PROJECT : Paket Ren-04, Perencanaan Teknis Jembatan STARTED : 18 Agustus 2022 BORE HOLE NO. : BH- 01
Provinsi Sulawesi Tengah FINISHED : 20 Agustus 2022 DRILL MASTER : Bahri Sada
LOCATION : Jembatan WATUMALOE 3 (Km. 307,33) TOTAL DEPTH : 10 ,00 Meter LOGGED BY : H. Idhil Maming
GROUND ELEVATION : + 0,00 m (Setempat) BORING METHOD : Core & Wash Koordinat : 01 °11'31.4" S ;
WATER : -3.20 m 121°14'48.8" E
Recovery %
R.Q.D. %
Standard Penetration Test
Relative Density
Depth in Meter
_______
Casing
Colour
Scale
Log
N3 Blows/cm
N2 Blows/cm
N1 Blows/cm
0 10 20 30 40 50 60
0
sangat
padat 2.00 60 60 0 >60
2 N > 60
2.14 7.00 7.00 0.00 7.00
sedang
5
sangat
padat 8.00 25 29 32 61
8
8.45 15.00 15.00 15.00 30.00
N > 60
sangat
padat 10.00 60 60 >60
10 N > 60
10.30 15.00 15.00 0.00 15.00
End of Boring