Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

100

Millimetres
10

Y 2260
0

230 230
830 600 600
R

230
230

2480
2710

2710

2710
D.A.TOILET
1800X2250 TERRACE

X X

230
UP TERRACE

RAMP
900 Y 900
230 230
2260

PLAN

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning
PROPOSED CONSTRUCTION OF DIFFERENTLY ABLED
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION TOILET BLOCK AT VARIOUS GOVT. COLLEGE,
· Dimensions are in inches except otherwise. LIMITED MEERUT, U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before DA TOILET
SRENGISE
execution. GROUND FLOOR WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Ph - 7903561304,9565077981
Revision:
Designed: Checked: Designed: Checked: Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- BHAVNA Vaibhav WD_R00_UPPCL_DA TOILET_UP15_AR_02061 R00
100

300
Millimetres

+ 3000
10
0

2550
3000
+ 450

± 0.00

450
ELEVATION

300

300
+ 3000 + 3000

2550

2550
3000

3000
+ 450 + 450

± 0.00 ± 0.00
450

450
SECTION-YY

SECTION-XX SECTION-YY

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning
PROPOSED CONSTRUCTION OF DIFFERENTLY ABLED
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION TOILET BLOCK AT VARIOUS GOVT. COLLEGE,
· Dimensions are in inches except otherwise. LIMITED MEERUT, U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before DA TOILET
SRENGISE
execution. ELEVATION & SECTION WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Ph - 7903561304,9565077981
Revision:
Designed: Checked: Designed: Checked: Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- BHAVNA Vaibhav WD_R00_UPPCL_DA TOILET_UP15_AR_03061 R00
PROJECT
1 PROPOSED STRUCTURE FOR DIFFERENTLY
ABLED TOILET BLOCK AT VARIOUS
COLLEGE, MEERUT, U.P.
Notes:-
[General]
[1] All dimensions are in m.m. unless otherwise mentioned.
[2] Only figured dimensions are to be followed neither the bars shall be counted nor the
dimensions scaled from the drg.
[3] Any discrepancy in the drgs. shall be brought to the notice of the architect / consultant and

1 clarification obtained in writing prior to execution of work.


[4] High yield strength deformed bars of yield stress 500 n/mm² (fe-500) which shall conform
to1786-1985 shall be used as reinforcement
[5] Clear cover of main reinf. shall be as follows. (a) footing = 50 mm (b) column = 40 mm (c) beam = 25
mm (top & bottom) or dia of bar whichever is more (d) slab = 20 mm (e) waist slab = 25 mm
[6] End/side cover of all reinforcement in beams & slab = 25 mm. or dia of bar whichever is more

1 1 1 1 [7] The cover block of cement mortar shall be used to ensure the reqd. cover of reinforcement
[8] Development length ( Ld ) for different dia meter of bars for conc. mix of grade M - 20 shall
be = 56 x dia of bar
[9] Conc. mix for r.c.c. work shall be of grade M - 25 conforming to I.S. 456 - 2000.
[10] Necessary fixture for electrical, plumbing, etc. shall be provided in slab, beams before
230 execution as per relevant drgs.
[11] The structure has been designed for G.F.+ 1 = 2 storey

2
[12] P.C.C.(1:4:8) shall be provided.
[13] All plain concrete & rcc shall be strictly in accordance with the provision of IS - 456:2000.
[14] Cutting,bending,fixing & placing of bars shall be in accordance with IS - 2502:1968,

150 150 150


1000
IS - 5525:1969 & IS - 456:2000
345
[Foundation]
460 [1] The layout of building shall be given from the arch. drg.
[2] The design data for foundation has been taken from soil test report provided by the client
[3] Earth below foundation shall be properly rammed & consolidated before laying lean concrete.
575
[Columns]
[1] Ties in portion of col. & beam junction shall be same as end zone.
[2] The spacing of ties at overlaps should not exceed 100 mm. c/c
[3] Over laps are allowed only at middle zone of the columns.
[4] Not more than 50 % of bars shall be lapped at a section and laps shall be staggered.

2 725 [5] Ties in portion of col. below tie beam shall be same as end zone .

2 2 2 2 [6] Vertical bars of rcc column at top slab shall be extended upto top of beam & bent into beam
by development length.

SEC. AT 1-1 [Beams]


[1] For location of beams refer slab plan.
[2] The spacing of stirrups at overlaps should not exceed 100 mm. c/c
[3] Where two layers of reinf. bars are to be provided, spacer bar are to be provided at spacing of
1000 mm. max. and the dia of the spacer bar shall be higher of dia of longitudinal bars or 25 mm.
[4] Max. 3 nos. of bars shall be provided in a layer of 230 mm wide beam.
[5] At the junction of two diff. number of beams the higher reinf. at the support shall be adopted.
[6] Over lap in top bars shall be near mid span & in bottom bars shall be near support or at support.
P.LVL. [7] The depth of beam monolithic with slab as specified in schedule shall be inclusive of slab

2#10 thickness unless otherwise specified.


