Lampiran : A Page : 1

BORING LOG AND S.P.T. TEST RESULT

PROJECT : Paket Ren-04, Perencanaan Teknis Jembatan STARTED : 18 Agustus 2022 BORE HOLE NO. : BH- 01
Provinsi Sulawesi Tengah FINISHED : 20 Agustus 2022 DRILL MASTER : Bahri Sada
LOCATION : Jembatan WATUMALOE 3 (Km. 307,33) TOTAL DEPTH : 10 ,00 Meter LOGGED BY : H. Idhil Maming
GROUND ELEVATION : + 0,00 m (Setempat) BORING METHOD : Core & Wash Koordinat : 01 °11'31.4" S ;
WATER : -3.20 m 121°14'48.8" E

Recovery %

R.Q.D. %
Standard Penetration Test

Depth/Depth After Tot. Blows (m)

Numb. of Blows (Blow/cm) =N2+N3


Undisturbed Sample
Elevation in Meter

Relative Density
Depth in Meter

_______
Casing

Colour
Scale

Log

Soil / Rock Description


N - Value (N/foot)

N3 Blows/cm
N2 Blows/cm
N1 Blows/cm
0 10 20 30 40 50 60
0

Coklat Timbunan Gravel campur lempung


tua Warna Coklat tua
1

sangat
padat 2.00 60 60 0 >60
2 N > 60
2.14 7.00 7.00 0.00 7.00

sedang 4.00 60 60 0 >60


4 N > 60
4.22 11.00 11.00 0.00 11.00

sedang
5

abu-abu Lempung campur Grevel dan batuan lempung


muda warna abu-abu, kekerasan sangat keras sangat 6.00 36 52 60 >60
6 N > 60
padat 6.41 15.00 15.00 11.00 26.00

sangat
padat 8.00 25 29 32 61
8
8.45 15.00 15.00 15.00 30.00
N > 60

sangat
padat 10.00 60 60 >60
10 N > 60
10.30 15.00 15.00 0.00 15.00
End of Boring