Professional Documents
Culture Documents
Timesheet - TB Oasis XV BG Lintas 57
Timesheet - TB Oasis XV BG Lintas 57
0323/SS
Date : 30 March 2023
TIMELOGS OF ATTENDANCE
WP DAMAGE
On 04 March 2023
At 0400 hours LT Arrive at Hotel in Rembang city
At 0830 hours LT Informed by member reps that W.P Damage Survey has been
arranged with claimant to be conducted at 1200 hours LT
At 1130 hours LT Surveyor proceed to site
At 1210 hours LT Arrived at site and met Mr. Widodo
At 1210 – 1500 hours LT Conducted W.P Damage Survey, interview with Fisherman and
Gathering information related to incident.
At 1510 hours LT Completed survey, attending parties left site
At 1600 hours LT Arrived at Hotel and overnight
On 05 March 2023
At 0630 hours LT Surveyor proceed to Breakwater and fishing boat that sustained
damaged at Batu Naga Beach
At 0700 hours LT Arrived at site
At 0715 – 1400 hours LT Conducted measured & inspected to alleged damaged of break water
and followed with details inspection to 10 units of fishing boat
At 1430 hours LT Completed survey, surveyor back to Jakarta
On 06 March 2023
At 0410 hours LT Arrived at Jakarta
Shipboard Investigation
Surveyor’s Review
Prepared by :
Sonny Sonjaya
Attending Surveyor
3|Page