Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 21

raw data arranged x frequency p(x) p(X)*x s.d s.

d
663 569 569 1 0.012987013 7.38961 67.51677 141.8038
573 570 570 1 0.012987013 7.402597 139.1027
713 571 571 3 0.038961039 22.24675 409.2826
762 572 572 1 0.012987013 7.428571 133.7783
569 573 573 1 0.012987013 7.441558 131.1551
775 580 580 1 0.012987013 7.532468 113.5199
735 582 582 1 0.012987013 7.558442 108.7151
743 583 583 2 0.025974026 15.14286 212.7032
776 584 584 1 0.012987013 7.584416 104.0141
699 587 587 2 0.025974026 15.24675 194.315
689 593 593 1 0.012987013 7.701299 84.14551
583 594 594 1 0.012987013 7.714286 82.06776
631 596 596 2 0.025974026 15.48052 155.9804
725 599 599 1 0.012987013 7.779221 72.0686
571 602 602 2 0.025974026 15.63636 132.7616
661 612 612 1 0.012987013 7.948052 49.10976
761 620 620 2 0.025974026 16.1039 74.32611
572 621 621 1 0.012987013 8.064935 35.7866
571 626 626 1 0.012987013 8.12987 29.29394
612 631 631 1 0.012987013 8.194805 23.45062
602 637 637 1 0.012987013 8.272727 17.29579
679 647 647 1 0.012987013 8.402597 9.115661
712 648 648 2 0.025974026 16.83117 16.88101
722 654 654 1 0.012987013 8.493506 4.935023
700 659 659 1 0.012987013 8.558442 2.728074
620 661 661 1 0.012987013 8.584416 2.027113
637 663 663 1 0.012987013 8.61039 1.430048
721 679 679 1 0.012987013 8.818182 0.393785
620 686 686 1 0.012987013 8.909091 2.03133
769 687 687 1 0.012987013 8.922078 2.369161
763 689 689 1 0.012987013 8.948052 3.122745
582 694 694 1 0.012987013 9.012987 5.46125
704 696 696 1 0.012987013 9.038961 6.578471
587 698 698 2 0.025974026 18.12987 15.59917
587 699 699 1 0.012987013 9.077922 8.449107
584 700 700 1 0.012987013 9.090909 9.1246
696 704 704 2 0.025974026 18.28571 24.17263
722 706 706 1 0.012987013 9.168831 13.72301
766 709 709 1 0.012987013 9.207792 16.37287
659 712 712 1 0.012987013 9.246753 19.25649
571 713 713 1 0.012987013 9.25974 20.26965
789 714 714 1 0.012987013 9.272727 21.30878
593 721 721 1 0.012987013 9.363636 29.30996
745 722 722 2 0.025974026 18.75325 61.11376
648 725 725 1 0.012987013 9.415584 34.45349
698 727 727 1 0.012987013 9.441558 37.1811
647 732 732 1 0.012987013 9.506494 44.45467
732 734 734 1 0.012987013 9.532468 47.54592
599 735 735 2 0.025974026 19.09091 98.26101
594 736 736 1 0.012987013 9.558442 50.74106
596 743 743 1 0.012987013 9.649351 62.74224
686 745 745 1 0.012987013 9.675325 66.40492
714 752 752 2 0.025974026 19.53247 160.0849
778 761 761 1 0.012987013 9.883117 99.44658
704 762 762 1 0.012987013 9.896104 101.7325
687 763 763 1 0.012987013 9.909091 104.0443
580 766 766 2 0.025974026 19.8961 222.2715
648 769 769 1 0.012987013 9.987013 118.4609
735 773 773 1 0.012987013 10.03896 128.5915
654 775 775 1 0.012987013 10.06494 133.8126
773 776 776 1 0.012987013 10.07792 136.4621
583 778 778 1 0.012987013 10.1039 141.8391
734 789 789 1 0.012987013 10.24675 173.2695
602
596 77 1 673.49 4702.25
626
694
752
698
727
766
709
736
706
752
621
570
677.8413 673.4935 68.57295
68.57295
BINOMIAL

