Professional Documents
Culture Documents
Major Project Schedule 2021-23
Major Project Schedule 2021-23
Major Project Schedule 2021-23
In view of the fact that the Project Study is an integral part of MBA Programme and the same provides basic exposure for the students to
Problem Based Learning (PBL), the Institution places much importance to the effectiveness in conduct of such studies by the students. A road
map for the Main Project for Batch 2020 has been given under:
9 2ND REVIEW Report consists of 1st, 2nd, and 3rd. 16th 18th July
chapter July
d) Interpret result.
e) Arrive at suggestions.