Professional Documents
Culture Documents
Curing at Site
Curing at Site
Curing at Site
Dear Sir,
It is observed that curing arrangements at site are not proper for RE Panel work, box
culvert segments and also for other parts of structure as evident from continuous
complaints by our staff in WhatsApp group, while inspecting the site. It is instructed
to make proper arrangements for curing for structural work at site so that proper
strength of work may be achieved.
Further, it is also observed that cube moulds and slump cone are also sometimes not
available at site during concrete construction work. Please assure that all necessary
testing equipments must be present at site before start of concreting work.