCRIPTION
28-00014
R. Tighten connectors and terminals, including screws and bolts, in accordance with
00F1 12/1/16
DATE
10/27/16
S. Samples of all accessories shall be provided for approval by Saudi Aramco prior
NO.
REV
00
DISCIPLINE
to ordering.
ENGINEER
ANP
3.2 PROTECTION
12/1/16
DATE:
PROJECT
ENGINEER A. Protect installed components from damage. Replace damaged items prior to final
MAS acceptance.
12/1/16
DATE:
CERTIFIED 3.3 FIELD QUALITY CONTROL
REZ
12/1/16 A. Carry out visual inspection of fittings and equipment for fixing and workmanship.
DATE:
CONSTRUCTION
AGENCY
AAG B. Testing: prior to energizing circuits, test wiring for electrical continuity, and for
DATE:
12/1/16 short- circuits. Ensure proper polarity of connections is maintained. Subsequent
OPERATIONS to energizing, test wiring devices and demonstrate compliance with
SMK requirements, operating each operable device.
12/1/16
DATE:
C. Test ground fault interrupter operation with both local and remote fault
CONTROL NUMBER
VERIFICATION
DATE:
END OF SECTION 26 27 26
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP B. Section includes :
12/1/16
DATE:
PROJECT
ENGINEER
1. Fusible switches.
MAS 2. Nonfusible switches.
DATE:
12/1/16 3. Receptacle switches.
CERTIFIED 4. Shunt trip switches.
REZ
5. Molded-case circuit breakers (MCCBs).
12/1/16 6. Enclosures.
DATE:
CONSTRUCTION
AGENCY
AAG 1.3 RELATED DOCUMENTS
12/1/16
DATE:
OPERATIONS 1.3.1 Drawings and general provisions of the Contract, including General and
SMK Supplementary Conditions and other Division 01 Specification Sections,
12/1/16 apply to this Section.
DATE:
CONTROL NUMBER
VERIFICATION
26.
DATE:
BY:
1.3.3 Division 26 05 33 Raceway And Boxes For Electrical Systems: Conduits for
APPROVAL/CERTIFICATION REQUIREMENTS,
and wiring.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
Requirements for personnel safety and to provide a low impedance path for
possible ground faults.
1.4 DEFINITIONS
DESCRIPTION
Seismic Performance: Enclosed switches and circuit breakers shall withstand the
JO/EWO
28-00014
28-00014
and the unit will be fully operational after the seismic event."
NO.
REV
00
1.6 SUBMITTALS
DISCIPLINE
ENGINEER
ANP 1.6.1 Product Data: For each type of enclosed switch, circuit breaker, accessory,
DATE:
12/1/16 and component indicated. Include dimensioned elevations, sections,
PROJECT
ENGINEER
weights, and manufacturers' technical data on features, performance,
MAS electrical characteristics, ratings, accessories, and finishes.
DATE:
12/1/16 1.6.1.1 Enclosure types and details for types other than IP 55.
CERTIFIED 1.6.1.2 Current and voltage ratings.
REZ
1.6.1.3 Short-circuit current ratings (interrupting and withstand, as appropriate).
12/1/16
DATE: 1.6.1.4 Include evidence of NRTL listing for series rating of installed devices.
CONSTRUCTION
AGENCY 1.6.1.5 Detail features, characteristics, ratings, and factory settings of individual
AAG
overcurrent protective devices, accessories, and auxiliary components.
12/1/16 1.6.1.6 Include time-current coordination curves (average melt) for each type and
DATE:
OPERATIONS rating of overcurrent protective device; include selectable ranges for each
SMK
type of overcurrent protective device.
12/1/16
DATE:
1.6.2 Shop Drawings: For enclosed switches and circuit breakers. Include
CONTROL NUMBER
VERIFICATION
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
28-00014
1.7 REFERENCES
NO.
REV
DISCIPLINE
ENGINEER
ANP B. International Electrotechnical Commission (IEC)
12/1/16 1. IEC 60364 – Low Voltage Electrical Installations
DATE:
PROJECT 2. IEC 60439 – Standards for Low Voltage Panelboards
ENGINEER
MAS
3. IEC 61009 – Residual Current Operated Circuit Breakers
12/1/16
DATE:
CERTIFIED
1.8 QUALITY ASSURANCE
REZ
12/1/16
DATE: C. All disconnect switches shall be UL-listed and comply with SASO, NEC and
CONTROL NUMBER
disconnect switches.
EDSD
E. Source Limitations: For each building obtain enclosed switches and circuit breakers,
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
enclosures, and adjacent surfaces and other items. Comply with indicated
maximum dimensions.
qualified testing agency, and marked for intended location and application.
1.10 COORDINATION
28-00014
A. Furnish extra materials that match products installed and that are packaged with
protective covering for storage and identified with labels describing contents.
00F1 12/1/16
DATE
10/27/16
1. Fuses: Equal to ten (10) percent of quantity installed for each size and type,
but no fewer than three (3) of each size and type.
2. Fuse Pullers: Two (2) for each size and type.
NO.
REV
00
DISCIPLINE
ENGINEER 1.12 WARRANTY
ANP
12/1/16
DATE: A. Refer to Division 01 Warranty.
PROJECT
ENGINEER
MAS B. Refer to Saudi Aramco contract for minimum required warranty after handover.
12/1/16 Contractor to provide the manufacturer’s standard warranty period but shall not
DATE:
CERTIFIED
REZ
be less than the duration stipulated in contract.
12/1/16
DATE: C. Unless otherwise stated in this specification section all materials, assemblies,
CONSTRUCTION
AGENCY components parts and workmanship shall be guaranteed against defect,
AAG
damage, or non- conformity.
12/1/16
DATE:
OPERATIONS D. During the guarantee period the manufacturer shall make all necessary repairs or
SMK replacement to achieve conformity to the requirements of the Contract
DATE:
12/1/16 Documents.
CONTROL NUMBER
VERIFICATION
PART 2 - PRODUCTS
EDSD
manufacturers offering product that may be incorporated into work include but
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. Heavy Duty, Single Throw, 400-V ac, 1200 A and Smaller: Horsepower rated,
ISSUED FOR CONSTRUCTION
closed position.
C. Heavy Duty, Six Pole, Single Throw, 400-V ac, 200 A and Smaller: Horsepower
rated, with clips or bolt pads to accommodate specified or indicated fuses,
lockable handle with capability to accept three padlocks, and interlocked with
cover in closed position.
D. Heavy Duty, Double Throw, 400-V ac, 1200 A and Smaller: Horsepower rated,
with clips or bolt pads to accommodate specified or indicated fuses, lockable
handle with capability to accept three padlocks, and interlocked with cover in
JO/EWO
28-00014
28-00014
closed position.
E. Accessories:
00F1 12/1/16
DATE
10/27/16
1. Equipment Ground Kit: Internally mounted and labeled for copper and
aluminum ground conductors.
NO.
REV
00
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
B. Heavy Duty, Single Throw, 400-V ac, 1200 A and Smaller: Horsepower rated,
REZ
ENGG CERT
REZ
lockable handle with capability to accept three padlocks, and interlocked with
cover in closed position.
MAS
MAS
C. Heavy Duty, Six Pole, Single Throw, 400-V ac, 200 A and Smaller: Horsepower
rated, lockable handle with capability to accept three padlocks, and interlocked
with cover in closed position.
ISSUED FOR CONSTRUCTION
D. Heavy Duty, Double Throw, 400-V ac, 1200 A and Smaller: Horsepower rated,
lockable handle with capability to accept three padlocks, and interlocked with
cover in closed position.
DESCRIPTION
E. Accessories:
1. Equipment Ground Kit: Internally mounted and labeled for copper and
aluminum ground conductors.
2. Neutral Kit: Internally mounted; insulated, capable of being grounded and
bonded; labeled for copper and aluminum neutral conductors.
3. Isolated Ground Kit: Internally mounted; insulated, capable of being
grounded and bonded; labeled for copper and aluminum neutral conductors.
4. Auxiliary Contact Kit: Two Form "C" auxiliary contact(s), arranged to activate
JO/EWO
28-00014
28-00014
00
A. General Requirements: Comply with ASME A17.1, with 200-kA interrupting and short-
circuit current rating when fitted with Class J fuses.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B. Switches: Three-pole, horsepower rated, with integral shunt trip mechanism and
(DCC) NO. _____________________
28-00014-0002-0001
Class J fuse block; lockable handle with capability to accept three padlocks;
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
C. Control Circuit: 230-V ac; obtained from integral control power transformer, with
MAS
primary and secondary fuses of enough capacity to operate shunt trip, connected
MAS
D. Accessories:
1. Oiltight key switch for key-to-test function.
ISSUED FOR CONSTRUCTION
28-00014
DISCIPLINE standards, with interrupting capacity to comply with available fault currents.
ENGINEER
ANP
G. Integrally Fused Circuit Breakers: Thermal-magnetic trip element with integral limiter-
style fuse listed for use with circuit breaker and trip activation on fuse opening or on
DATE:
BY:
trip).
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
28-00014
circuit-breaker contacts.
9. Alarm Switch: One NO contact that operates only when circuit breaker has tripped.
NO.
REV
00
DATE:
12/1/16 2.6 ENCLOSURES
CERTIFIED
REZ
A. Enclosed Switches and Circuit Breakers: IP 55 indoors or IP 67 outdoors to
12/1/16 comply with environmental conditions at installed location.
DATE:
CONSTRUCTION
AGENCY
1. Indoor, Dry and Clean Locations: IP 55.
AAG 2. Outdoor Locations: IP 67
DATE:
12/1/16 3. Kitchen or Wash-Down Areas: IP 67 stainless steel.
OPERATIONS 4. Other Wet or Damp, Indoor Locations: IP 67
SMK 5. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive
DATE:
12/1/16 Liquids: IP 67.
6. Hazardous Areas: As indicated in Drawings.
CONTROL NUMBER
VERIFICATION
EDSD
PART 3 - EXECUTION
DATE:
BY:
3.1 EXAMINATION
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
breakers for compliance with installation tolerances and other conditions affecting
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
B. Proceed with installation only after unsatisfactory conditions have been corrected.
REZ
ENGG CERT
REZ
3.2 INSTALLATION
MAS
MAS
A. Install individual wall-mounted switches and circuit breakers with tops at uniform
height unless otherwise indicated.
3.3 IDENTIFICATION
28-00014
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
NO.
REV
00
DISCIPLINE
ENGINEER B. Manufacturer's Field Service: Engage a factory-authorized service representative
ANP
to inspect, test, and adjust components, assemblies, and equipment installations,
12/1/16
DATE: including connections.
PROJECT
ENGINEER
MAS C. Perform tests and inspections.
DATE:
12/1/16 1. Manufacturer's Field Service: Engage a factory-authorized service
CERTIFIED representative to inspect components, assemblies, and equipment
REZ
installations, including connections, and to assist in testing.
12/1/16
DATE:
CONSTRUCTION
AGENCY
D. Acceptance Testing Preparation:
AAG 1. Test insulation resistance for each enclosed switch and circuit breaker,
DATE:
12/1/16 component, connecting supply, feeder, and control circuit.
OPERATIONS 2. Test continuity of each circuit.
SMK
DATE:
12/1/16 E. Tests and Inspections:
1. Perform each visual and mechanical inspection and electrical test stated in NETA
CONTROL NUMBER
VERIFICATION
3. Perform the following infrared scan tests and inspections and prepare reports:
a. Initial Infrared Scanning: After Substantial Completion, but not more than
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
switch and circuit breaker. Remove front panels so joints and connections
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
F. Enclosed switches and circuit breakers will be considered defective if they do not
DESCRIPTION
G. Prepare test and inspection reports, including a certified report that identifies
enclosed switches and circuit breakers and that describes scanning results.
Include notation of deficiencies detected, remedial action taken and observations
after remedial action.
