BLAST ZONE: B3
Blast Number 317 DATE 19/06/2023
DEPARTMENT: DRILLING AND BLASTING TIME 15:00
Electronic
Fanel Dual Fanel Dual Electric or
Number of Average Emulnor 3000 Emulnor 3000 Emulnor 3000 Emulnor 5000 detonator Powder Factor
Hole Type Diameter (in) Burden (m) Spacing (m) Area (m2) Volume (m³) Anfo (Kg) 17/800ms x 6 17/800ms x 12 m CTD 25 ms CTD 35 ms CTD 42 ms CTD 65 ms CTD 100 ms Electronic
Holes Height (m) 2"x8" (kg) 2"x16" (kg) 2.5"x16" (kg) 2.5"x16" (kg) (Fametronic (kg/m³)
m (piece) (piece) Detonator
xpro)
ZONA B3 113.0 3.0 6.97 2.6 3.0 881.4 6142.6 1,600 0 325 0 0 0.0 0.0 113.0 0.0 0.0 0.0 0.0 0.0 0.0 0.31
113 - 6.97 - - 881.40 6,142.6 1,600 - 325 - - - - 113 - - - - - - 0.31
Blasting Pattern Model VIBRATION MONITORING SITE EM-V01
LEGEND ``
PLATFORM
RAMP
HSE CHIEF LEADER - MOTA ENGIL PERU DRILLING AND BLASTING SUPERVISOR - MOTA ENGIL PERU BLASTING SUPERVISOR - FAMESA CONSORCIO CHECSAC-CCCC4TH SUPERVISOR