Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

BILL OF QUANTITY FOR A.E.

WORK ON THE RIGHT BANK OF RIVER GANGA PROTECTION OF VILLAGE HALDI CHHAPRA
(RAMNAGAR) U/S TO BADAN TOLA UNDER MANER BLOCK OF PATNA DISTRICT.

Date and time of Tender Uploading :- 20.12.2021 UPTO 3.00 P.M.


Estimated Cost:- Rs. 8,51,57,220.00
Earnest Money :- Rs. 17,04,000.00
Date of Completion :- 15.05.2022
Cost of BOQ pay online mode only:- Rs 10,000.00
E-Tendering Processing fee pay on online mode only: - Rs. 5,900.00
Sl.
Item Quantity Unit Rate Amount (Rs)
No.
1 2 3 4 5 6
1 . Earth work by excavtor and spreader or tractor
leveller in lower level canal or flood embankment or
dhar (Like, Minor, Sub-minor,Jamindari bundh ,pynes
etc .where tipper is not neaded ). All type of work like
filling and making of canal banks or embankment of
earth free from logs ,roots or any other gradients,
desilting of canal bed and dhar in proper profile with
dressing and finishing including new construction
,repaire or restoration in odinary soil including cutting 32367.40 M3 62.80 2032672.72
,loading ,unloading ,carriage from pit to bank or
embankment ,unloading ,spreading, cloud breaking
and laying in layers properly with lead below 15m and
with all lifts all complete job as per specifications and
direction of E/I. (mode of measurement-sectional
measurement of compacted earth)
2 . Providing laying and filling Geo bags of size 1 m x
0.7 m (Type A 300GSM nonwoven )weight of bag 420
gram , volume of filled Geo bags = 0.07 cum weight
of filled Geo bags = 126 kg with local sand including
stiching in 4 line by approved nylon thread with
stiching machine & Generator Stacking and Placing )
after loading , unloading and , carriage with help of
trolly within 150 m lead etc .All complete as per 33422 Each 191.60 6403655.20
specification and direction of E/I including Carriage
of local sand by boat including loading , unloading
and stacking with lead of 1/2 km all complete as per
Approved design , specification and direction of E/I

3 Suply of new Ec bag and N.C bag with local sand or


sandy soil (volume of filled bag 1.2 cft and weight 50
kg ) , stiching on two lines by approved nylon thread
with stiching machine & generator , stacking the bags
and placing in Nylon crate of size (1m x 1m x 1m)
with a lead of 150m including supply of nylon thread
etc . Placing the filled crates in dry portion within a
lead of 30m ,all complete as per approved design , 15774 Each 1185.10 18693767.40

specification and direction of E/I.(5.7.52). including


Carriage of local sand by boat including loading ,
unloading and stacking with lead of 1/2 km all
complete as per Approved design , specification and
direction of E/I.
4 Providing laying and filling Geo bags of size 1m x
0.7m (Type A 300 GSM nonwoven ) weight of bag
420 gm, volume of filled bag 0.07 cum, weight of filled
geo bag 126 kg with local sand or sandy soil
including stiching in four lines by approved nylon
thread with stiching machine and generator, stacking
and placing in Gabion of size 1.8m x 1.8m x 0.5m (18
Nos. Geo bags per gabion ) after loading , unloading
and carriage with the help of trolley within 150m lead 8356 Each 5496.70 45930425.20

including cess all complete as per specifiction and


direction of E/I.including Carriage of local sand by
boat including loading , unloading and stacking with
lead of 1/2 km all complete as per Approved design ,
specification and direction of E/I

5 Royalty of sand 26268.07 Cum. 75.00 1970105.25


75030625.77
Add GST @ 12% 9003675.09
Add Labour Cess @ 1% 750306.26
Signeorage fee 10% of Local Sand Qty 26268.07m3 @(66.85
+ 75)/m3 372612.57
TOTAL Rs. 85157219.69
Grand Total Rs. 85157219.69
Say Rs. 85157220.00
Permissible limit.

1 Estimated cost :- Rs. 851,57,220.00 (A)

2 Cost of Govt. Material :- Rs.- Nil (B)


3 Permissible limit :- Nil

Rate quoted according to WRD letter no. 50 dated 20.01.2020 in context


4 with RCD notification no. 447(S) & 448(S) dated 16.01.2020 & Letter No.
449(S) dated 16.01.2020

5 Name of the Contractor :-

6 Address of the Contractor :-

I/we offer in Figures……. in words………………… % (Percentage) High /


7 IN FIG.
Less/Estimated rate are mentioned in the Bill of quantity.

IN
0
WORDS

Executive Engineer, Sone Flood Protection Division, Khagaul.

You might also like