Project Coffee Shop

Q. No
Scope :Sub Main Cable
Date :20-3-2023

Total Cost (MMK)


Country Total Cost
Item Description Brand A/U Qty
Origin Labour (MMK) Remarks
Material
Cost
Cost (MMK)
(MMK)
ELECTRCIAL SYSTEM
3 SUB MAIN CABLE
3.1 Metering Panel to MDB
4C x16mm² CU/XLPE/PVC Cable M 50
1C x 16 mm² Cu/PVC Earth Cable M 10
4C x 16 mm² Cable Gland Ea 4
1C x 16 mm² Earth Cable Gland Ea 1
16mm² Cable Lug Ea 8
16mm² Cable Lug Ea 2
16mm² End Cap Ea 8
16mm² End Cap Ea 2
Cable Tie Nos 12
Miscellaneous Lot 1

Sub Total (3.1)


3.2 MDB TO DB-GF
4C x10mm² CU/XLPE/PVC Cable M 6
1C x 10 mm² Cu/PVC Earth Cable M 6
4C x 10 mm² Cable Gland Ea 8
1C x10 mm² Earth Cable Gland Ea 2
10mm² Cable Lug Ea 8
10mm² Cable Lug Ea 2
10mm² End Cap Ea 8
10mm² End Cap Ea 2
Cable Tie Nos 3
24hr timer Nos 1
Miscellaneous Lot 1

Sub Total (3.2)


3.3 MDB TO DB-KC
4C x10mm² CU/XLPE/PVC Cable M 40
1C x 10 mm² Cu/PVC Earth Cable M 40
4C x 10 mm² Cable Gland Ea 8
1C x10 mm² Earth Cable Gland Ea 2
10mm² Cable Lug Ea 8
10mm² Cable Lug Ea 2
10mm² End Cap Ea 8
10mm² End Cap Ea 2
Cable Tie Nos 16
Miscellaneous Lot 1

Sub Total (3.3)


3.4 UNDERGROUND PIPE & ACCESSORIES
50mm PVC Pipe (13.5 Class) local M 50
Trenching & Backfilling (Materials By Other)205M local Suds 6
Pipe Socket And Accessories local Lot 1
Miscellaneous local Lot 1

Sub Total (3.40)

TOTAL MMK (SUB MAIN CABLE)