3.5 ADJUSTING
28-00014
00
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 29 13 - ENCLOSED CONTROLLERS
REZ
ENGG CERT
REZ
MAS
MAS
PART 1 - GENERAL
1.1 GENERAL
ISSUED FOR CONSTRUCTION
A. The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
DESCRIPTION
1.3 SUMMARY
28-00014
Equipment and Plant to fully execute the requirements to furnish, deliver, and
install the Works as expressly described in the Drawings and Specification, or
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
required that the provisions of this Specification section shall be complementary
ENGINEER
ANP
to, and shall be correlated with, the requirements of the Contract. Nothing in this
12/1/16
specification section shall limit the scope of work as required by the Contract.
DATE:
PROJECT
ENGINEER 1.4 DESCRIPTION
MAS
12/1/16
DATE: A. All motor starters and motor control stations including installation and connection
CERTIFIED
REZ (whether furnished with the equipment specified in other Divisions or otherwise)
12/1/16
shall meet the applicable SASO and IEC reference standards.
DATE:
CONSTRUCTION
AGENCY 1.5 RELATED WORK
AAG
12/1/16
DATE: A. Other sections which specify motor driven equipment, except elevator,
OPERATIONS escalator, and moving walkway motor controllers.
SMK
DATE:
12/1/16 B. Division 26 Common Work Results For Electrical: General electrical requirements
and items that are common to more than one Section of Division 26.
CONTROL NUMBER
VERIFICATION
EDSD
currents.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.6 SUBMITTALS
REZ
ENGG CERT
REZ
B. Shop Drawings:
1. Sufficient information, clearly presented, shall be included to determine
compliance with drawings and specifications.
2. Include electrical ratings, dimensions, weights, mounting details, materials,
ISSUED FOR CONSTRUCTION
C. Manuals:
1. Submit, simultaneously with the shop drawings, companion copies of
complete maintenance and operating manuals, including technical data
sheets, wiring diagrams and information for ordering replacement parts.
a. Wiring diagrams shall have their terminals identified to facilitate
installation, maintenance and operation.
b. Wiring diagrams shall indicate internal wiring for each item of equipment
and interconnections between the items of equipment.
c. Elementary schematic diagrams shall be provided for clarity of operation.
JO/EWO
28-00014
28-00014
2. Two weeks prior to the project final inspection, submit four copies of the
final updated maintenance and operating manual to Saudi Aramco
00F1 12/1/16
DATE
10/27/16
00
12/1/16
DATE:
OPERATIONS
1.8 QUALITY ASSURANCE
SMK
A. Manufacturers: Firms regularly engaged in manufacture of enclosed starters and
12/1/16
DATE: contractors of types, ratings and characteristics required, whose products have been
CONTROL NUMBER
in satisfactory use in similar service for not less than 10 years. Preference shall be
VERIFICATION
C. Comply with SASO, NEC, NEMA and IEC requirements as applicable to the
(DCC) NO. _____________________
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.9 WARRANTY
REZ
ENGG CERT
REZ
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
Contractor to provide the manufacturer’s standard warranty period but shall not
be less than the duration stipulated in contract.
ISSUED FOR CONSTRUCTION
D. During the guarantee period the manufacturer shall make all necessary repairs
or replacement to achieve conformity to the requirements of the Contract
Documents.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
JO/EWO
28-00014
28-00014
00
DISCIPLINE
3. Arabia Electric Limited.
ENGINEER
ANP
4. Cooper Industries Middle East LCC.
12/1/16
DATE:
PROJECT
2.2 MOTOR STARTERS, GENERAL
ENGINEER
MAS
A. Shall have the following features:
12/1/16
DATE: 1. Separately enclosed unless part of another assembly.
CERTIFIED
REZ 2. Circuit breakers and Isolators within the motor controller enclosures shall
12/1/16 have external operating handles with lock-open padlocking provisions and
DATE:
CONSTRUCTION
shall indicate the ON and OFF positions.
AGENCY
AAG
3. Motor control circuits:
12/1/16
a. Shall operate at not more than 231 volts.
DATE:
OPERATIONS
b. Shall be earthed except as follows:
SMK
1) Where isolated control circuits are shown.
12/1/16
2) Where manufacturers of equipment assemblies recommend that the
DATE:
control circuits be isolated.
CONTROL NUMBER
VERIFICATION
motor controller enclosure to provide the control voltage for each motor
DATE:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
f.Check every motor controller after installation and verify that correct
sizes of protective devices have been installed.
g. Deliver four copies of a summarized list to Saudi Aramco, which
indicates and adequately identifies every motor controller installed.
Include the catalog numbers for the correct sizes of protective devices for
ISSUED FOR CONSTRUCTION
on the drawings as not required for a particular starter. H-O-A switch is not
required for manual motor starters.
6. Auxiliary contacts, pilot lights, pushbuttons and other devices and
accessories as shown on the drawings or otherwise required.
7. Enclosures:
a. Shall comply with the applicable SAOS and IEC reference standards
and shall have a minimum IP rating of 31 and rated suitably for motor kW
rating.
b. Shall be the types which are the most suitable for the environmental
conditions where the motor controllers are being installed.
JO/EWO
28-00014
28-00014
provided.
d. Enclosures shall be primed and finish coated at the factory with the
manufacturer’s prime coat and standard finish.
NO.
REV
00
DISCIPLINE
ENGINEER B. Motor controllers incorporated with equipment assemblies shall also be designed
ANP
for the specific requirements of the assemblies.
12/1/16
DATE:
PROJECT
ENGINEER C. Additional requirements for specific motor controllers, as indicated in other
MAS sections, shall also apply.
12/1/16
DATE:
CERTIFIED D. Provide an Isolator adjacent to each motor. Provide all wiring and conduit
REZ
required to facilitate a complete and code compliant installation.
12/1/16
DATE:
CONSTRUCTION
AGENCY
E. Motor control catches shall be type tested assemblies. Independent test
AAG authority certificates and a declaration of conformity with the Low Voltage
DATE:
12/1/16 Directive shall be provided.
OPERATIONS
SMK F. Refer to paragraph, MOTOR CONTROL STATIONS, in this section for additional
12/1/16 requirements.
DATE:
CONTROL NUMBER
VERIFICATION
1. Starters shall be AC3 for Induction motors and AC8 for Hermetic chillers they
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
shall be, manually operated type with full voltage controller for induction
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
1. Starters shall be AC3 for induction motors, manually operated with full
MAS
1. Switches shall be AC3 for induction motors and AC8 for hermetic chillers,
and manually operated type with full voltage controller for fractional
horsepower induction motors.
DESCRIPTION
2. Units shall include thermal overload protection, red pilot light, low voltage
protection NO & NC auxiliary contacts and toggle operator.
28-00014
Utilisation categories
Induction motors AC-3
Hermetic chillers AC-8
00F1 12/1/16
DATE
10/27/16
Star-delta Starters
NO.
REV
only
DATE:
Optimiser Yes
OF THIS DRAWING IS COVERED, FOR ALL
Self-monitoring Yes
(DCC) NO. _____________________
28-00014-0002-0001
Self-test Yes
Initial voltage 30%
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
and 23 specifications.
D. Shall have closed circuit transition for the types which can incorporate such transition.
E. Shall limit inrush currents to not more than 70 percent of the locked rotor currents.
F. Provide phase loss protection for each starter, with contacts to de-energize
the starter upon loss of any phase.
28-00014
00
not less than 6 mm (1/4-inch) high. Identify the motor by its number or other
EDSD
grounding of the control conductors will not be able to start the motors.
OF THIS DRAWING IS COVERED, FOR ALL
restart automatically when the pushbuttons or switches are released, are not
permitted.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
2.8 ENCLOSURES
REZ
PART 3 - EXECUTION
3.1 INSTALLATION
28-00014
drawings.
00
DISCIPLINE
C. Furnish and install heater elements in motor starters to match the installed motor
ENGINEER
ANP
voltage characteristics.
12/1/16
DATE:
PROJECT
ENGINEER
END OF SECTION 26 29 13
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 - GENERAL
1.1 GENERAL
ISSUED FOR CONSTRUCTION
A. The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
DESCRIPTION
1.3 SUMMARY
28-00014
Equipment and Plant to fully execute the requirements to furnish, deliver, and
install the Works as expressly described in the Drawings and Specification, or
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
required that the provisions of this Specification section shall be complementary
ENGINEER
ANP
to, and shall be correlated with, the requirements of the Contract. Nothing in this
12/1/16
specification section shall limit the scope of work as required by the Contract.
DATE:
PROJECT
ENGINEER 1.4. SYSTEM DESCRIPTION
MAS
12/1/16
DATE: A. Performance Requirements
CERTIFIED
REZ 1. Electromechanical and Electrical Components
12/1/16
a. Electrical and electromechanical components of the Variable Frequency
DATE:
CONSTRUCTION
Drive (VFD) shall not cause electromagnetic interference to adjacent
AGENCY
AAG
electrical or electromechanical equipment while in operation.
12/1/16
DATE: B. Electrical Requirements: all applicable SASO and IEC reference standards.
OPERATIONS
IEEE C62.41.1 and IEEE C62.41.2, IEEE Std 519, and SASO and IEC
SMK
applicable reference standards. Control panel shall have surge protection,
12/1/16
DATE: included within the panel to protect the unitfrom damaging transient voltage
CONTROL NUMBER
surges. Surge arrestor shall be mounted near the incoming power source
VERIFICATION
and properly wired to all three phases and ground. Fuses shall not be used
EDSD
control and sensor wiring installed outdoors and as shown. The inputs
and outputs shall be tested in both normal mode and common mode using
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
a. Sprinkler systems
b. Firefighting hydrant
28-00014
1.6 SUBMITTALS
00
DISCIPLINE
submitted in accordance with Division 01 Submittal Procedures:
ENGINEER
ANP
B. Shop Drawings
12/1/16
DATE: 1. Schematic diagrams
PROJECT
ENGINEER 2. Interconnecting diagrams
MAS
3. Installation drawings
12/1/16
DATE: 4. Submit drawings for Saudi Aramco approval prior to equipment
CERTIFIED
REZ construction or integration. Modifications to original drawings made during
12/1/16
installation shall be immediately recorded for inclusion into the as-built
DATE:
drawings.
CONSTRUCTION
AGENCY
AAG
C. Product Data
12/1/16
DATE: 1. Variable frequency drives
OPERATIONS
2. Wires and cables
SMK
3. Equipment schedule
12/1/16
DATE: 4. Include data indicating compatibility with motors being driven.
CONTROL NUMBER
VERIFICATION
D. Test Reports
EDSD
1. VFD Test
DATE:
BY:
E. Manufacturer's Instructions
(DCC) NO. _____________________
28-00014-0002-0001
1. Installation instructions
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
G. Submit calculations confirming that the line harmonics and notching generated
by the VFDs do not exceed the levels for a general system as defined in
Institute of Electrical and Electronics Engineers Standard 519. Where Isc/IL ratio
ISSUED FOR CONSTRUCTION
is not available, assume <50, and demonstrate that the TDD% will not
exceed 8 at the PCC (Point of Common Coupling). The PCC without
exception shall be considered as the load side of the Service transformers.
DESCRIPTION
28-00014
00
DATE:
12/1/16 A. The publications listed below form a part of this specification to the extent
PROJECT referenced. The publications are referred to within the text by the basic
ENGINEER
MAS
designation only.
12/1/16
DATE:
CERTIFIED
B. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
REZ 1. IEEE C62.41.1 IEEE Guide on the Surges Environment in Low-Voltage
DATE:
12/1/16 (1000 V and Less) AC Power Circuits
CONSTRUCTION 2. IEEE C62.41.2 IEEE Recommended Practice on Characterization of
AGENCY
AAG Surges in Low-Voltage (1000 V and Less) AC Power Circuits
12/1/16 3. IEEE Std 519 Recommended Practices and Requirements for Harmonic
DATE:
OPERATIONS Control in Electrical Power Systems
SMK
12/1/16
1.8 QUALITY ASSURANCE
DATE:
CONTROL NUMBER
A. Burn-in Test
VERIFICATION
1. Pretest (burn-in) drives at full load and full speed and frequency on a
EDSD
of 48 hours.
BY:
B. Schematic Diagrams
APPROVAL/CERTIFICATION REQUIREMENTS,
1. Show circuits and device elements for each replaceable module. Schematic
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
functional assemblies.