[8] Hooks in stirrups of beams shall be bent inside at 135° & length of hooks shall be
10 x dia of bar of stirrups
[Slabs]
2 2 #8@200
[1]
[2]
[3]
For slab reinforcement refer table-4 (detail of slab reinforcement).
Alternate bottom bars shall be curtailed at l / 7 of span as shown in typ. section of slab.
Extra bars shall be provided at top face as shown in typ. section of slab.
[4] The cross reinf./temp. reinf. below top reinf of slab .i.e.#8@300c/c is to be provided just

150
below the main top steel as shown in typ. sec.of slab.

EXCAVATION PLAN OF FOOTINGS 2#10


[5] The first main bar of slab shall be placed at 80 mm. or half the spacing specified
whichever is less from the face of support

[Masonry work]
G.LVL. [1] 115 th.(1/2 brick) wall -1:4 cement: sand mortar shall be used & #8,1 nos. bars at every 4th course
shall be provided

P.LVL. 75MM P.C.C


[2] 230 th.(1 brick) wall - 1:6 cement: sand mortar shall be used.
[3] The vertical face of concrete at junction of wall & rcc member shall be raked to give a rough surface
& 1:4 cement:sand mortar should be applied to developed bond between brick & rcc member.

230 REVISION
References : IS 456 - 2000, IS - 13920 - 2016, IS - 1893 part (1) : 2016, SP-16 , SP-34
arch. drg. no. - all arch. drgs

G.LVL. S.N. DATE DESCRIPTIONS INITIAL

750

150 150 150


345 DRG. TITLE:
STRUCTURE OF DA TOILET
460 CONSTRUCTION AGENCY :

230
L.C.
600 ARCHITECT CONSULTANTS:

DETAIL OF RAMP
345

5D
architecture
interior
planning

5 Designers
ARCHITECTURE,INTERIOR & PLANNING

SEC. AT 2-2 C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.


Ph - 9565.77981, 7903561304
SRENGISE

Table-2, Details of Slab Reinforcement Drawn By

Table-2, Details of Slab Reinforcement Design Team Er. Vineet Kr. Singh

Principal Consultant Er. Pragya Patel


Slab Depth (mm)

B.Tech (Civil) M.Tech (Structures)

REINFORCEMENT Dated Scale


Apr. - 2022 N.T.S.
Sheet No.
Slab No.

DRG. NO.
ST-02 (SIGNATURE & STAMP OF CONSULTANT)
Sr. No.

Parallel to Shorter Span (Main bars) Parallel to Longer Span (Cross bars) STRUCTURAL CONSULTANTS Er. Pragya Patel
B.Tech (Civil) M.Tech (Structures)

At Bottom face At Top face At Bottom face At Top face


(Mid Span) (Extra bars at support) (Mid Span) (Extra bars at support) CRS CRS ENGINEERS
ROOP PLAZA BUILDING
SHEIKHPURA KASAILA, GOMTI NAGAR

1 S1 125 #8@150c/c #8@150c/c #8@200c/c #8@200c/c LUCKNOW -FAIZABAD ROAD, LUCKNOW


PROJECT

PB1
PROPOSED STRUCTURE FOR DIFFERENTLY
ABLED TOILET BLOCK AT VARIOUS

LB1 Notes:-
[General]
COLLEGE, MEERUT, U.P.

[1] All dimensions are in m.m. unless otherwise mentioned.


[2] Only figured dimensions are to be followed neither the bars shall be counted nor the
dimensions scaled from the drg.
[3] Any discrepancy in the drgs. shall be brought to the notice of the architect / consultant and
clarification obtained in writing prior to execution of work.
[4] High yield strength deformed bars of yield stress 500 n/mm² (fe-500) which shall conform
to1786-1985 shall be used as reinforcement
[5] Clear cover of main reinf. shall be as follows. (a) footing = 50 mm (b) column = 40 mm (c) beam = 25
mm (top & bottom) or dia of bar whichever is more (d) slab = 20 mm (e) waist slab = 25 mm
[6] End/side cover of all reinforcement in beams & slab = 25 mm. or dia of bar whichever is more

LB1= PLINTH BAND LB1= LINTEL BAND [7] The cover block of cement mortar shall be used to ensure the reqd. cover of reinforcement

LB1
[8] Development length ( Ld ) for different dia meter of bars for conc. mix of grade M - 20 shall
be = 56 x dia of bar
[9] Conc. mix for r.c.c. work shall be of grade M - 25 conforming to I.S. 456 - 2000.

AS 230X150 WITH AS 230X150 WITH [10] Necessary fixture for electrical, plumbing, etc. shall be provided in slab, beams before

LB1
execution as per relevant drgs.

