100

1860 GIRLS URINAL


BLOCK
Millimetres

230 230
1400 1400X1000

230
230
10
0

250
1000
X X

750
1000 WD

115
115
VER.
2575

2575
UP

750
+450
1000

250
230

230
ST - 1
600 WD.
PROJECTION

1400
230 230
1860
PLAN

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning PROPOSED CONSTRUCTION OF GIRLS URINAL
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION BLOCK AT VARIOUS GOVT. COLLEGE,
· Dimensions are in inches except otherwise. LIMITED
MEERUT, U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before GIRLS URINAL BLOCK
SRENGISE
execution. FROUND FLOOR WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Designed: Checked: Designed:
Ph - 7903561304,9565077981
Checked: Revision:
Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- Bhavna Vaibhav WD_R00_UPPCL_GUB_UP15_AR_02081 R00
100
Millimetres
10
0

TERRACE

TERRACE

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning PROPOSED CONSTRUCTION OF GIRLS URINAL
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION BLOCK AT VARIOUS GOVT. COLLEGE,
· Dimensions are in inches except otherwise. LIMITED
MEERUT, U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before GIRLS URINAL BLOCK
SRENGISE
execution. TERRACE WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Designed: Checked: Designed:
Ph - 7903561304,9565077981
Checked: Revision:
Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- Bhavna Vaibhav WD_R00_UPPCL_GUB_UP15_AR_02082 R00
100
Millimetres

300
10

+ 3000
0

2550
3000
+ 450

± 0.00

450
ELEVATION

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning PROPOSED CONSTRUCTION OF GIRLS URINAL
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION BLOCK AT VARIOUS GOVT. COLLEGE,
· Dimensions are in inches except otherwise. LIMITED
MEERUT, U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before GIRLS URINAL BLOCK
SRENGISE
execution. ELEVATION WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Designed: Checked: Designed:
Ph - 7903561304,9565077981
Checked: Revision:
Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- Bhavna Vaibhav WD_R00_UPPCL_GUB_UP15_AR_03081 R00
100
Millimetres

300
10

+ 3000
0

2550
3000
+ 450

± 0.00

450
SECTION-XX

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning PROPOSED CONSTRUCTION OF GIRLS URINAL
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION BLOCK AT VARIOUS GOVT. COLLEGE,
· Dimensions are in inches except otherwise. LIMITED
MEERUT, U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before GIRLS URINAL BLOCK
SRENGISE
execution. SECTION WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Designed: Checked: Designed:
Ph - 7903561304,9565077981
Checked: Revision:
Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- Bhavna Vaibhav WD_R00_UPPCL_GUB_UP15_AR_04081 R00
PROJECT
1 1 PROPOSED STRUCTURE FOR GIRLS
URINAL BLOCK AT VARIOUS GOVT.
COLLEGE,MEERUT, U.P.
Notes:-
PB1 LB1 [General]
[1] All dimensions are in m.m. unless otherwise mentioned.
[2] Only figured dimensions are to be followed neither the bars shall be counted nor the
dimensions scaled from the drg.
[3] Any discrepancy in the drgs. shall be brought to the notice of the architect / consultant and

1 1
clarification obtained in writing prior to execution of work.
[4] High yield strength deformed bars of yield stress 500 n/mm² (fe-500) which shall conform
to1786-1985 shall be used as reinforcement
[5] Clear cover of main reinf. shall be as follows. (a) footing = 50 mm (b) column = 40 mm (c) beam = 25

1 1 mm (top & bottom) or dia of bar whichever is more (d) slab = 20 mm (e) waist slab = 25 mm
[6] End/side cover of all reinforcement in beams & slab = 25 mm. or dia of bar whichever is more
[7] The cover block of cement mortar shall be used to ensure the reqd. cover of reinforcement
[8] Development length ( Ld ) for different dia meter of bars for conc. mix of grade M - 20 shall
be = 56 x dia of bar
[9] Conc. mix for r.c.c. work shall be of grade M - 25 conforming to I.S. 456 - 2000.

PB1

PB1

PB1

LB1

LB1
[10] Necessary fixture for electrical, plumbing, etc. shall be provided in slab, beams before

1 1 PB1 LB1
execution as per relevant drgs.
[11] The structure has been designed for G.F.+ 1 = 2 storey
[12] P.C.C.(1:4:8) shall be provided.
[13] All plain concrete & rcc shall be strictly in accordance with the provision of IS - 456:2000.
[14] Cutting,bending,fixing & placing of bars shall be in accordance with IS - 2502:1968,
IS - 5525:1969 & IS - 456:2000
PB1=PLINTH BAND PB1=LINTEL BAND

1 1 AS 230X150 WITH AS 230X150 WITH


[Foundation]
[1] The layout of building shall be given from the arch. drg.