N 12 P*x CUMMULITAVE
P 0.267 0 0.024057345 0.02405734496
1 0.105156526 0.12921387056
2 0.210671702 0.33988557294
3 0.255795109 0.59568068224
4 0.209643809 0.80532449113
5 0.122182585 0.92750707661
6 0.051923432 0.97943050822
7 0.016211526 0.99564203375
8 0.003690721 0.99933275451
9 0.000597497 0.99993025183
10 6.529268E-05 0.99999554451
11 4.324233E-06 0.99999986874
12 1.312608E-07 1
5 POINT SUMMERY
663
573 MAX 789
713 MJN 569
762 Q1 600.5
569 Q2 689
775 Q3 733
735 IQR 132.5
743 MEDIAN 689
776
699
689
583
631
725
571
661
761
572
571
612
602
679
712
722
700
620
637
721
620
769
763
582
704
587
587
584
696
722
766
659
571
789
593
745
648
698
647
732
599
594
596
686
714
778
704
687
580
648
735
654
773
583
734
602
596
626
694
752
698
727
766
709
736
706
752
621
570
OUTLIERS
5 POINT SUMMARY Q1 600.5 OUTLIERS
569 Q3 733 0
570 IQR 132.5 0
571 UPERBOUND 931.75 0
571 LOWERBOUND 401.75 0
571 0
572 0
573 0
580 0
582 0
583 0
583 0
584 0
587 0
587 0
593 0
594 0
596 0
596 0
599 0
602 0
602 0
612 0
620 0
620 0
621 0
626 0
631 0
637 0
647 0
648 0
648 0
654 0
659 0
661 0
663 0
679 0
686 0
687 0
689 0
694 0
696 0
698 0
698 0
699 0
700 0
704 0
704 0
706 0
709 0
712 0
713 0
714 0
721 0
722 0
722 0
725 0
727 0
732 0
734 0
735 0
735 0
736 0
743 0
745 0
752 0
752 0
761 0
762 0
763 0
766 0
766 0
769 0
773 0
775 0
776 0
778 0
789 0
SUMMARY OUTPUT

Regression Statistics -2.675778973


Multiple R 0.977651950354816
R Square 0.955803336032574
Adjusted R Square 0.947767578947588
Standard Error 11.1011360990691
Observations 14

ANOVA
df SS MS
Regression 2 29316.1268361 14658.063418
Residual 11 1355.58744959 123.23522269
Total 13 30671.7142857

Coefficients Standard Error t Stat


Intercept -3.34271002095962 5.88810233651 -0.567705829
Number of Beds -0.0101242015750027 0.06493937172 -0.155902364
Admissions (100s) 0.656806846234594 0.12308983741 5.3359957251

RESIDUAL OUTPUT

Observation Predicted Total Expenses (Rs. 10,000,000) Residuals


1 50.6116283614648 6.38837163854
2 115.956948076809 11.0430519232
3 155.847521758063 1.15247824194
4 32.9803517850214 -8.980351785
5 14.2379455476088 -0.2379455476
6 96.1844057910269 -3.184405791
7 29.7975595695984 15.2024404304
8 12.11566198528 -6.1156619853
9 89.6125385602592 9.38746143974
10 10.1148688418512 1.88513115815
11 11.5297245500704 -0.5297245501
12 9.24672001868212 5.75327998132
13 26.8172513856755 -5.8172513857
14 88.9468737685902 -25.946873769
F Significance F
118.943781640481 3.5452118437764E-08

P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0%


0.581636542900398 -16.302335884711 9.616915843 -16.30233588 9.6169158428
0.878934243166407 -0.153054795039894 0.132806392 -0.153054795 0.1328063919
0.0002388696737626 0.385887940729894 0.927725752 0.3858879407 0.9277257517

PROBABILITY OUTPUT

Percentile Total Expenses (Rs. 10,000,000)


3.57142857142857 6
10.7142857142857 11
17.8571428571429 12
25 14
32.1428571428571 15
39.2857142857143 21
46.4285714285714 24
53.5714285714286 45
60.7142857142857 57
67.8571428571429 63
75 93
82.1428571428571 99
89.2857142857143 127
96.4285714285714 157
Normal Probability Plot
200
Total Expenses (Rs.

150
10,000,000)

100
50
0
0 20 40 60 80 100 120
Sample Percentile
REGRESSION
X1 X2 Y
Hospital Number of Beds Admissions (100s) Total Expenses (Rs. 10,000,000)
1 250 86 57
2 348 187 127
3 495 250 157
4 175 58 24
5 80 28 14
6 225 155 93
7 165 53 45
8 95 25 6
9 420 148 99
10 98 22 12
11 88 24 11
12 54 20 15
13 135 48 21
14 356 146 63
TOTAL EXPENSE = -14.205+0.3161 NO OF BEDS
SUMMARY OUTPUT

Regression Statistics
Multiple R 0.917280154290981
R Square 0.841402881456085
Adjusted R Square 0.828186454910759
Standard Error 20.1338138184591
Observations 14

ANOVA
df SS MS
Regression 1 25807.2687792 25807.2687791978
Residual 12 4864.44550652 405.370458876375
Total 13 30671.7142857

Coefficients Standard Error t Stat


Intercept -14.2506035031406 10.0148429826 -1.42294827067863
Number of Beds 0.316189158526799 0.03962798597 7.9789358647323

RESIDUAL OUTPUT

Observation Predicted Total Expenses (Rs. 10,000,000) Residuals Standard Residuals