REZ
ENGG CERT
REZ
C. Interconnecting Diagrams
MAS
interfaces, including power and signal conductors. Include for enclosures and
external devices.
D. Installation Drawings
ISSUED FOR CONSTRUCTION
1. Show floor plan of each site, with VFD's and motors indicated. Indicate
ventilation requirements, adequate clearances, and cable entries.
DESCRIPTION
E. Equipment Schedule
1. Provide schedule of equipment supplied. Schedule shall provide a cross
reference between manufacturer data and identifiers indicated in shop
drawings. Schedule shall include the total quantity of each item of
equipment supplied. For complete assemblies, such as VFD's, provide the
serial numbers of each assembly, and a sub- schedule of components within
the assembly. Provide recommended spare parts list for each assembly or
component.
JO/EWO
28-00014
28-00014
F. Installation instructions
1. Provide installation instructions issued by the manufacturer of the
equipment, including notes and recommendations, prior to shipment to the
00F1 12/1/16
DATE
10/27/16
DISCIPLINE 1. Document test results and submit to Saudi Aramco within 7 working days
ENGINEER
ANP after completion of test.
12/1/16
DATE:
PROJECT 1.9 DELIVERY AND STORAGE
ENGINEER
MAS
12/1/16
A. Equipment delivered and placed in storage shall be stored with protection
DATE:
CERTIFIED
from the weather, humidity and temperature variations, dirt and dust, or other
REZ contaminants.
12/1/16
DATE:
CONSTRUCTION
1.10 WARRANTY
AGENCY
AAG
A. Refer to Division 01 - Warranties.
12/1/16
DATE:
OPERATIONS
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
SMK
Contractor to provide the manufacturer’s standard warranty period but shall not
12/1/16
DATE: be less than the duration stipulated in contract.
CONTROL NUMBER
VERIFICATION
D. During the guarantee period the manufacturer shall make all necessary
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
PART 2 - PRODUCTS
REZ
ENGG CERT
REZ
2.1 MANUFACTURERS
MAS
MAS
1. ABB
2. Schneider Electric
3. Other manufacturers as approved by Aramco.
DESCRIPTION
A. Provide frequency drive to control the speed of induction motor(s). The VFD
shall include the following minimum functions, features and ratings.
B. Input circuit breaker / Isolator with a minimum of 25,000 amps, but as defined
elsewhere in this specification or on the drawings. Symmetrical interrupting
capacity and door interlocked external operator.
JO/EWO
28-00014
28-00014
C. A converter stage shall change fixed voltage, fixed frequency, ac line power to a
fixed dc voltage. The converter shall utilize a full wave bridge design
00F1 12/1/16
DATE
10/27/16
00
12/1/16
D. An inverter stage shall change fixed dc voltage to variable frequency, variable
DATE:
PROJECT
voltage ac for application to a standard squirrel cage motor. The inverter shall
ENGINEER
be switched in a manner to produce a sine coded pulse width modulated (PWM)
MAS
12/1/16
output waveform.
DATE:
CERTIFIED
REZ E. The VFD shall be capable of supplying 125 percent of rated full load current
12/1/16 for one minute at maximum ambient temperature.
DATE:
CONSTRUCTION
AGENCY
AAG
F. The VFD shall be designed to operate from a 400 volt, + or - 10 percent, three
phase, 60 Hz supply, and control motors with a corresponding voltage rating.
12/1/16
DATE:
OPERATIONS
G. Acceleration and deceleration time shall be independently adjustable from one
SMK
second to 60 seconds.
12/1/16
DATE:
H. Adjustable full-time current limiting shall limit the current to a preset value which
CONTROL NUMBER
VERIFICATION
shall not exceed 120 percent of the controller rated current. The current limiting
EDSD
action shall maintain the V/Hz ratio constant so that variable torque can be
maintained. Short time starting override shall allow starting current to reach
DATE:
BY:
175 percent of controller rated current to maximum starting torque. The volts-
to-hertz ration shall be adjustable. Critical frequency rejection points shall be
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
I. The controllers shall be capable of producing an output frequency over the range
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
J. Minimum and maximum output frequency shall be adjustable over the following
ranges: 1. Minimum frequency 2.5 Hz to 50 percent of maximum selected
frequency;
ISSUED FOR CONSTRUCTION
K. The controller efficiency at any speed shall not be less than 96 percent.
L. The controllers shall be capable of being restarted into a motor coasting in the
forward direction without tripping.
28-00014
5. Input overvoltage
6. Loss of input phase
NO.
REV
00
DATE:
12/1/16 N. Solid state motor overload protection shall be included such that current
CERTIFIED exceeding an adjustable threshold shall activate a 60 second timing circuit.
REZ
Should current remain above the threshold continuously for the timing period,
12/1/16 the controller will automatically shut down.
DATE:
CONSTRUCTION
AGENCY
AAG O. A slip compensation circuit shall be included which will sense changing motor
DATE:
12/1/16 load conditions and adjust output frequency to provide speed regulation to
OPERATIONS within + / - 0.5 percent of maximum speed without the necessity of a tachometer
SMK generator.
12/1/16
DATE:
P. The VFD shall be factory set for manual restart after the first protective circuit
CONTROL NUMBER
VERIFICATION
required.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
Q. The VFD shall include external fault reset capability. All the necessary logic to
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
critical harmonics that cause resonant vibrations. The VFD shall have a
minimum of three user selectable bandwidths.
MAS
MAS
S. Provide the following operator control and monitoring devices mounted on the
front panel of the VFD:
1. Manual speed potentiometer.
2. Hand-Off-Auto (H-O-A) switch.
ISSUED FOR CONSTRUCTION
3. Power on light.
4. Drive run power light.
DESCRIPTION
5. Local display.
6. “Hand-Off-Auto” (H-O-A) selector switch for local or remote start/stop function.
7. “Run” pilot light.
T. Provide properly sized and rated by-pass and isolation contactors to enable
operation of motor in the event of VFD failure. Mechanical and electrical
interlocks shall be installed between the by-pass and isolation contactors.
Provide a selector switch and transfer delay timer.
1. The local display shall be a door mounted diagnostic indicator with
touchpad interface, which incorporates:
JO/EWO
28-00014
28-00014
a. Controller Run
b. Voltage to Motor
c. Current to Motor
00F1 12/1/16
DATE
10/27/16
00
f. KWh
DISCIPLINE
ENGINEER g. Elapsed Time Meter, five digit type
ANP
h. Over temperature
12/1/16
DATE: i. Overcurrent
PROJECT
ENGINEER j. Over frequency
MAS k. Overvoltage
12/1/16 l. Under voltage
DATE:
CERTIFIED
REZ
m. Motor Overload
n. Ground Fault
12/1/16
DATE: o. Short Circuit
CONSTRUCTION
AGENCY p. Phase Loss
AAG
q. Control Circuit Fault
12/1/16
DATE:
OPERATIONS U. The controller shall have an automatic restart function to attempt restart after
SMK
the unit trips off when power is lost to the unit. A time delay shall be provided
DATE:
12/1/16 between restarts. The unit shall not attempt to restart more than five times in
the automatic mode. In addition, the controller shall have a "power dip" ride-thru
CONTROL NUMBER
VERIFICATION
interruptions.
DATE:
BY:
V. The controller shall have an adjustable carrier frequency, adjustable from 0.75 to
15 kHz without deviating maximum capacity of the controller.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
W. The controller shall not create any feedback noise on the input line that will
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
X. The following additional functional features shall be provided for the controller:
1. Each controller shall be provided with a door interlocked disconnect
DESCRIPTION
28-00014
00
DISCIPLINE
ENGINEER Y. Provide the following:
ANP
1. Communicates port that provided communication link to computer or
12/1/16
DATE: programmable controller
PROJECT
ENGINEER 2. Plug-in or integral diagnostic test module.
MAS
3. Auxiliary relay with 2 N.O. and 2 N.C. contacts for remote indication of faults.
12/1/16
DATE: 4. Line and DC reactors with each controller.
CERTIFIED
REZ 5. Provide a 20 amp 2 pole; 250 volt rated auxiliary NC contact for wiring the
12/1/16
space heater of the driven motor.
DATE:
CONSTRUCTION
AGENCY Z. The controller shall be fully compatible to communicate through serial
AAG
communication to the Building DDC equipment.
12/1/16
DATE:
OPERATIONS 2.3 INTEGRAL LINE REACTORS
SMK
DATE:
12/1/16 A. The variable frequency drive (VFD) shall include integral 3% line reactors to
reduce line noise generated by the inverter and 5% DC reactor to limit
CONTROL NUMBER
VERIFICATION
confirming that the line harmonics and notching generated by the VFD do not
exceed the levels for a general system as stated in the Institute of Electrical
DATE:
BY:
and Electronics Engineers Standard 519 "Guide for Harmonic Control of Static
Power Converters" to a maximum of 5% Total Voltage Harmonic Distortion
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
(VTHD), and 8% TDD for current at Point of Common Coupling (PCC). The
POC shall be assumed as the Service switchboard for VTHD and TDD
(DCC) NO. _____________________
28-00014-0002-0001
calculations.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
B. Line notch area shall not exceed 22,800 (V/S) and 20% notch depth.
REZ
D. Provide an “As Built” drive control schematic (ladder diagram) shall be taped
to the inside of the controller cabinet.
ISSUED FOR CONSTRUCTION
2.4 ENCLOSURES
DESCRIPTION
28-00014
A. All wires and cables shall conform to applicable SASO and IEC reference
standards. Enclosures shall have a minimum IP rating of 31 and shall be
NO.
REV
00
DISCIPLINE vermin proof. The Contractor shall however select equipment with an IP
ENGINEER
ANP
rating higher than 31 where environmental conditions dictate this.
12/1/16
DATE:
PROJECT
2.6 NAMEPLATES
ENGINEER
MAS
A. Nameplates external to enclosures shall conform with the requirements of
12/1/16
DATE: Division 26 internal to enclosures shall be manufacturer's standard, with the
CERTIFIED
REZ exception that they must be permanent.
12/1/16
DATE:
2.7 SOURCE QUALITY CONTROL
CONSTRUCTION
AGENCY
AAG
A. VFD Factory Test Plan
12/1/16
DATE: 1. To ensure quality, each VFD shall be subject to a series of in-plant quality
OPERATIONS
control inspections before approval for shipment from the manufacturer's
SMK
facilities. Provide test plans and test reports.
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
PART 3 - EXECUTION
EDSD
3.1 INSTALLATION
DATE:
BY:
drawings and the approved shop drawings. A field representative of the drive
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. VFD Test
DESCRIPTION
28-00014
00
factor result.
DISCIPLINE
ENGINEER c. Indicate kW rating of the driven load and provide overload relay settings
ANP
at the drive and the bypass controller.
12/1/16
DATE: 3. Harmonic Distortion at PCC Report
PROJECT
ENGINEER a. Test with a Power Quality meter at the secondary side of service
MAS
transformer and demonstrate that the VFD contribution to the Total
12/1/16
DATE: Harmonic Distortion at the PCC is less than 5% Voltage Total Harmonic
CERTIFIED
REZ Distortion (VTHD) and less than 8% Total Current Demand Distortion
12/1/16
(TDD) at the PCC per IEEE-519 standards. The PCC shall be
DATE:
CONSTRUCTION
considered at the load side of the service transformer or incoming service
AGENCY
AAG
switchboard or motor control center / distribution panel board feeding the
12/1/16
drive controllers. A reading from a commissioned switchboard multi-
DATE: function meter may be alternatively used.
OPERATIONS
SMK
C. Performance Verification Tests
12/1/16
DATE:
CONTROL NUMBER
reserves the right to witness all tests, review data, and request other
such additional inspections and repeat tests as necessary to ensure that
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
the system and provided services conform to the stated requirements. The
(DCC) NO. _____________________
Contractor shall inform Saudi Aramco 14 calendar days prior to the date
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
D. Endurance Test
REZ
rates for not less than 192 consecutive hours, at an average effectiveness
level of .9998, to demonstrate proper functioning of the complete PCS.
Continue the test on a day-to-day basis until performance standard is met.
