Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

2 3 0

0 0
1 2100 1 000 2 1 0

0 0 1 00 1 00 0 0 0 0 1 000
1 000 1 000 1 000 2 000 2 000 2 000 2 000 2 000 2 000 000 0000 000 2 00 2 00 2 00 2 00 2 00 2 00 2 00 2 00 1 000 1 000

P9
P10 ℄. of Bridge P11 P12 P13
P8 P14
P5 P6 P7 Deck Top RL.20.355 m. P15 P16
P3 P4 P17
P1 P2 P18 P19
A1 Deck Top Deck Top Deck Top Deck Top P20 P21 P22
RL.19.567m. RL.20.012m. RL.20.012m. RL.19.567m. A2
Deck Top Deck Top
Deck Top Deck Top Deck Top Deck Top Deck Top Deck Top Deck Top Deck Top
Deck Top Deck Top Deck Top Deck Top Deck Top Deck Top RL.18.938m. RL.18.938m. Deck Top Deck Top Deck Top
RL.14.618m. RL.17.498m. RL.18.203m. RL.17.468m. RL.16.733m. RL.15.998m. RL.15.263m. RL.13.793m.
Deck Top RL.13.658m. RL.14.138m. RL.15.338m. RL.16.058m. RL.16.778m. RL.18.218m. RL.14.528m. RL.13.058m. RL.12.578m. Deck Top Deck Top
RL.13.178m. 3.0% Parabolic Slope RL.12.098m. RL.11.618m.

DHAKA SIDE 3.0% Parabolic Slope 3.0% Parabolic Slope RUPGONJ SIDE
3.0%Straight Slope 3.0%Straight Slope
200mmØ Guard Post 3.0%Straight Slope
3.0%Straight Slope 200mmØ Guard Post
3 S ra S 200
a r a R a RE a RL.18.505m. RL.18.505m. 3 S ra S 200
RL=16.904m RL=18.426m RL.19.05m. RL=18.426m RL=16.904m
RL=17.352m RL=17.352m a r a R a RE a
RL=15.434m
T2a T2a T2
RL=16.184m
T2d T2c T2c T2b
F4c F4b F4b F4a F4 FL4

RL=15.464m
T2 F4d F4d

F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
FR4
RL=13.863m RL=14.024m RL=14.744m RL=16.169m RL=14.699m RL=13.964m
T2 T2a T2a T2b T2c T2c T2d
F4 F4 F4 F4 F4 F4 F4 F4 RL=12.423m RL=13.304m RL=13.229m RL=12.494m RL=12.303m
FL4
F4
F4
F4
F4a
F4
F4b
F4
F4b
F4
F4c
F4
F4d
F4
F4d
F4
T2
F4 F4 F4 F4 F4 F4 F4 F4 FR4

RL=12.903m RL=11.759m RL=10.863m FR4 F4 F4 F4 F4 F4 F4 F4 F4

SHWL.=6.75m.
F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4
F4 F4 F4 F4 F4 F4 F4 F4 FR4
RL=13.383m RL=12.584m RL=11.823m RL=11.343m
FR4 F4 F4 F4 F4 F4 F4 F4 F4
B2 B2 B2 B2 B2 B2 B2 B2 B2
RL=11.024m FR4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4
F4

RL=6.178m L.W.L.= 0.58 R n r Ear R a n


R n r Ear R a n
RL=3.0m RL=5.618m S ru ur O a na S a
S ru ur O a na S a RL=3.0m RL=3.0m RL=3.0m RL=3.0m RL=3.0m RL=3.0m
RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=1.0m RL=3.0m RL=3.0m RL=3.0m Pr a C n r Pan
Pr a C n r Pan
9 Nos 8.00m. Long 9 Nos 8.00m. Long
C a San F n FM 0. n. C a San F n FM 0. n.
1200mm dia 10mm thick RL=(-)1.50m RL=(-)1.50m 1200mm dia 10mm thick
n1 0 n Lay r y Lay r n1 0 n Lay r y Lay r
permanent steel casing permanent steel casing
C a n S an ar Pr r 10Nos. 27.0m 08Nos. 22.50m C a n S an ar Pr r
12 Nos 10.00m. Long
T an y ar n r Long 1000mm Long 1000mm
06Nos. 35.0m 06Nos. 35.0m 1200mm dia 10mm thick 06Nos. 35.0m 06Nos. 35.0m
an a an a y dia RCC Cast-in permanent steel casing dia RCC Cast-in
Long1000mm Long1000mm 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 09Nos. 40.0m Long 09Nos. 40.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long 06Nos. 35.0m Long Long1000mm Long1000mm
r r n ay r n r an 1 0 u .0 PWD RL -Situ Bored Piles -Situ Bored Piles
dia RCC Cast-in dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1200mm dia RCC Cast-in 1200mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in 1000mm dia RCC Cast-in dia RCC Cast-in dia RCC Cast-in
-Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles -Situ Bored Piles

