SLAR/QS/FSPU/UITMKS

MEASUREMENTS OF
CONSTRUCTION WORK IV
DQS281

PILING WORK : TIMBER PILING


PRESSURE TREATED TIMBER PILE
• Nominal size: 125 x 125mm and 150 x 150mm
• Load bearing capacity: 120kN – 150kN (12 tonne –
15 tonne)
• Only 1 extension pile is allowed
• As end bearing or friction pile
TAKING OFF LIST
DESCRIPTION (if there is TRIAL PILE) UNIT
1. Preambles
2. Provision Of Piling Equipment Item
3. Maintaining Piling Equipment Item
Preliminary Pile / Trial Pile
4. Pressure Treated Timber Initial Pile No
5. Pressure Treated Timber Extension Pile M
6. Driving – Vertical M
7. Driving – Raking (Ratio) M
8. Pile Extension No
9. Cut-off Head No
10. Preliminary Load Test Item
Working Pile
11. Pressure Treated Timber Initial Pile No
12. Pressure Treated Timber Extension Pile M
13. Driving – Vertical M
14. Driving – Raking (Ratio) M
15. Pile Extension No
16. Cut-off Head No
17. subsequent Load Test Item
TAKING OFF LIST
DESCRIPTION (if there is NO TRIAL PILE) UNIT
1. Preambles
2. Provision Of Piling Equipment Item
3. Maintaining Piling Equipment Item

WORKING PILE
4. Pressure Treated Timber Initial Pile No
5. Pressure Treated Timber Extension Pile M
6. Driving – Vertical M
7. Driving – Raking (Ratio) M
8. Pile Extension No
9. Cut-off Head No
10. Preliminary Load Test Item
11. Subsequent Load Test Item
PILING SCHEDULE
PILE CAP NO. OF NO. OF TOTAL INITIAL DRIVING LENGTH EXTENSION PILE PILE CUT OF REMARKS
REF. PILE PILE PER NO. OF PILE (M) (M) EXTENSION HEAD
CAP PILE CAP PILE (NOS) VERTICAL RAKING N.e 3.00m Exc. 3.00m (NO) (NO) DRIVIN EXTENSION
G PILE
PREAMBLES
CLAUSE DESCRIPTION

E.2.1 Ground Water Level


Ground water level was established at 3.00m below existing ground level on
9/12/2016 which shall be designated at the precontract water level.
E.2.1 Trial pit / Bore holes
3 Nos bore holes were sunk in positions shown on the location drawing.
E.1.1c Existing Services
Telephone cables cross over the site of a height of 10.00m on the North Side
of the site as shown on the location drawing.
E.2.2 Work Near Water
The work is to be carried out at a minimum distance of 40.00m from
riverbank, the normal level of which is 1.00m below ground level.
E.3.1 Starting Level
The piling work is expected starts at and measurement have been taken from
existing ground level
PROVISION OF PILING EQUIPMENT (E4.1a)
Heading: Element/Trade/Work
PRESSURE TREATED TIMBER PILE (ALL
PROVISIONAL) category:
Sub Heading: PILING WORK
Provision of Piling Equipment

Description: Unit Qty


Allow for bringing to site and removing from site
all plant required for this type of piling. ITEM
MAINTAINING OF PILING EQUIPMENT (E4.1b)
Heading: Element/Trade/Work
PRESSURE TREATED TIMBER PILE (ALL
PROVISIONAL) category:
Sub Heading: PILING WORK
Maintaining of Piling Equipment

Description: Unit Qty


Allow for maintaining on site all plant required
for this type of piling. ITEM
PRESSURE TREATED TIMBER INITIAL PILE (E5.3a)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (trial pile)

Description: Unit Qty


Total number of pile length 6.00m with 15kg
chilled hardened iron shoe No
DRIVING (E5.3b)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (trial pile)

Description: Unit Qty


Total driven length
M
EXTENSION PRESSURE TREATED TIMBER PILE (E5.7b)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (trial pile)

Description: Unit Qty


Total length of extension pile not exceeding
3.00m. M

Total length of extension pile exceeding 3.00m.


PILE EXTENSION (E5.7a)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (trial pile)

Description: Unit Qty


Total number of pile extensions
No
CUT-OFF HEAD (E5.9a)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (trial pile)

Description: Unit Qty


Cutting off top of pile to required level
No
PRELIMINARY LOAD TEST (E7)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (trial pile)

Description: Unit Qty


Allow for 4 nos of preliminary load testing on a
single number / group of 5 numbers 125mm x Item
125mm timber piles to a total combined load of
120KN.
SUBSEQUENT LOAD TEST (E7)
Heading: Element/Trade/Work
Pressure Treated Timber Pile (ALL PROVISIONAL)
category:
Sub-Heading: PILING WORK
125mm x 125mm ‘Kempas’ pressure treated
timber initial pile including all accessories, shoe,
joint, plate and etc. (working pile)

Description: Unit Qty


Allow for 2 nos of subsequent load testing on a
single 125mm x 125mm timber piles to a of Item
120KN.
END..