During the endurance test, the Contractor shall not be allowed in the
ISSUED FOR CONSTRUCTION
END OF SECTION 26 29 23
JO/EWO
28-00014
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP
DATE:
12/1/16 B. Section includes lightning protection for structures, structure elements and
PROJECT
ENGINEER
building site components.
MAS
12/1/16 1.3 RELATED DOCUMENTS
DATE:
CERTIFIED
REZ 1.3.1 Drawings and general provisions of the Contract, including General and
DATE:
12/1/16 Supplementary Conditions and Division 01 Specification Sections, apply to
CONSTRUCTION this Section.
AGENCY
AAG
DATE:
12/1/16 1.4 DESCRIPTION
OPERATIONS
SMK 1.4.1 This section specifies the furnishing and installation of a complete lightning
12/1/16 protection system, complying with Chapter 802 “PROTECTION AGAINST
DATE:
LIGHTNING” of the Saudi Building Code (SBC) Electrical section.
CONTROL NUMBER
VERIFICATION
1.5 SUBMITTALS
EDSD
DATE:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
calculations required by the SBC for risk assessment and bonding of earthed
REZ
ENGG CERT
REZ
28-00014
B. System Certificate:
1. Compliance with SBC requirements
NO.
REV
00
12/1/16
DATE: 1.7 COORDINATION
PROJECT
ENGINEER
MAS A. Coordinate installation of lightning protection with installation of other building
DATE:
12/1/16 systems and components, including electrical wiring, supporting structures and
CERTIFIED building materials, metal bodies requiring bonding to lightning protection
REZ
components, and building finishes.
12/1/16
DATE:
CONSTRUCTION
AGENCY
B. Coordinate installation of air terminals attached to roof systems with roofing
AAG manufacturer and Installer.
12/1/16
DATE:
OPERATIONS C. Flashings of through-roof assemblies shall comply with roofing manufacturers'
SMK specifications.
12/1/16
DATE:
D. Where building elements are used as part of the system, they shall be tested
CONTROL NUMBER
VERIFICATION
during construction to ensure that the resistance is low enough for the purpose.
EDSD
Formal records shall be kept and submitted for all such tests.
DATE:
1.8. WARRANTY
OF THIS DRAWING IS COVERED, FOR ALL
A. Refer to Saudi Aramco contract for minimum required warranty after handover.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
Contractor to provide the manufacturer’s standard warranty period but shall not
REZ
ENGG CERT
REZ
C. During the guarantee period the manufacturer shall make all necessary repairs or
ISSUED FOR CONSTRUCTION
PART 2 - PRODUCTS
B. Roof-Mounted Air Terminals: Air termination network shall utilize the roof
cladding system.
JO/EWO
28-00014
28-00014
b. Fuse
00
DISCIPLINE
ENGINEER D. Ground Loop Conductor: Where required by the drawings the same size and
ANP
12/1/16
type as the main conductor except tinned.
DATE:
PROJECT
ENGINEER E. Earth Electrodes: In general earth electrodes shall make use of the structural
MAS
foundations of the building. Where separate earth electrodes are detailed these
12/1/16
DATE: shall be copper clad zinc coated of the type and dimensions indicated on the
CERTIFIED
REZ drawings.
12/1/16
DATE:
CONSTRUCTION
AGENCY PART 3 - EXECUTION
AAG
12/1/16
DATE: 3.1 INSTALLATION
OPERATIONS
SMK A. Install lightning protection components and systems according to the SBC and all
DATE:
12/1/16 applicable reference standards.
CONTROL NUMBER
VERIFICATION
B. Install conductors with direct paths from air terminals to Earth Electrode
EDSD
1. System conductors.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
3. Interior conductors.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
of building.
MAS
G. The weather proofing of the building shall not be impaired in any way by fixings
or by any part of the lightning protection system. Work on flat roofs shall be
coordinated with the roofing contractor.
28-00014
J. Where conductors cross building expansion joints, a flexible link in the form of a
loop or a braided or stranded length of conductor shall be incorporated. The
NO.
REV
00
DISCIPLINE
flexible link shall be firmly fixed on both sides of the expansion joint.
ENGINEER
ANP
12/1/16
K. Copper clad steel rods shall have threads with the copper cladding maintained
DATE:
PROJECT
throughout. Couplings shall be of silicon aluminum bronze and shall be fully
ENGINEER threaded to allow metal-to-metal contact of the rods. Couplings shall be counter-
MAS
bored and of sufficient length to completely cover and protect the threaded
12/1/16
DATE: portion of the rods to minimize corrosion.
CERTIFIED
REZ
12/1/16
L. Driving heads for the rods shall be high tensile steel and shall be fully threaded to
DATE:
CONSTRUCTION
ensure head-to-rod contact.
AGENCY
AAG
3.2 CORROSION PROTECTION
12/1/16
DATE:
OPERATIONS A. Do not combine materials that can form an electrolytic couple that will accelerate
SMK corrosion in the presence of moisture unless moisture is permanently excluded from
12/1/16 junction of such materials. Contact between dissimilar metals shall be avoided, except
DATE:
as permitted by SASO and IEC standards. Precautions shall be taken to prevent long
CONTROL NUMBER
VERIFICATION
DATE:
corrosion of conductors.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00F1 00 10/27/16 28-00014 ISSUED FOR CONSTRUCTION MAS REZ AAG
OF THIS DRAWING IS COVERED, FOR ALL SMK
CONTROL NUMBER
REZ
ANP
SMK
AAG
28-00014
MAS
APPROVAL/CERTIFICATION REQUIREMENTS, 00F1 12/1/16 ISSUED FOR CONSTRUCTION MAS REZ AAG SMK
12/1/16
12/1/16
12/1/16
AGENCY
12/1/16
12/1/16
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
CERTIFIED
OPERATIONS
CONSTRUCTION
28-00014-0002-0001
(DCC) NO. _____________________ DATE:
DHAHRAN
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
DOC
EWO:
A A18
DWG.TYPE PLANT NO. INDEX
END OF SECTION 26 41 13
SAUDI ARABIAN OIL COMPANY
28-00014-0002
DRAWING NO.
DE-D20114
B. Inspection in accordance with the SBC and applicable reference standards.
OF
203
160
SHT.NO.
EDSD/2616-0399.doc
REV.NO.
00F1
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 1 - GENERAL
1.1 GENERAL
ISSUED FOR CONSTRUCTION
A. The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
DESCRIPTION
1.3 SUMMARY
JO/EWO
28-00014
28-00014
00
DISCIPLINE complete and acceptable in every respect for its intended purpose. It is further
ENGINEER
ANP
required that the provisions of this Specification section shall be complementary
12/1/16 to, and shall be correlated with, the requirements of the Contract. Nothing in this
DATE:
PROJECT specification section shall limit the scope of work as required by the Contract.
ENGINEER
MAS
12/1/16
B. Section includes field-mounted TVSS for low-voltage (231 to 400 V) power
DATE:
CERTIFIED
distribution and control equipment.
REZ
12/1/16
C. Related Sections:
DATE:
CONSTRUCTION
1. Division 26 Switchboards for factory-installed TVSS.
AGENCY
AAG
2. Division 26 Panelboards for factory-installed TVSS.
12/1/16
3. Division 26 Wiring Devices for devices with integral TVSS.
DATE:
OPERATIONS
1.4 DEFINITIONS
SMK
12/1/16
DATE: A. ATS: Acceptance Testing Specifications.
CONTROL NUMBER
C. TVSS: Transient voltage surge suppressor(s), both singular and plural; also,
transient voltage surge suppression.
DATE:
BY:
1.5 SUBMITTALS
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
A. Product Data: For each type of product indicated. Include rated capacities,
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
accessories.
REZ
ENGG CERT
REZ
28-00014
C. Comply with IEEE C62.41.2 and test devices according to IEEE C62.45.
00F1 12/1/16
DATE
10/27/16
00
12/1/16
1.9 WARRANTY
DATE:
CONTROL NUMBER
B. Refer to Saudi Aramco contract for minimum required warranty after handover.
DATE:
Contractor to provide the manufacturer’s standard warranty period but shall not
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
D. During the guarantee period the manufacturer shall make all necessary repairs
REZ
Documents.
MAS
PART 2 - PRODUCTS
ISSUED FOR CONSTRUCTION
2.1 PERFORMANCE
B. The SPD/TVSS shall be capable of surviving the UL 1449 3rd Edition Nominal
Discharge Test. The repetitive surge current capacity shall be tested utilizing an
8x20µs, 20kA short circuit test waveform (as defined by ANSI/UL 1449 3rd
Edition – 2009, IEEE C62.41.2 – 2002 and IEEE C62.45 – 2002). Surges shall
JO/EWO
28-00014
28-00014
be applied in three (3) groups of five (5) surges. Within one (1) second after the
application of each surge, the specified MCOV shall be applied for sixty (60)
seconds (+15 seconds). After each group of five (5) surges, the sample shall
00F1 12/1/16
DATE
10/27/16
rest for thirty (30) minutes. After the 15th surge, the MCOV shall be reapplied
for at least fifteen (15) minutes. During and following this test there shall be
no opening of any supplementary protective devices either internal or external
NO.
REV
00
12/1/16
C. The following are the general requirements of the SPD/TVSS products:
DATE:
PROJECT
1. Nomenclatures used herein are intended to indicate product type and
ENGINEER
configuration of equipment required.
MAS
12/1/16
2. UL1449 3rd Edition Listed and must bear the 3rd Edition mark.
DATE:
CERTIFIED
3. UL1283 5th Edition Listed.
REZ 4. The Surge Protective Device (SPD/TVSS) shall be a stand-alone
12/1/16 configuration. Systems that must be integral to the switchgear will not be
DATE:
CONSTRUCTION considered.
AGENCY
AAG 5. The surge protection system shall provide effective high-energy Transient
12/1/16 Voltage Suppression and attenuate high frequency electrical noise.
DATE:
OPERATIONS
6. All suppression systems must be permanently connected, parallel designs.
SMK Series suppression elements are not acceptable.
12/1/16 7. Short Circuit Current Rating “SCCR” of 100kAIC without the need for
DATE:
fuses or breakers external to the SPD/TVSS.
CONTROL NUMBER
VERIFICATION
mode.
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
3 SPD/TVSS designs using a single fuse to protect two (2) or more surge paths
REZ
ENGG CERT
REZ
E. The let-through voltage test results used to obtain the UL1449 3rd Edition
DESCRIPTION
28-00014
00
DATE:
12/1/16 B. Peak Single-Impulse Surge Current Rating: 320 kA per mode/640 kA per phase.
OPERATIONS
SMK C. Minimum single impulse current ratings, using 8-by-20-mic.sec waveform
DATE:
12/1/16 described in IEEE C62.41.2
1. Line to Neutral: 70,000 A.
CONTROL NUMBER
VERIFICATION
D. Protection modes and UL 1449 SVR for grounded wye circuits with 400Y/231
V 3- phase, 4-wire circuits shall be as follows:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
E. Protection modes and UL 1449 SVR for 231 V, single-phase, 3-wire circuits shall
REZ
be as follows:
MAS
F. Protection modes and UL 1449 SVR for 400 V, 3-phase, 3-wire, delta circuits
ISSUED FOR CONSTRUCTION
shall be as follows:
1. Line to Line: 2000 V for 400 V.
2. Line to Ground: 2000 V for 400 V.
DESCRIPTION
28-00014
00
12/1/16
D. Minimum single impulse current ratings, using 8-by-20-mic.sec waveform
DATE:
described in IEEE C62.41.2:
CONTROL NUMBER
VERIFICATION
a. Protection modes and UL 1449 SVR for grounded wye circuits with
APPROVAL/CERTIFICATION REQUIREMENTS,
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install TVSS devices at service entrance on load side, with ground lead
bonded to service entrance ground.
