HARC For Lowering Mast With Old Bridle Lines
HARC For Lowering Mast With Old Bridle Lines
Task/Process
Revision: 02 Lowering mast with old bridle lines.
Assessed:
Date: 29 Feb 17 Location: Rig-25
Operation: Lowering Mast. Assessment Team: Syed Zafar ali shah– Waheed Asghar(QHSE)
HAZARD INITIAL RISK CONTROL MEASURES RESIDUAL RISK
Hazard Description List all Current and Planned Control Measures, taking into Account all
and Worst Case Loss Contributing and Escalating Factors
Likelihood
Likelihood
Risk Level
Risk Level
Consequences with Category/
Severity
Severity
no Prevention or
Activity Mitigation Measures in Population Current and Planned Prevention Current and Planned Mitigation
Steps Place Affected Measures to reduce Likelihood Measures to reduce Severity
Lower mast Bridle line may parted while Personnel - Visually Inspect condition of the bridle line - Safety meeting will be held prior to lower /
with old bridle Lowering / Raising the Assets prior to use. raise mast.
lines. mast. Check for any rust between strands.
Mast may fell down. Check for any broken wire. - Crew members will stay clear from the
Check for any kinking. mast during this period.
Schlumberger Private
Undesirable (-6)
Catastrophic (-4)
Intolerable (-12)
Check for any wear, distortion & corrosion
Possible (3)
Unlikely (2)
Major (-3)
- Dedicate 2 persons to check the bridle
- MPI is done on sockets before use of bridle line at each side of the mast during the Rig
lines on 28th Feb-08. down / up procedure