1 64.7966861285592 -7.7966861286 -0.40305568951499
2 95.7832236641855 31.2167763358 1.61377527618802
3 142.263029967625 14.7369700324 0.761839006960038
4 41.0824992390492 -17.082499239 -0.88309294434899
5 11.0445291790033 2.955470821 0.152785338534384
6 56.8919571653892 36.1080428346 1.86663306201737
7 37.9206076537812 7.07939234622 0.365974635428813
8 15.7873665569053 -9.7873665569 -0.50596544622714
9 118.548843078115 -19.548843078 -1.01059248713479
10 16.7359340324857 -4.7359340325 -0.24482775444415
11 13.5740424472177 -2.5740424472 -0.13306710521588
12 2.82361105730653 12.1763889427 0.629467796981452
13 28.4349328979773 -7.434932898 -0.38435457786547
14 98.3127369323999 -35.312736932 -1.82551911135867
Num

40
20

Residuals
0
-20 0
-40

F Significance F
63.66341753 3.8627268518326E-06

P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0%


0.18022501 -36.0710718806282 7.56986487434693 -36.07107188 7.5698648743
3.862727E-06 0.22984719427503 0.402531122778568 0.2298471943 0.4025311228

PROBABILITY OUTPUT

Percentile Total Expenses (Rs. 10,000,000)


3.57142857142857 6
10.7142857142857 11
17.8571428571429 12
25 14
32.1428571428571 15
39.2857142857143 21
46.4285714285714 24
53.5714285714286 45
60.7142857142857 57
67.8571428571429 63
75 93
82.1428571428571 99
89.2857142857143 127
96.4285714285714 157
Number of Beds Residual Normal Probability
Plot 200

Total Expenses (Rs.


150

10,000,000)
40
100
20
Residuals

50
0
-20 0 100 200 300 400 500 600 0
-40 0 20 40 60
Number of Beds Sample Percentile

Number of Beds Line Fit Plot


200
Total Expenses (Rs.

Total Expenses (Rs.


150
10,000,000)

10,000,000)
100 Predicted Total
50 Expenses (Rs.
0 10,000,000)
0 100 200 300 400 500 600
Number of Beds
Normal Probability Plot

0 20 40 60 80 100 120
Sample Percentile
SUMMARY OUTPUT

Regression Statistics
Multiple R 0.977602004548007
R Square 0.955705679296281
Adjusted R Square 0.952014485904304
Standard Error 10.6402645217129
Observations 14

ANOVA
df SS MS
Regression 1 29313.1315366 29313.13153661
Residual 12 1358.5827491 113.215229092022
Total 13 30671.7142857

Coefficients Standard Error t Stat


Intercept -3.88711421992991 4.54406395126 -0.85542682973288
Admissions (100s) 0.638735679263215 0.03969561114 16.0908387820702

RESIDUAL OUTPUT

Observation Predicted Total Expenses (Rs. 10,000,000) Residuals Standard Residuals


1 51.0441541967066 5.95584580329 0.582602137450577
2 115.556457802291 11.4435421977 1.11940979746391
3 155.796805595874 1.20319440413 0.117696739432854
4 33.1595551773366 -9.1595551773 -0.89598968822563
5 13.9974847994401 0.00251520056 0.00024603746818
6 95.1169160658684 -2.1169160659 -0.20707719197438
7 29.9658767810205 15.034123219 1.47064121727755
8 12.0812777616505 -6.0812777617 -0.59487191901595
9 90.6457663110259 8.35423368897 0.817212964322632
10 10.1650707238608 1.83492927614 0.17949318260694
11 11.4425420823873 -0.4425420824 -0.04328956316634
12 8.88759936533439 6.11240063467 0.597916365252649
13 26.7721983847044 -5.7721983847 -0.56463770684895
14 89.3682949524995 -26.368294952 -2.57935237204404
Admi
77.87105273
10

Residuals
-10 0

-30

F Significance F
258.9150927 1.7370425883791E-09

P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0%


0.409070229 -13.7877790557638 6.01355061590398 -13.78777906 6.0135506159
1.737043E-09 0.552246372422627 0.725224986103803 0.5522463724 0.7252249861

PROBABILITY OUTPUT

Percentile Total Expenses (Rs. 10,000,000)


3.57142857142857 6
10.7142857142857 11
17.8571428571429 12
25 14
32.1428571428571 15
39.2857142857143 21
46.4285714285714 24
53.5714285714286 45
60.7142857142857 57
67.8571428571429 63
75 93
82.1428571428571 99
89.2857142857143 127
96.4285714285714 157
Admissions (100s) Residual
Plot
Admissions (100s) Line Fit
10 Plot
Residuals

Normal Probability Plot


Total Expenses (Rs.
Total Expenses (Rs.

-10 0 50 100 150 200 250


200 300 10,000,000)
10,000,000)

200
Total Expenses (Rs.

Predicted Total
-30 100 Expenses (Rs.
150
10,000,000)

0 Admissions 10,000,000)
100 (100s)
0 50 100
50 150 200 250 300
Admissions
0 (100s)
0 20 40 60 80 100 120
Sample Percentile

You might also like