12Nos. 50.0m Long 1200mm


RL=(-)20.672m dia RCC Cast-in-Situ Bored Piles RL=(-)16.732m
RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m RL=(-)31.85m
RL=(-)33.85m RL=(-)33.85m RL=(-)33.85m RL=(-)33.85m RL=(-)33.85m RL=(-)33.85m RL=(-)33.85m RL=(-)33.85m
RL=(-)38.85m RL=(-)38.85m
RL=(-)51.35m RL=(-)51.35m

-0.214
-0.652
-0.886
-1.258
-1.658
-1.986
-2.145
-2.325
-2.658
-2.986
-3.214
-3.558
-3.865
-3.685
-3.455
-2.865
-2.665
-2.445
-2.136
-1.865
-1.658
-1.332
-0.658
2.169

2.635

4.012

499.50 4.085

4.867

548.50 5.263

5.263

5.106

4.996

5.463

5.463

5.463

5.463

5.109
2.036

2.036

2.635

2.635

5.911

4.269

2.857
2.269
1.778
1.369
0.658

0.458
0.865
1.658
2.554
2.812

1.054

Elevation
Distance

475.0

524.0

573.0

597.0
120.0

144.0

168.0

192.0

216.0

264.0
267.0
300.0
303.0
306.0
309.0
312.0
315.0
318.0
321.0
324.0
327.0
330.0
333.0
336.0
339.0
342.0
345.0
348.0
351.0
354.0
357.0
400.0
403.0
406.0
409.0
412.0
415.0
418.0
421.0
424.0
427.0
16.0

32.0

72.0

96.0
3.0 0.0

00

00

00

00

00

00
DH
AK
AS
IDE

.0 0 00
GENERAL ELEVATION PART

3 S ra S 200 0 GENERAL ELEVATION CONTINUE


a r a R a RE a
A1 2000
3.0

P1
1 0

000 0000 000


T an y ar n r P2 0 000 3 00
1 00
00

12000
R 1

an a an a y
2 000 0 1 00
r r n ay r n r an 1 0 u .0 PWD RL P3 0 2 00
0
P4
0
R 1 1

R414160

P5
P6 P7 000
P8 P9 P12
P10 P11 P13

2
GENERAL PLAN PART P14
P15

R2
P16 0
000
GENERAL PLAN CONTINUE P17
NOTE:
P18 0
Vertical Clearance = 12.20m
000
Horizontal Clearance = 90.0m
Center Arch Span of Bridge (48X2+90) = 186m (Arch)
P19
RCC (24.0mX6+24.50x8) = 340.00m (RCC Girder)
Span of Slab (16x6 nos) = 96.00m (RCC Girder) P20
Total Length = 622.00m+Total Exp. Gap 3.350m = 625.350m
P21
P22
A2 RUP
GON
J SID
E
3
S ra
a
r a S
R a 200
R E
a

GOVERNMENT OF THE PEOPLE'S REPUBLIC OF BANGLADESH NAME OF SCHEME: CONSTRUCTION OF 625.350M LONG BRIDGE OVER BALU RIVER ON DEMRA-KAMSHIRE CONSTRUCTION OF IMPORTANT BRIDGES DESIGNED BY: CHECKED BY : APPROVED BY :
SHEET NO : S-06
ROAD ON KEODHALA-KAYETPARA NADIRGHAT ROAD AT CH: 290M UNDER (ROAD ID: 367685042). ON RURAL ROADS (CIBRR 1st REVISED),
LOCAL GOVERNMENT ENGINEERING DEPARTMENT
LGED BHABAN, (LEVEL-9)
AGARGAON, SHER-E-BANGLA NAGAR.
DRAWN BY : PARVIN AKTER
PROJECT NAME: UPAZILA : RUPGANJ DISTRICT: NARAYANGANJ DHAKA-1207. MD. MOSTADAR RAHMAN CIBRR LGED H/Q, DHAKA
CONSTRUCTION OF IMPORTANT BRIDGES ON RURAL ROADS E-mail : pd.cibrr@lged.gov.bd Bridge Engineer (PC & Steel) Executive Engineer, (Bridge Design) Superintending Engineer (Bridge Design)
DRAWING TITLE: GENERAL PLAN & ELEVATION LGED HQ, Dhaka. DATE : JANUARY- 2023
(CIBRR 1st REVISED) CIBRR, Design Unit, LGED HQ, Dhaka Design Unit, LGED HQ, Dhaka
D:\Parvin Akter\CIBRR\Mostader Sir\625.350m Bridgr Balu_River_Rupganj_Narayanganj\REVISED -02- 625.350m Bridgr Balu_River_Rupganj_Narayanganj -20.01.2023\5-9.plan_elevation Rupgon 15.09.22.dwg_Plot Date: 1/25/2023 9:55 AM

You might also like