1 1 2-10Ø AT TOP AND


BOTTOM AND RING
AS 8Ø@200MMC/C
2-10Ø AT TOP AND
BOTTOM AND RING
AS 8Ø@200MMC/C
[2] The design data for foundation has been taken from soil test report provided by the client
[3] Earth below foundation shall be properly rammed & consolidated before laying lean concrete.

[Columns]
[1] Ties in portion of col. & beam junction shall be same as end zone.
[2] The spacing of ties at overlaps should not exceed 100 mm. c/c
[3] Over laps are allowed only at middle zone of the columns.
[4] Not more than 50 % of bars shall be lapped at a section and laps shall be staggered.

PB1 LB1 [5] Ties in portion of col. below tie beam shall be same as end zone .
[6] Vertical bars of rcc column at top slab shall be extended upto top of beam & bent into beam
by development length.

[Beams]
[1] For location of beams refer slab plan.

1 1 DETAIL OF PLINTH BAND DETAIL OF TOP BAND [2] The spacing of stirrups at overlaps should not exceed 100 mm. c/c
[3] Where two layers of reinf. bars are to be provided, spacer bar are to be provided at spacing of
1000 mm. max. and the dia of the spacer bar shall be higher of dia of longitudinal bars or 25 mm.
[4] Max. 3 nos. of bars shall be provided in a layer of 230 mm wide beam.

EXCAVATION PLAN OF FOOTINGS [5] At the junction of two diff. number of beams the higher reinf. at the support shall be adopted.
[6] Over lap in top bars shall be near mid span & in bottom bars shall be near support or at support.
[7] The depth of beam monolithic with slab as specified in schedule shall be inclusive of slab
thickness unless otherwise specified.
[8] Hooks in stirrups of beams shall be bent inside at 135° & length of hooks shall be
10 x dia of bar of stirrups
[Slabs]
P.LVL.
2#10 [1]
[2]
[3]
For slab reinforcement refer table-4 (detail of slab reinforcement).
Alternate bottom bars shall be curtailed at l / 7 of span as shown in typ. section of slab.
Extra bars shall be provided at top face as shown in typ. section of slab.
[4] The cross reinf./temp. reinf. below top reinf of slab .i.e.#8@300c/c is to be provided just
below the main top steel as shown in typ. sec.of slab.

#8@200 [5] The first main bar of slab shall be placed at 80 mm. or half the spacing specified
whichever is less from the face of support

150 [Masonry work]


[1] 115 th.(1/2 brick) wall -1:4 cement: sand mortar shall be used & #8,1 nos. bars at every 4th course
2#10 shall be provided
[2] 230 th.(1 brick) wall - 1:6 cement: sand mortar shall be used.

G.LVL. 900 [3] The vertical face of concrete at junction of wall & rcc member shall be raked to give a rough surface
& 1:4 cement:sand mortar should be applied to developed bond between brick & rcc member.

75 S1
REVISION
References : IS 456 - 2000, IS - 13920 - 2016, IS - 1893 part (1) : 2016, SP-16 , SP-34
arch. drg. no. - all arch. drgs

G. LVL. 230 S.N.

DRG. TITLE:
DATE DESCRIPTIONS INITIAL

STRUCTURE OF GIRLS URINAL BLOCK


750

150 150 150


345 CONSTRUCTION AGENCY :

460
150

ARCHITECT CONSULTANTS:

5D
architecture

L.C.
interior

DETAIL OF STEPS 5 Designers


planning

600 ARCHITECTURE,INTERIOR & PLANNING


C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
Ph - 9565.77981, 7903561304
SRENGISE

SEC. AT 1-1 DETAIL OF SLAB Drawn By

Table-2, Details of Slab Reinforcement Design Team

Principal Consultant
Er. Vineet Kr. Singh

Er. Pragya Patel


B.Tech (Civil) M.Tech (Structures)
Slab Depth (mm)

Dated Scale
REINFORCEMENT DRG. NO.
Apr. - 2022 N.T.S.
Sheet No.

ST-02 (SIGNATURE & STAMP OF CONSULTANT)


Slab No.
Sr. No.

Parallel to Shorter Span (Main bars) Parallel to Longer Span (Cross bars) STRUCTURAL CONSULTANTS Er. Pragya Patel
B.Tech (Civil) M.Tech (Structures)

At Bottom face At Top face At Bottom face At Top face CRS ENGINEERS
CRS
(Mid Span) (Extra bars at support) (Mid Span) (Extra bars at support) ROOP PLAZA BUILDING
SHEIKHPURA KASAILA, GOMTI NAGAR
LUCKNOW -FAIZABAD ROAD, LUCKNOW

1 S1 125 #8@150c/c #8@150c/c #8@200c/c #8@200c/c