Site ID: PH060001

Cost of Work UOM QTY RATE


Per day Rate of Workers for Two Team m3 165.038 ₱350.00
Slope Protection Labor (Installation) day 1 ₱6,350.00

Sub Contractor Fees 30%


Manual Excavation Labor Fees (11days) Sub-total
Grand Total

worker
6 550
6 400

800000
2500000
3300000
165000
AMOUNT
₱57,763.13 Dec 13-25, 2021
₱6,350.00
₱64,113.13
₱19,233.94
₱83,347.06 per cubic (Manual)
₱83,347.06

505.0189351

3300
2400
5700
11 days
₱62,700.00
Manual Excavation for Left Side Tower Footing Manual Exacavtion for Right Side TowerFooting

Manual Excavation for Center Side Tower Footing Central View of Manual Excavation
Slope Protection During Rainy Season Slope Protection During Rainy Season

Slope Protection During Rainy Season Slope Protection During Rainy Season