JO/EWO
28-00014
28-00014
B. Install TVSS devices for panelboards and auxiliary panels with conductors or
buses between suppressor and points of attachment as short and straight as
00F1 12/1/16
DATE
10/27/16
00
DATE:
12/1/16 3.2 FIELD QUALITY CONTROL
PROJECT
ENGINEER
MAS
A. Engage a qualified testing agency to perform tests and inspections.
12/1/16
DATE:
CERTIFIED
B. Manufacturer's Field Service: Engage a factory-authorized service
REZ representative to inspect, test, and adjust components, assemblies, and
DATE:
12/1/16 equipment installations, including connections.
CONSTRUCTION 1. Verify that electrical wiring installation complies with manufacturer's written
AGENCY
AAG installation requirements.
12/1/16
DATE:
OPERATIONS
C. Perform tests and inspections.
SMK
1. Manufacturer's Field Service: Engage a factory-authorized service
12/1/16
representative to inspect components, assemblies, and equipment
DATE:
installations, including connections, and to assist in testing.
CONTROL NUMBER
VERIFICATION
1. Perform each visual and mechanical inspection and electrical test stated in
DATE:
2. After installing TVSS devices but before electrical circuitry has been
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
E. TVSS device will be considered defective if it does not pass tests and inspections.
REZ
ENGG CERT
REZ
END OF SECTION 26 43 13
JO/EWO
28-00014
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
26 50 00 - LIGHTING
REZ
ENGG CERT
REZ
MAS
MAS
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
required that the provisions of this Specification section shall be complementary to,
and shall be correlated with, the requirements of the Contract. Nothing in this
NO.
REV
00
specification section shall limit the scope of work as required by the Contract.
DISCIPLINE
ENGINEER
ANP
DATE:
12/1/16 1.3 DESCRIPTION
PROJECT
ENGINEER
MAS
A. General: Extent of Interior & exterior lighting fixture work is indicated on drawings
12/1/16
and schedules, and by requirements of this Section.
DATE:
CERTIFIED
REZ B. Types: Types of Interior & exterior lighting fixtures, lamps and ballasts in this
12/1/16
Section shall include the following:
DATE:
CONSTRUCTION
1. Fluorescent (Compact and Linear Types)
AGENCY 2. High Intensity Discharge (HID)
AAG
3. Light Emitting Diodes (LED)
12/1/16
DATE:
OPERATIONS C. Related Sections: Refer to electrical section for the following:
SMK
1. Basic Electrical Materials and Methods.
DATE:
12/1/16 2. Electrical Identification
3. Wires and Cables
CONTROL NUMBER
VERIFICATION
5. Wiring Devices
6. Lighting Control Systems
DATE:
BY:
D. Other Divisions: Refer to other divisions of the specification for the following:
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
1.4. REFERENCES
REZ
ENGG CERT
REZ
J. The Energy Policy Act of 1992: Lamp Efficiency Labeling and Standards
JO/EWO
28-00014
28-00014
1.5. SUBMITTALS
A. Product Data: Submit manufacturer's data on lighting fixtures, lamps and ballasts.
NO.
REV
00
DISCIPLINE
ENGINEER B. Shop Drawings: Submit dimensioned drawings of lighting fixtures. Submit fixture
ANP
shop drawings assembled in order of luminaire "Type" designation with proposed
12/1/16 fixture and accessories clearly indicated on each sheet. Shop drawings may be
DATE:
PROJECT
ENGINEER submitted for review before fabrication. Fabrication details may vary slightly from
MAS those shown on drawings provided those changes do not adversely affect ease
DATE:
12/1/16 of installation, durability, performance, or appearance of fixture.
CERTIFIED
REZ
C. "Approved Equal" specification status does not and shall not exempt the
DATE:
12/1/16 identified manufacturers from full and complete compliance with all criteria
CONSTRUCTION identified either in the specifications or as attributed to "prime specification"
AGENCY
AAG equipment with regards to photometric performance, brightness control, size,
DATE:
12/1/16 finishes, credentials or experience, etc. Consideration, acceptance or rejection of
OPERATIONS any proposed submittal at any time shall rest solely upon the evaluation of Saudi
SMK Aramco.
12/1/16
DATE:
D. Product Data: Submit manufacturer's data including the following:
CONTROL NUMBER
VERIFICATION
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
of prototype samples.
1.7 WARRANTY
Refer to Saudi Aramco contract for minimum required warranty after handover.
ISSUED FOR CONSTRUCTION
Contractor to provide the manufacturer’s standard warranty period but shall not be
less than the duration stipulated in contract.
DESCRIPTION
PART 2 - PRODUCTS
2.1 GENERAL
A. All goods and products covered by these specifications shall be, when available,
from an in-Kingdom manufacturer/supplier. Make of the lighting fixtures should
be Inara, Philips, Thorlux, Saudi lighting Co., Oppel lighting with lamps Osram,
Philips, Opple lighting, National lighting, Nardeen or approved equivalent.
JO/EWO
28-00014
28-00014
yellowing binder and high pigment to binder ratio, with semi-gloss finish. Ferrous
parts shall be prepared for finish by industry standard finishing process (see
NO.
REV
00
Finishes). Non ferrous metals (i.e. aluminum) unless otherwise noted be treated
DISCIPLINE
ENGINEER with a semi-gloss polyester powder coat enamel finish.
ANP
DATE:
12/1/16 C. Provide each fixture with lamps as indicated in the lighting fixture schedule.
PROJECT
ENGINEER
MAS D. Recessed, surface or pendant lighting fixtures shall be suspended from structural
12/1/16 members or ceiling structure members of minimum 1-1/2" channels, by standard
DATE:
CERTIFIED bar hangers, or other approved means. Fixture locations shall be coordinated
REZ with ceiling patterns. Refer to architectural reflected ceiling plan for exact location
DATE:
12/1/16 of fixtures and architectural rooms finish schedule for ceiling construction details
CONSTRUCTION and mounting heights. The installing contractor shall provide all structural steel
AGENCY
AAG and related supports as required or necessary to properly and safely install and
12/1/16 support the fixtures.
DATE:
OPERATIONS
SMK
E. Fixture wiring shall be suitable for the temperature rating of the fixture; wiring
12/1/16
through fluorescent channels shall be done with Type SFF2 wire. Where a
DATE: junction box is required, to change from branch circuit to fixture wiring, use
CONTROL NUMBER
approved feed through, pre-wired fixture wiring, and install a separate junction
VERIFICATION
box. The junction box shall be fully accessible after installation of covering
EDSD
constructed that all electrical components are easily accessible and replaceable
without removing fixtures from their mountings, or disassembling adjacent
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
construction.
(DCC) NO. _____________________
28-00014-0002-0001
F. All recessed and surface mounted lighting fixtures unless otherwise noted or
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
furnished complete with all required integral wiring and all required flexible
REZ
conditions, pigtails and related accessories necessary for suitable operation and
MAS
installation.
MAS
G. All exposed Junction Boxes (JB) to be provided with cover plates with a design
finish that matches interior design finishes.
I. All materials, accessories, and other related fixture parts shall be new and free
from defects which in any manner may impair their character, appearance,
strength, durability and function, and be effectively protected from any damage or
injury from the time of fabrication to the time of delivery and until final written
acceptance of the work by the Owner.
28-00014
00
DISCIPLINE B. Lighting fixtures shall be furnished and installed complete with necessary parts,
ENGINEER
ANP lamps, all as herein specified and as shown on the drawings. All lighting fixtures
DATE:
12/1/16 shall operate on 230 Volts, 60 Hz, power supply, unless otherwise shown.
PROJECT
ENGINEER
2.3 BALLASTS
MAS
12/1/16
DATE: A. Ballast for fluorescent lamps shall be thermally protected type, high frequency
CERTIFIED
REZ electronic ballast.
12/1/16
DATE: B. Operate on 230 Volts, 60 HZ, supply, load rating suitable for the lamps.
CONSTRUCTION
AGENCY
AAG
C. The ballast shall operate the lamps in a manner that will not adversely curtail the
12/1/16 normal life of the lamp. The light output shall not vary by more than +/- 5% for a
DATE:
OPERATIONS variation of +/- 10% variation of the input voltage about the central design
SMK voltage. Light output shall remain constant for a +/- 5% variation of the input
DATE:
12/1/16 voltage.
CONTROL NUMBER
VERIFICATION
D. The noise level, from 600mm from the installed fixture, shall not exceed 30db.
EDSD
E. The ballast shall have high power factor and shall not be less than 95%.
DATE:
BY:
A. The following General Requirements shall apply to fixtures that are furnished by
(DCC) NO. _____________________
the Manufacturer:
28-00014-0002-0001
1. All LED fixtures supplied shall be warranted per Aramco standards. The
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
Manufacturer shall replace any LED fixture that exhibits failure due to
REZ
ENGG CERT
workmanship or material defect, or does not meet the minimum light output
REZ
warranty period but shall not be less than the duration stipulated in contract.
B. Design Requirements
DESCRIPTION
28-00014
against corrosion.
2. Exterior Fixtures shall be completely sealed and gasketed and constructed
00F1 12/1/16
DATE
10/27/16
with power supplies mounted external to the fixture in the existing node
pockets for ease of maintenance.
NO.
REV
00
A. All lamps where applicable shall comply with ANSI C78 Series standards or CIE
VERIFICATION
equivalent lamps
EDSD
C. Lamps shall operate on 230 Volts, 60 HZ, supply, load rating suitable for the lamps.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
D. All lamps shall be of the specified wattage and lumen output as indicated in the
(DCC) NO. _____________________
28-00014-0002-0001
fixture schedule.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
E. Lumen output of all lamps at 33% rated life shall not be less than 80% of initial output.
REZ
ENGG CERT
REZ
F. Contractor shall replace any lamp failing during the first two hundred (200) days
MAS
G. HID: High Pressure Sodium: These lamps shall not be proposed or used on any
portion of this project.
H. Tungsten Halogen Lamps: These lamps shall not be proposed or used on any
ISSUED FOR CONSTRUCTION
2.6 FINISHES
A. Painted surfaces shall be synthetic enamel with acrylic, alkyd, epoxy, polyester
or polyurethane base, light stabilized, baked on at 177°C (350°F) minimum,
catalytically or photochemically polymerized after application.
28-00014
D. Undercoat: Except for stainless steel all ferrous metal surfaces shall be given a
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE E. Unpainted non-reflecting surfaces shall be satin finished and coated with a
ENGINEER
ANP baked-on clear lacquer to preserve the finish. Where aluminum surfaces are
12/1/16 treated with an anodic process, the clear lacquer coating may be omitted.
DATE:
PROJECT
ENGINEER
F. Unpainted aluminum surfaces: Finish interior aluminum trims with an anodized
MAS
12/1/16
coating of not less than 7 mg. per square inch, of a color and surface finish as
DATE: selected by Saudi Aramco. Finish exterior aluminum and aluminum trims with an
CERTIFIED
REZ anodized coating of not less than 35 mg. per square inch of a color and surface
12/1/16
finish as selected by Saudi Aramco.
DATE:
CONSTRUCTION
AGENCY G. Metal finishes: Provide finishes of the color and type indicated and having the
AAG
following properties:
12/1/16
DATE: 1. Protection of metal from corrosion - warranty against perforation of erosion of
OPERATIONS
the finish from weathering. Refer to Saudi Aramco contract for minimum
SMK
required warranty after handover. Contractor to provide the manufacturer’s
12/1/16 standard warranty period but shall not be less than the duration stipulated in
DATE:
contract.
CONTROL NUMBER
VERIFICATION
manufacturer’s standard warranty period but shall not be less than the
duration stipulated in contract.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
3. Uniformity - Provide finish of uniform thickness and color, free from streaks,
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
2.7 REFLECTORS
REZ
ENGG CERT
REZ
1. All lenses, diffusers, and shielding media shall be properly and securely
mounted within fixture assemblies. All shielding materials shall be tightly fitted
with no loose panels or parts and shall show no visible light leaks of
unintentional or unscheduled light.
28-00014
prohibited.
1.Plastic for lenses and diffusers shall be formed of colorless 100% virgin
NO.
