Hazard Analysis and Risk Control Record

Task/Process
Revision: 02 Lowering mast with old bridle lines.
Assessed:
Date: 29 Feb 17 Location: Rig-25
Operation: Lowering Mast. Assessment Team: Syed Zafar ali shah– Waheed Asghar(QHSE)
HAZARD INITIAL RISK CONTROL MEASURES RESIDUAL RISK

Hazard Description List all Current and Planned Control Measures, taking into Account all
and Worst Case Loss Contributing and Escalating Factors

Likelihood

Likelihood
Risk Level

Risk Level
Consequences with Category/

Severity

Severity
no Prevention or
Activity Mitigation Measures in Population Current and Planned Prevention Current and Planned Mitigation
Steps Place Affected Measures to reduce Likelihood Measures to reduce Severity
Lower mast Bridle line may parted while Personnel - Visually Inspect condition of the bridle line - Safety meeting will be held prior to lower /
with old bridle Lowering / Raising the Assets prior to use. raise mast.
lines. mast. Check for any rust between strands.
Mast may fell down. Check for any broken wire. - Crew members will stay clear from the
Check for any kinking. mast during this period.

Schlumberger Private
Undesirable (-6)
Catastrophic (-4)

Intolerable (-12)
Check for any wear, distortion & corrosion
Possible (3)

Unlikely (2)

Major (-3)
- Dedicate 2 persons to check the bridle
- MPI is done on sockets before use of bridle line at each side of the mast during the Rig
lines on 28th Feb-08. down / up procedure

- Mast will be lowered in a smooth manner,


no jerks and sudden brakes while lowering
& raising.

HARC Record Template OFS-QHSE-S020 Page 1 of 1 Revised: 11 Feb 2004