S1
[11] The structure has been designed for G.F.+ 1 = 2 storey
[12] P.C.C.(1:4:8) shall be provided.

2-12Ø AT TOP AND 2-10Ø AT TOP AND [13] All plain concrete & rcc shall be strictly in accordance with the provision of IS - 456:2000.
[14] Cutting,bending,fixing & placing of bars shall be in accordance with IS - 2502:1968,
IS - 5525:1969 & IS - 456:2000

BOTTOM AND RING BOTTOM AND RING [Foundation]


[1] The layout of building shall be given from the arch. drg.
[2] The design data for foundation has been taken from soil test report provided by the client

AS 8Ø@200MMC/C
[3] Earth below foundation shall be properly rammed & consolidated before laying lean concrete.

PB1
PB1

AS 8Ø@200MMC/C [Columns]
[1] Ties in portion of col. & beam junction shall be same as end zone.
[2] The spacing of ties at overlaps should not exceed 100 mm. c/c
[3] Over laps are allowed only at middle zone of the columns.
[4] Not more than 50 % of bars shall be lapped at a section and laps shall be staggered.
[5] Ties in portion of col. below tie beam shall be same as end zone .
[6] Vertical bars of rcc column at top slab shall be extended upto top of beam & bent into beam
by development length.

[Beams]
[1] For location of beams refer slab plan.
[2] The spacing of stirrups at overlaps should not exceed 100 mm. c/c
[3] Where two layers of reinf. bars are to be provided, spacer bar are to be provided at spacing of

LB1
1000 mm. max. and the dia of the spacer bar shall be higher of dia of longitudinal bars or 25 mm.
[4] Max. 3 nos. of bars shall be provided in a layer of 230 mm wide beam.
[5] At the junction of two diff. number of beams the higher reinf. at the support shall be adopted.
[6] Over lap in top bars shall be near mid span & in bottom bars shall be near support or at support.

PB1
[7] The depth of beam monolithic with slab as specified in schedule shall be inclusive of slab
thickness unless otherwise specified.
[8] Hooks in stirrups of beams shall be bent inside at 135° & length of hooks shall be
10 x dia of bar of stirrups
[Slabs]
[1] For slab reinforcement refer table-4 (detail of slab reinforcement).

DETAIL OF LINTEL BAND DETAIL OF SLAB


[2]
[3]
[4]
Alternate bottom bars shall be curtailed at l / 7 of span as shown in typ. section of slab.
Extra bars shall be provided at top face as shown in typ. section of slab.
The cross reinf./temp. reinf. below top reinf of slab .i.e.#8@300c/c is to be provided just
below the main top steel as shown in typ. sec.of slab.
[5] The first main bar of slab shall be placed at 80 mm. or half the spacing specified
whichever is less from the face of support

[Masonry work]

75 [1] 115 th.(1/2 brick) wall -1:4 cement: sand mortar shall be used & #8,1 nos. bars at every 4th course
shall be provided
[2] 230 th.(1 brick) wall - 1:6 cement: sand mortar shall be used.
[3] The vertical face of concrete at junction of wall & rcc member shall be raked to give a rough surface
& 1:4 cement:sand mortar should be applied to developed bond between brick & rcc member.

G. LVL. REVISION
References : IS 456 - 2000, IS - 13920 - 2016, IS - 1893 part (1) : 2016, SP-16 , SP-34
arch. drg. no. - all arch. drgs

S.N. DATE DESCRIPTIONS INITIAL

DRG. TITLE:
STRUCTURE OF DA TOILET

PB1 CONSTRUCTION AGENCY :


150
ARCHITECT CONSULTANTS:

5D
architecture

DETAIL OF STEPS
interior
planning

5 Designers
DETAIL OF PLINTH BAND ARCHITECTURE,INTERIOR & PLANNING
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
Ph - 9565.77981, 7903561304
SRENGISE

Drawn By

Table-2, Details of Slab Reinforcement Design Team Er. Vineet Kr. Singh

Principal Consultant Er. Pragya Patel


Slab Depth (mm)

B.Tech (Civil) M.Tech (Structures)

REINFORCEMENT Dated Scale


Apr. - 2022 N.T.S.
Sheet No.
Slab No.

DRG. NO.
ST-02 (SIGNATURE & STAMP OF CONSULTANT)
Sr. No.

Parallel to Shorter Span (Main bars) Parallel to Longer Span (Cross bars) STRUCTURAL CONSULTANTS Er. Pragya Patel
B.Tech (Civil) M.Tech (Structures)

At Bottom face At Top face At Bottom face At Top face


(Mid Span) (Extra bars at support) (Mid Span) (Extra bars at support) CRS CRS ENGINEERS
ROOP PLAZA BUILDING
SHEIKHPURA KASAILA, GOMTI NAGAR

1 S1 125 #8@150c/c #8@150c/c #8@200c/c #8@200c/c LUCKNOW -FAIZABAD ROAD, LUCKNOW