REV
00
A. Install where indicated, Timer or an Astronomic Time Switch Control Dial with
day- omitting device powered by a self-starting synchronous motor. Time Switch
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
B. ON operation shall occur automatically at sunset (in city of South Dhahran, Saudi
REZ
A. General: Provide poles of the types and heights indicated. Provide internal
ISSUED FOR CONSTRUCTION
raceway for underground power supply, with luminaire support poles base
indicated. Provide poles that will carry the indicated supports, luminaires and
DESCRIPTION
B. Steel Poles: Provide [octagonal] steel lighting poles with tapered tubular shaft;
equipped for mast arm luminaire mounting. Provide wiring access handhole with
welded ½-inch NC ground lug, readily accessible from handhole opening.
Provide features as follows:
1. Provide octagonal steel shaft poles with a minimum yield strength of 55,000 psi.
2. Where indicated, provide embedded type pole with adequately sized (at least
JO/EWO
28-00014
28-00014
minimum, coal tar epoxy coating allowed to fully cure before placing pole.
00
aluminum tube of alloy 6063-T6, welded to top and bottom of aluminum base
DISCIPLINE
ENGINEER casting of alloy 356.
ANP
1. The pole shaft shall be a one-piece aluminum element. The lowest section of
12/1/16
DATE: the shaft, which fits into the base, shall be fabricated in such a manner that
PROJECT
ENGINEER the shaft columns and base are interchangeable. The shaft, when fitted into
MAS the pedestal, shall be perfectly straight and true. The top of the shaft shall
DATE:
12/1/16 have dimensions to permit attachment to the top mounted luminaire.
CERTIFIED 2. The base shall have a two piece cast aluminum full cover of 319 alloy,
REZ
secured by stainless steel screws. A flush-sided cast aluminum pole cap shall
12/1/16 be provided for side-arm mounted luminaires.
DATE:
CONSTRUCTION
AGENCY
3. Finish shall include a super TGIC thermoset polyester powder coat paint
AAG applied over a chromate conversion coating. The paint used must be anti-
DATE:
12/1/16 graffiti, corrosion resisting, semi-gloss paint (Hunter Green or its equivalent
OPERATIONS as per Landscape Architect/Engineer).
SMK
A. General: This item shall consist of furnishing and installing precast concrete pull
boxes with covers in accordance with these specifications and at the locations
EDSD
B. Materials: The pull boxes shall be constructed with concrete which is reinforced
with welded wire frames. The inside dimensions shall not be less than 24 inches
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
by 18 inches and the depth of the pull box shall not be less than 18 inches. The
(DCC) NO. _____________________
bolt down cover, non- metallic and non-conductive, shall be provided for each
28-00014-0002-0001
pull box. The steel covers shall have a checkered design on top and have a
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
lifting eye. The pull box and cover shall be constructed in such a manner that the
REZ
ENGG CERT
assembly will support light vehicular traffic loads when installed in accordance
REZ
compressive strength. The proportion of cement shall not be less than 564
pounds per cubic yard.
DESCRIPTION
PART 3 - EXECUTION
3.1 INSTALLATION
A. The Contractor shall furnish and install lighting fixtures as noted on the drawings.
Fixtures shall be completely wired and lamps installed and shall be in perfect
operating condition at the time of mechanical completion.
B. Setting and Securing: The Contractor shall set lighting fixtures plumb, square,
JO/EWO
28-00014
28-00014
and level with floor or walls, in alignment with adjacent lighting fixtures, and
secure in accordance with manufacturers' directions and approved shop
00F1 12/1/16
DATE
drawings.
10/27/16
00
suspended and ceiling mounted fixtures and to center of fixture for wall
DISCIPLINE
ENGINEER
mounted fixtures. Obtain approval of the exact mounting for lighting fixtures on
ANP the job before installation is commenced and, where applicable, after
DATE:
12/1/16 coordinating with the type, style, and pattern of the ceiling being installed.
PROJECT
ENGINEER
MAS D. Grounding: The Contractor shall ground non current carrying parts of electrical
DATE:
12/1/16 equipment. Where the copper grounding conductor is connected to a metal other
CERTIFIED than copper, provide specially treated or lined connectors suitable for this
REZ
purpose.
12/1/16
DATE:
CONSTRUCTION E. Installation of fixture locations shall be in strict accordance with the intent of the
AGENCY
AAG contract drawings and approved shop, specifications and drawings.
12/1/16
DATE:
OPERATIONS
F. Fixture locations: Do not scale electrical drawings for exact location of the lighting
SMK
fixtures. In general, the lighting plans indicate the proper locations of lighting
fixtures, unless otherwise noted on architectural plans.
12/1/16
DATE:
CONTROL NUMBER
G. Unless otherwise shown on the Contract Drawings, lighting fixtures and/or fixture
VERIFICATION
outlet boxes shall be provided with hangers to adequately support the complete
EDSD
weight of the lighting fixture. The design of hangers and the method of fastening
other than what is shown on the Contract Drawings, or herein specified, shall be
DATE:
BY:
H. The Contractor shall provide all hangers, rods, mounting brackets, supports,
BY DRAWING COMPLETION CERTIFICATE
frames, earthquake clips and other equipment normally required for the proper,
(DCC) NO. _____________________
28-00014-0002-0001
safe and distortion-free installation in the various surfaces in which they appear.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
I. Instructions: Each lighting fixture shall be packaged with complete illustration and
MAS
J. The contractor shall rigidly align continuous rows of lighting fixtures for true
aligned appearance.
ISSUED FOR CONSTRUCTION
K. The Contractor shall install reflector cones, baffles, aperture plates, light
controlling elements for air handling fixtures and decorative elements after
DESCRIPTION
A. Clean: Clean lighting fixtures of dirt and debris upon mechanical completion of
installation.
JO/EWO
28-00014
28-00014
00
END SECTION
OF THIS DRAWING IS COVERED, FOR ALL
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 1 – GENERAL
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
Equipment and Plant to fully execute the requirements to furnish, deliver, and
install the Works as expressly described in the Drawings and Specification, or
implied therefrom, and in accordance with the standard requirements. It is the
00F1 12/1/16
DATE
10/27/16
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
NO.
REV
00
required that the provisions of this Specification section shall be complementary to,
DISCIPLINE
ENGINEER
and shall be correlated with, the requirements of the Contract. Nothing in this
ANP specification section shall limit the scope of work as required by the Contract.
12/1/16
DATE:
PROJECT
ENGINEER
MAS 1.3 DESCRIPTION OF WORK
12/1/16
DATE:
CERTIFIED
REZ
A. Extent, location, and details of interior lighting fixture work are indicated on
drawings and in schedules.
12/1/16
DATE:
CONSTRUCTION
AGENCY B. Types of interior lighting fixtures in this section include the following:
AAG
12/1/16
DATE: 1. High-intensity-discharge (HID)
OPERATIONS
SMK
2. High-Pressure Sodium.
12/1/16
DATE:
CONTROL NUMBER
4. Fluorescent.
DATE:
BY:
5. Incandescent.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
6. LED
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
lighting fixtures of sizes, types and ratings required, whose products have been in
satisfactory use in similar service for not less than 5 years.
this project.
DESCRIPTION
28-00014
00
DISCIPLINE
ENGINEER 4. UL Compliance: Comply with UL standards, including UL 486A and B,
ANP
12/1/16
pertaining to interior lighting fixtures. Provide interior lighting fixtures and
DATE:
PROJECT
components which are UL-listed and labeled.
ENGINEER
MAS
5. CBM Labels: Provide fluorescent lamp ballasts which comply with Certified
12/1/16
DATE: Ballast Manufacturers Association standards and carry the CBM label.
CERTIFIED
REZ
numerical order, with proposed fixture and accessories clearly indicated on each
sheet. Submit details indicating compatibility with ceiling grid system.
EDSD
DATE:
C. Wiring Diagrams: Submit wiring diagrams for interior lighting fixtures showing
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
D. Samples: Submit one complete operating unit for each type of interior light fixture
REZ
ENGG CERT
REZ
specified.
MAS
MAS
E. Maintenance Data: Submit maintenance data and parts list for each interior
lighting fixture and accessory; including "trouble- shooting" maintenance guide.
Include that data, product data, and shop drawings in maintenance manual; in
accordance with requirements of Division 1.
ISSUED FOR CONSTRUCTION
B. Handle interior lighting fixtures carefully to prevent damage, breaking, and scoring
of finishes. Do not install damaged units or components; replace with new.
28-00014
A. Coordinate with other work including wires/cables, electrical boxes and fittings, and
raceways, to properly interface installation of interior lighting fixtures with other
00F1 12/1/16
DATE
10/27/16
Work.
NO.
REV
00
Lightolier Inc.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
Wide-Light Corp.
Saudi Lighting Co.
MAS
MAS
Philips
Hubbell Lighting Inc.
National Lighting Company
2.02 FIXTURES
ISSUED FOR CONSTRUCTION
A. General: Provide lighting fixtures, of sizes, types and ratings indicated; complete
DESCRIPTION
with, but not limited to, housings, energy- efficient lamps, lamp holders, reflectors,
energy efficient ballasts, starters and wiring. Ship fixtures factory-assembled, with
parts required for a complete installation. Design fixtures with concealed hinges
and catches, with metal parts grounded as common unit, and so constructed as to
dampen ballast generated noise.
B. Wiring: Provide electrical wiring within fixture suitable for connecting to branch
circuit wiring as follows:
28-00014
00
12/1/16
DATE: 2. Provide high pressure sodium lamp in wattages indicated.
CONTROL NUMBER
VERIFICATION
General: Various fixture types required are indicated below. Fixtures must comply
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
installation.
MAS
MAS
1. Fluorescent Fixture:
cool white lamps for operation on 230 volts, and proper trim for
installations in suspended acoustic tile ceilings.
b. Surface Wall Mounted: 212 x 1230 mm surface-mounted, semi-
direct type fixtures with pre-treated CRS sheet steel painted stove
enamelled in white with overall efficiency of not less than 70% of
bare-lamp lumens, shielding assembly of molded virgin acrylic
panels in combination with not less than 20-gage durable etched
and lacquered steel louvers, for operation on 230-volts, with 2
energy-saving Type F instant-start 40 watt, Type T-8/CW slimline
fluorescent lamps as indicated; wire with not less than No. 16 Type
JO/EWO
28-00014
28-00014
AF fixture wire.
c. Recessed mounted downlight: Down light indoor lighting fixture with
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
painted and stove enameled in white color for surface mounted,
ENGINEER semi-recessed and wall mounting. With recessing frame made of
ANP
12/1/16
spun aluminum for semi-recessed fixture and wall bracket for wall
DATE:
PROJECT
mounted fixture and a bracket for semi-recessed fixture made of
ENGINEER formed galvanized steel sheet pre-treated, painted and stove
MAS
enamelled in white color. For use with 1-18 watt fluorescent lamp
12/1/16
DATE: for operation on 230 volts power supply.
CERTIFIED
REZ
to Installer.
EDSD
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
B. Provide fixtures and/or fixture outlet boxes with hangers to properly support fixture
REZ
ENGG CERT
REZ
C. Install flush mounted fixtures to eliminate light leakage between fixture frame and
finished surface.
ISSUED FOR CONSTRUCTION
D. Provide plaster frames for recessed fixtures installed in other than suspended grid
type acoustical ceiling systems. Brace frames temporarily to prevent distortion
DESCRIPTION
during handling.
E. For air supply type fixtures, retain side slot closures in place for adjustment by
Balancing Contractor.
F. Fasten fixtures securely to indicated structural supports; and ensure that pendant
fixtures are plumb and level. Provide individually mounted pendant fixtures longer
than 2 feet with twin stem hangers. Provide stem hanger with ball aligners and
provisions for minimum 1" vertical adjustment. Mount continuous rows of fixtures
with an additional stem hanger greater than number of fixtures in the row.
JO/EWO
28-00014
28-00014
G. Tighten connectors and terminals, including screws and bolts, in accordance with
equipment manufacturer's published torque tightening values for equipment
connectors. Where manufacturer's torquing requirements are not indicated, tighten
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
ENGINEER H. Support surface mounted fixtures greater than 2 feet in length at a point in addition
ANP
to the outlet box fixture stud.
12/1/16
DATE:
PROJECT
ENGINEER 3.03 FIELD QUALITY CONTROL
MAS
12/1/16
DATE: A. Replace defective and burned out lamps for a period of one year following the Date
CERTIFIED
REZ of Substantial Completion.
