0345-5556780
Solar Power System
Refer to your requirement , we thank you for taking interest in our product line and are pleased to offer our proposal for said required by you as follows.
Sr. No Items Description Qty Unit Price Sub Total Exclusive of Tsxes
JA Solar/JInko/ Canadian 545-Wp Half Cell Mono Facial PERC
Crystalline or Equivalent Solar Panel
Solar PV Panels
2 Tier one Manufacturer of A-Grade Panels 10 Rs 52,200.00 Rs 522,000.00
5.5KW PV
Zero feed device will be charge separately, if needed (It works on minimum two ampere per phase current of load)
For customized Structure requirement at site, structural charges will be charge speparately, as per design.
Customized structure design & prepared by customer then it's stength and durability will be customer responsibility.
Breifing and design requirement of customize structure to client/fabricator will be provide at once. After that company
If customer install batteries as own choice, company will not be responsible of any fault and back up time of a battery.
Scope of Work (Not
Included)
Cables and Accessories Cost are calculated on nearly approximate basis, extra cable will be charge as per Actual
ON Grid system, in case of no zero feed device use, power will be limit as per the minimum per phase load requirement till net metering.
ON Grid Inverter always required a grid/utility/generator pulse for countinuity of a system, if grid/utility is not there then complete system will be shutdown. For
Generator, Generator synchronization device will be required.
Extra boring and earthing will be required for lightning arrestor, if building is higher than fifteen meter hight.
Company provide the service for net metering as per AEDB rule.
Company is not responsible of any delay or not issanance of license due to DISCO/NEPRA.
As per our contract, the approved quotation is attached with the agreement. The system Inverter capacity will be 6KW and the type of
system will be ON Grid The installation will be started after the confirmation of advance payment. The quantity of equipment and
warranties will not the part of sun Energy except installation.
Signature: Signature:
--------------------------------------------------------- ---------------------------------------------------------
Designation: Designation:
--------------------------------------------------------- ---------------------------------------------------------
Date:
--------------------------------------------------------- Date:
---------------------------------------------------------