Vi45608 - Cellsiteinstallationtips Po Cpo Nse Ae
Vi45608 - Cellsiteinstallationtips Po Cpo Nse Ae
FIBER CPRI/
eCPRI
Antenna
Alignment
VIAVI FFL-050 Visual Fault Locator
Fiber
Junction
Box
Fiber Inspection
VIAVI OneAdvisor 800 Cell Site
Installation Tool
Optical continuity
and power O-DU Emulation
VIAVI FiberChek
Probe
VIAVI
Sidewinder
Fronthaul
Testing
SFP/SFP+/QSFP
4 TEST BEFORE YOU LEAVE
Verify the open radio
connectivity (SFPs and optical
power), as well as the radio’s
Connector Inspection OTDR profile (operating bands and
synchronization status) with
and Cleaning: Inspect
CPRI Rate (1-9) O-DU Emulation.
Before You Connect
(IBYC) Everything on the tower is connected
10G, 25G eCPRI and powered, but there is no Base Band
Ensure all end faces of fiber Unit (BBU) or backhaul installed at the
cables, connectors, and mmWave
modules are clean and site yet.
Antennas
undamaged.
How do you ensure the site is ready to integrate and
3 TEST AS YOU GO
that you can confidently pack up and leave?
Transport
Fiber Inspection Ethernet
First check the circuit for basic
Fiber Inspection Backhaul connectivity, then continue
OTDR Testing with industry-standard
VIAVI OneAdvisor 800 Cell Site OTDR throughput tests Y.1564 and/or
Installation Tool
RFC 2544.
Optical Insertion Loss Fronthaul SFP/SFP+/QSFP
(dB) Testing
Send a known optical power CPRI Rate (1-9)
Now you are confident that you have
level through the fiber under
successfully completed your MOP
test and measure the drop 10G,25G eCPRI
(dB) at the far end. Often
done with loopback at the
tower top end of the fiber.
Antenna Alignment
Upload complete test results
Make sure the antenna is pointed
via VIAVI MobileTech App in the right direction (azimuth)
and tilt. Document the antenna’s
field of view through the camera
VIAVI OneAdvisor 800 Cell Site embedded in the alignment tool.
Installation Tool
Hybrid Fiber
Optical Time Domain Job JOB MANAGER Cable
Reflectometry (OTDR) Manager SCREEN
Pulses of light are injected
into the fiber under test. The
delay and intensity of light
scattered or reflected back to
the instrument is calculated
and displayed as events along
the fiber. Thresholds can be Job Manager allows you to follow
set for the various events such
MOPs automatically
as splices, bends, connectors
and the end of the fiber.
At a minimum, run spot checks while on
the ground at the garage and /or before
you hoist and attach components
CPRI Check
Ensure that the SFP or QSFP
to be installed in the BBU or
RRU is the correct one and
that it is clean with a good
power level and no bit errors.
Hybrid Fiber
VIAVI StrataSync