12/1/16
DATE:
B. At Date of Substantial Completion, replace lamps in interior lighting fixtures which
CONSTRUCTION
AGENCY are observed to be noticeably dimmed after Contractor's use and testing, as judged
AAG
by Architect.
12/1/16
DATE:
OPERATIONS
Refer to Division-1 sections for the replacement/restoration of lamps in interior
SMK
lighting fixtures, where used for temporary lighting prior to Date of Substantial
12/1/16
DATE: Completion.
CONTROL NUMBER
VERIFICATION
C. Furnish stock or replacement lamps amounting to 15%, but not less than 4 lamps
EDSD
in each case, of each type and size lamp used in each type fixture. Deliver
DATE:
A. Clean interior lighting fixtures of dirt and construction debris upon completion of
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
3.05 GROUNDING
3.06 DEMONSTRATION
DESCRIPTION
END OF SECTION
JO/EWO
28-00014
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 1 – GENERAL
MAS
MAS
The LSTK CONTRACTOR shall complete the shop drawing, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
Construction of the facility.
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary to,
00F1 12/1/16
DATE
10/27/16
and shall be correlated with, the requirements of the Contract. Nothing in this
specification section shall limit the scope of work as required by the Contract.
NO.
REV
00
DISCIPLINE
ENGINEER
ANP 1.3 DESCRIPTION OF WORK
12/1/16
DATE:
PROJECT
ENGINEER
A. This Section includes emergency light sets, exit fixtures with integral emergency
MAS battery backup, and emergency fluorescent fixture power supplies with integral
DATE:
12/1/16 battery backup.
CERTIFIED
REZ
B. Related Sections: The following Section contain requirements that relate to this
12/1/16
DATE: Section:
CONSTRUCTION
AGENCY
AAG
Division 16 Section "Interior Lighting Fixtures" for regular fixtures that may be
12/1/16
DATE: connected to emergency circuits to provide emergency lighting.
OPERATIONS
SMK
1.4 QUALITY ASSURANCE
12/1/16
DATE:
A. Electrical Component Standard: Components and installation shall comply with
CONTROL NUMBER
VERIFICATION
SBC 401 (Saudi Building Code Volume 4) and NFPA 70 "National Electrical Code,"
EDSD
with the requirements of SBC 401 prevailing over the NEC provisions.
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
D. Local Code Compliance: Comply with applicable local codes and regulations for
REZ
ENGG CERT
REZ
emergency lighting and exit signage including, but not limited to, colors and letter
heights for exit signs.
MAS
MAS
1.5 SUBMITTALS
A. Product data for each type of emergency lighting unit specified. Assemble in
booklet form with separate sheet for each fixture, arranged in unit "type,"
ISSUED FOR CONSTRUCTION
C. Maintenance data for units specified, for inclusion in Operating and Maintenance
Manual specified in Division 1 and in Division 16 Section "Basic Electrical
Requirements." Submit complete manual material concurrently with system
submittal and updated final versions of manuals with closeout procedures specified
in Division 1 Section "Project Closeout."
28-00014
00F1 12/1/16
DATE
00
12/1/16
A. Available Manufacturers: Subject to compliance with requirements, manufacturers
DATE:
offering products that may be incorporated in the Work include but are not limited
OPERATIONS
SMK
to the following:
12/1/16
DATE: B. Manufacturers: Subject to compliance with requirements, provide products by the
CONTROL NUMBER
following:
VERIFICATION
EDSD
1. Chloride Systems
DATE:
Dual-Lite, Inc.
APPROVAL/CERTIFICATION REQUIREMENTS,
Holophane Lighting
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
Lithonia Lighting
Thomas Industries, Inc.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
Philips
National Lighting Company
MAS
MAS
2. Faceplate: High-impact, UL 94 V-O rated, plastic with snap- out arrows and
color of letters as indicated.
28-00014
00
12/1/16
A. Internal Type: For designated fluorescent fixtures, provided under Division 16
DATE:
Section "Lighting Fixtures," provide internal self-contained, modular, battery-
OPERATIONS
SMK
inverter unit, factory mounted within the fixture body.
12/1/16
DATE: 1. Arrange unit with test switch and LED indicator light, visible and accessible
CONTROL NUMBER
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
1. Arrange unit with test switch and LED indicator light, visible and accessible
ISSUED FOR CONSTRUCTION
28-00014
PART 3 - EXECUTION
00F1 12/1/16
DATE
10/27/16
3.01 INSTALLATION
A. Setting and Securing: Set units plumb, square, and level with ceiling and walls and
NO.
REV
00
DISCIPLINE
secure in accordance with manufacturer's written instructions and approved shop
ENGINEER drawings. Conform to the requirements of NFPA 70.
ANP
12/1/16
DATE:
PROJECT
B. Mounting heights specified or indicated are to bottom of fixture for suspended or
ENGINEER ceiling-mounted fixtures and to center of fixture for wall-mounted fixtures.
MAS
12/1/16
DATE: C. Support: Recessed and semirecessed fixtures may be supported from suspended
CERTIFIED
REZ ceiling support system if the ceiling system support rods or wires are installed at a
12/1/16 minimum of four rods or wires per fixture and located not more than 6 inches from
DATE:
CONSTRUCTION
fixture corners. For fixtures smaller than the ceiling grid, install a minimum of four
AGENCY
AAG
rods or wires per fixture and locate at corner of the ceiling grid in which the fixture
12/1/16
is located. Do not support fixtures by ceiling acoustical panels. Where fixtures
DATE:
OPERATIONS
smaller than the ceiling grid are indicated to be centered in the acoustical panel,
SMK
support fixtures independently with at least two 3/4-inch metal channels spanning
12/1/16
and secured to the ceiling tees. Rods or wires for Section "Acoustical Treatment."
DATE:
Install support clips for recessed fixtures, securely fastened to ceiling grid
CONTROL NUMBER
VERIFICATION
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
3.03 GROUNDING
ISSUED FOR CONSTRUCTION
A. Tests: After emergency lighting units have been installed and building circuits have
been energized with normal power source, apply and interrupt electrical energy to
demonstrate proper operation. Remove and replace malfunctioning units with new
JO/EWO
28-00014
28-00014
units and proceed with retesting. Give the Company Representative advance
notice of dates and times for all field tests. Provide instruments as required to
make positive observation of test results. Include the following in tests:
00F1 12/1/16
DATE
10/27/16
1. Duration of supply.
NO.
REV
00
DATE:
12/1/16 3. Normal transfer to battery source and retransfer to normal.
PROJECT
ENGINEER
MAS 4. Low supply voltage transfer.
12/1/16
DATE:
CERTIFIED B. Insulation Resistance Test: Perform as specified in Division 16 Section "Wires and
REZ
Cables" both before and after connection of fixtures and equipment.
12/1/16
DATE:
CONSTRUCTION C. Electrical Continuity Tests: Perform as specified in Division 16 Section "Wires and
AGENCY
AAG Cables."
12/1/16
DATE:
OPERATIONS D. Lamp Replacement: Prior to tests, install new lamps in emergency lighting units.
SMK After testing, place malfunctioning lamps.
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
END OF SECTION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 1 – GENERAL
MAS
MAS
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
Construction of the facility.
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary to,
00F1 12/1/16
DATE
10/27/16
and shall be correlated with, the requirements of the Contract. Nothing in this
specification section shall limit the scope of work as required by the Contract.
NO.
REV
00
DISCIPLINE
ENGINEER
ANP 1.3 DESCRIPTION OF WORK
12/1/16
DATE:
PROJECT
ENGINEER
A. Extent, location, and details of electrical poles and standards work are indicated on
MAS drawings and in schedules.
12/1/16
DATE:
CERTIFIED B. Applications of lighting poles and standards specified in this section include the
REZ
following:
12/1/16
DATE:
CONSTRUCTION
AGENCY 1. Automobile parking lots.
AAG
12/1/16
DATE: 2. Vehicular storage areas.
OPERATIONS
SMK
3. Promenades/plazas.
12/1/16
DATE:
4. Parks.
CONTROL NUMBER
VERIFICATION
EDSD
5. Pedestrian walkways.
DATE:
BY:
6. Building entrances.
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
C. Excavation and backfilling for poles, standards, and foundations are specified in
Division 2.
(DCC) NO. _____________________
28-00014-0002-0001
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
D. Concrete for embedding poles and for pole foundations and footings is specified in
REZ
ENGG CERT
REZ
Division 3.
MAS
MAS
E. Wire/cables, raceways, and electrical boxes and fittings which are required in
connection with electrical poles and standards are specified in Division-26 Basic
Materials and Methods sections, "Low Voltage Electrical Power Conduators and
Cables," "Raceways and Boxes for Electrical Systems".
ISSUED FOR CONSTRUCTION
F. Exterior lighting fixtures (luminaries) and brackets which are required in connection
with electrical poles and standards are specified in another Division-26 section,
"Exterior Lighting Fixtures."
28-00014
00
DISCIPLINE
ENGINEER C. Codes and Standards:
ANP
12/1/16
DATE:
PROJECT
1. Electrical Code Compliance: Comply with applicable requirements of SBC
ENGINEER 401 (Saudi Building Code Volume 4) and the NEC Articles 220 and 250, as
MAS
applicable to installation, and construction of electrical poles and standards,
12/1/16
DATE: with SBC 401 requirements prevailing over the NEC provisions.
CERTIFIED
REZ
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
B. Shop Drawings: Submit shop drawings of electrical poles and standards, including
JO/EWO
28-00014
28-00014
C. Wiring Diagrams: Submit wiring diagrams for electrical poles and standards
showing connections to electrical power panel feeders, switches, dimmers, and
controllers. Differentiate between portions of electrical wiring which are
NO.
REV
00
DISCIPLINE
manufacturer-installed and portions which are field-installed.
ENGINEER
ANP
12/1/16
D. Samples: Submit one complete unit and component for each type of electrical pole
DATE:
PROJECT
and standard specified.
ENGINEER
MAS
1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
12/1/16
DATE:
CERTIFIED
REZ A. Deliver electrical pole and standard products, and fittings in factory-fabricated
12/1/16 containers or wrappings, which properly protect products from damage.
DATE:
CONSTRUCTION
AGENCY
AAG
B. Store electrical pole and standard products, and fittings in original cartons in well-
12/1/16
ventilated space protected from moisture, construction traffic and debris.
DATE:
OPERATIONS
SMK
C. Handle electrical pole and standard products carefully to prevent breakage, denting
12/1/16
and scoring finish. Wrap finished laminated wood standards and mast arms
DATE:
individually, in heavy-duty moisture-resistant paper for protection in transit. Do not
CONTROL NUMBER
VERIFICATION
A. Coordinate with other electrical work including wires/cables, electrical boxes and
APPROVAL/CERTIFICATION REQUIREMENTS,
B. Sequence electrical pole and standard installation work with other work to minimize
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 2 - PRODUCTS
MAS
MAS
2.01 MANUFACTURERS
1. Standards
28-00014
00
DISCIPLINE
ENGINEER
2. Metal Poles
ANP
DATE:
12/1/16 Anchor Metals, Inc.
PROJECT
ENGINEER
A.B. Chance Co.
MAS Lehigh Structural Steel Co.
DATE:
12/1/16 Lithonia Lighting Div; National Services Industries, Inc.
CERTIFIED Marathon Steel Co.
REZ
Meyer Industries Div; ITT Corp.
12/1/16 Millerbernd Mfg Co.
DATE:
CONSTRUCTION
AGENCY
Union Metal Mfg Co.
AAG Valmont Industries, Inc.
12/1/16
DATE:
OPERATIONS 3. Fiberglass Poles
SMK
DATE:
12/1/16 Electronics and Fiberglass Div; Shakespeare Co.
CONTROL NUMBER
VERIFICATION
Centrecon, Inc.
BY:
5. Pole Hardware
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
28-00014
B. Utility-Type Wood Lighting Poles: Provide utility-type tapered solid wood lighting
NO.
REV
00
DISCIPLINE
poles, with single crossarms, of sizes and type materials indicated; pressure-treat
ENGINEER with creosote solution preservative.
ANP
12/1/16
DATE:
PROJECT
C. Wood Pole Accessories: Where indicated, provide wood pole accessories
ENGINEER including guy-wires, anchors, and eye bolts, of types recommended by wood pole
MAS
manufacturer, of sizes and materials needed to fulfill loading erection application
12/1/16
DATE: requirements.
CERTIFIED
REZ
DATE:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
standards, of sizes and types indicated, comprised of shafts and tenon joints.
REZ
ENGG CERT
REZ
construction features:
5. Material: Bronze.
8. Configuration: Embedded type base and reinforcing sleeve with hand and
JO/EWO
28-00014
28-00014
9. Configuration: Anchor base type with hand hole and cover where indicated.
10/27/16
10. Configuration: Transformer base type with access door and cover.
NO.
REV
00
DISCIPLINE
ENGINEER G. Metal Lighting Standard Accessories: Provide accessories for metal lighting
ANP
standards, including anchor bolts, as recommended by lighting standard
12/1/16
DATE: manufacturer, of sizes and materials needed to meet erection and loading
PROJECT
ENGINEER application requirements.
MAS
12/1/16
DATE: H. Metal Poles: Provide galvanized steel, tapered tubular seamless shaft poles, of
CERTIFIED
REZ sizes and types indicated, with 1/4" bearing plates and ground sleeves for direct
12/1/16
embedment. Provide removable step bolts 3/4" diameter and 6" long with threaded
DATE:
CONSTRUCTION
steel lugs welded to pole beginning 12" above finish grade. Space step bolts at 15"
AGENCY
AAG
intervals on alternative sides of pole continuing to the top. Provide pole with
adequately sized reinforced handhole complete with matching cover and located
12/1/16
DATE: on climbing side of pole, 18" above grade level. Weld 1/2" grounding nut on shaft
OPERATIONS
with accessibility from handhole. Design poles to withstand loads developed by
SMK
100 MPH wind pressure, as adjusted for height above ground level, structural
12/1/16
DATE: shapes and cable/wire loading. Construct poles whose total length is greater than
CONTROL NUMBER
I. Metal Pole Accessories: Provide accessories for metal poles, including crossarms,
DATE:
bolts, lifting eyes, and nuts as recommended by pole manufacturer, of sizes and
BY:
sizes and types indicated. Design poles to withstand loads developed by 100 MPH
28-00014-0002-0001
wind pressure, as adjusted for height above ground level, structural shapes and
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
psi. Fasten galvanized steel base plates to pole by using both the prestressing
and reinforcing steel to transfer load on pole to anchor bolts. Embed base plate in
MAS
MAS
concrete and cast as integral part of pole. Provide adequately sized cable
entrance holes and handholes, where indicated, and with matching plate to cover
above-ground access hole.
concrete poles, including anchor bolts and nuts, crossarms, climbing rungs, and
pole tops as recommended by pole manufacturer, of sizes and materials needed to
DESCRIPTION
PART 3 - EXECUTION
3.01 EXAMINATION
Examine areas and conditions under which pole and standard equipment and components
are to be installed, and substrate which will support equipment. Notify Contractor in
writing of conditions detrimental to proper completion of the Work. Do not proceed with
the Work until unsatisfactory conditions have been corrected in a manner acceptable to
JO/EWO
28-00014
28-00014
the Installer.
00F1 12/1/16
DATE
10/27/16
A. Install pole and standard units and products as indicated, in accordance with
NO.
REV
00
DISCIPLINE
manufacturer's written instructions, applicable requirements of SBC 401, the NEC,
ENGINEER NESC and NEMA Standards, and with recognized Industry practices to ensure that
ANP
12/1/16
roadway and parking area lighting equipment fulfill requirements.
DATE:
PROJECT
ENGINEER B. Utilize belt slings or rope (not chain or cable) to protect finishes when raising and
MAS
setting finished poles and standards.
12/1/16
DATE:
CERTIFIED
REZ C. Where poles and standards are indicated to be embedded in soil, set to depth
12/1/16 required for adequate structural support, but not less than minimum 5'-6" below
DATE:
CONSTRUCTION
finish grade.
AGENCY
AAG
12/1/16
D. Set poles and standards plumb. Support adequately during backfilling, or when
DATE:
OPERATIONS
anchoring them to the foundations.
SMK
12/1/16
E. Provide sufficient space encompassing hand access and cable entrance holes for
DATE:
installation of underground cabling where indicated.
CONTROL NUMBER
VERIFICATION
supports, including poles/standards; and ensure that installed fixtures are plumb
DATE:
and level.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
G. Tighten connectors and terminals, including screws and bolts, in accordance with
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
3.03 GROUNDING
MAS
MAS
Provide equipment grounding connections for poles and standard as indicated. Tighten
connections to comply with tightening torques specified in UL 486A to assure permanent
and effective grounding.
ISSUED FOR CONSTRUCTION
END OF SECTION
DESCRIPTION
JO/EWO
28-00014
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
PART 1 – GENERAL
MAS
MAS
The LSTK CONTRACTOR shall complete the shop drawings, coordination with
other disciplines, all permitting and drawing approvals in regular drawing
submissions to the client during Construction Phases, as well as completing
Construction of the facility.
ISSUED FOR CONSTRUCTION
1.2 SUMMARY
28-00014
intent of this Specification section that the work performed pursuant here to be
complete and acceptable in every respect for its intended purpose. It is further
required that the provisions of this Specification section shall be complementary to,
00F1 12/1/16
DATE
10/27/16
and shall be correlated with, the requirements of the Contract. Nothing in this
specification section shall limit the scope of work as required by the Contract.
NO.
REV
00
DISCIPLINE
ENGINEER
ANP 1.3 DESCRIPTION OF WORK
12/1/16
DATE:
PROJECT
ENGINEER
A. Extent of exterior lighting fixture work is indicated by drawings and schedules.
MAS
DATE:
12/1/16 B. Types of exterior lighting fixtures in this section include the following:
CERTIFIED
REZ
C. High-intensity-discharge (HID)
12/1/16
DATE:
CONSTRUCTION
AGENCY 1. High pressure sodium.
AAG
12/1/16
DATE:
OPERATIONS
2. Metal Halide
SMK
DATE:
12/1/16 3. LED
CONTROL NUMBER
VERIFICATION
D. Applications of exterior lighting fixtures required for this project include the
EDSD
following:
DATE:
BY:
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
experience on projects with exterior lighting fixture work similar to that required for
project.
DESCRIPTION
28-00014
3. IES Compliance: Comply with IES RP-8, 19, 20 and PB-15 pertaining to
00F1 12/1/16
DATE
10/27/16
00
DISCIPLINE
486A and B, pertaining to exterior lighting fixtures. Provide exterior lighting
ENGINEER fixtures and components which are UL-listed and labeled.
ANP
12/1/16
DATE:
PROJECT
5. NFPA Compliance: Comply with applicable requirements of NFPA 78,
ENGINEER "Lightning Protection Code," pertaining to installation of exterior lighting
MAS
fixtures.
12/1/16
DATE:
CERTIFIED
REZ 1.5 SUBMITTALS
12/1/16
DATE:
CONSTRUCTION
A. Product Data: Submit manufacturer's product data and installation instructions on
AGENCY
AAG
each type exterior building lighting fixture and component.
12/1/16
DATE:
OPERATIONS
B. Shop Drawings: Submit fixture shop drawings in booklet form with separate sheet
SMK
for each fixture, assembled in "luminaire type" alphabetical or numerical order, with
12/1/16
proposed fixture and accessories clearly indicated on each sheet.
DATE:
CONTROL NUMBER
VERIFICATION
C. Wiring Diagrams: Submit wiring diagrams for exterior lighting fixtures showing
connections to electrical power panels, switches, dimmers, controllers, and
EDSD
D. Samples: Submit one complete operating unit for each type of exterior lighting
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
fixture specified.
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
from the arrangement of light sources from indicated fixture locations and heights.
Show on the graphic plots the locations, spacings and heights of luminaries.
MAS
MAS
B. Store exterior lighting fixtures in original wrappings in a clean dry place. Protect
DESCRIPTION
C. Handle exterior lighting fixtures carefully to prevent damage, breaking, and scoring.
Do not install damaged fixtures or components; remove units from site and replace
with new.
1.7 SEQUENCING AND SCHEDULING
A. Coordinate with other electrical work including wires/cables, electrical boxes and
fittings, and raceways, to properly interface installation of exterior lighting fixtures
with other work.
JO/EWO
28-00014
28-00014
1.8 MAINTENANCE
NO.
REV
00
DISCIPLINE
ENGINEER A. Maintenance Data: Submit maintenance data and parts list for each exterior
ANP
lighting fixture and accessory; including "trouble- shooting" maintenance guide.
12/1/16
DATE: Include that data, product data, and shop drawings in a maintenance manual; in
PROJECT
ENGINEER accordance with requirements of Division 1.
MAS
12/1/16
DATE: B. Extra Stock:
CERTIFIED
REZ
12/1/16
Furnish stock or replacement lamps amounting to 15 percent (but not less than one
DATE:
CONSTRUCTION
lamp in each case) of each type and size lamp used in each type fixture. Deliver
AGENCY
AAG
replacement stock as directed to SAUDI ARAMCO storage space, and obtain
12/1/16
receipt.
DATE:
OPERATIONS
SMK
PART 2 - PRODUCTS
12/1/16
DATE: 2.01 MANUFACTURERS
CONTROL NUMBER
VERIFICATION
offering products which may be incorporated in the work include, but are not limited
DATE:
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REZ AAG
ENGG CERT
REZ
2. High-Intensity Ballasts:
28-00014
A. General: Provide lighting fixtures, of sizes, types and ratings indicated; complete
with, but not limited to, housings, energy efficient ballasts, starters and wiring.
NO.
REV
00
DISCIPLINE
ENGINEER B. Wiring: Provide electrical wiring within fixtures which are suitable for connection to
ANP
12/1/16
branch circuit wiring as follows:
DATE:
PROJECT
ENGINEER 1. NEC Type AF for 230-volts, minimum No. 18 AWG.
MAS
12/1/16
DATE: C. High-Intensity-Discharge Lamp Ballasts: Provide HID lamp ballasts, capable of
CERTIFIED
REZ operating lamp types and ratings indicated; reactor type, high power-factor, core
12/1/16
and coil assembly encapsulated in non-melt resin; install capacitor outside ballast
DATE:
CONSTRUCTION
encapsulation for easy field replacement.
AGENCY
AAG
12/1/16
D. Lamps:
DATE:
OPERATIONS
SMK
1. Provide high pressure sodium lamps in wattages indicated.
12/1/16
DATE: 2. Provide metal halide lamps in wattages indicated.
CONTROL NUMBER
VERIFICATION
PART 3 - EXECUTION
EDSD
DATE:
3.01 EXAMINATION
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Examine areas and conditions under which lighting fixtures are to be installed, and
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
conditions detrimental to proper completion of the Work. Do not proceed with the
Work until unsatisfactory conditions have been corrected in a manner acceptable to
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
Installer.
REZ
ENGG CERT
REZ
B. Tighten connectors and terminals, including screws and bolts, in accordance with
DESCRIPTION
3.03 GROUNDING
JO/EWO
28-00014
28-00014
00
12/1/16
DATE: A. Aim adjustable lighting fixtures and lamps in night test of system. Verify that
CONTROL NUMBER
3.06 DEMONSTRATION
(DCC) NO. _____________________
28-00014-0002-0001
SMK
SAUDI ARABIAN OIL COMPANY
AAG SMK
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AAG
REZ
END OF SECTION
ISSUED FOR CONSTRUCTION
28-00014
00F1 12/1/16
DATE
10/27/16
NO.
REV
00
DISCIPLINE
ENGINEER
ANP
12/1/16
DATE:
PROJECT
ENGINEER
MAS
12/1/16
DATE:
CERTIFIED
REZ
12/1/16
DATE:
CONSTRUCTION
AGENCY
AAG
12/1/16
DATE:
OPERATIONS
SMK
12/1/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
00F1
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.