• JULIUS PLUCKER
• 0705666065
• jpyazzi2@gmail.com
Bid Evaluation Process
• “Bid” is increasingly being used by the bidder (the supply side)
and the term “tender” used on the procurement side (the
buyer).
• Bid – an approach to a client in order to gain significant new or
repeat business.
• Definition of Bid Evaluation
• Bid evaluation is the organized process of examining and
comparing bids to select the best offer in an effort to acquire
goods, works and services necessary to achieve the goals of an
organization. The best offer recommended as a result of bid
evaluation is referred to as the lowest responsive evaluated
bid. It may also be called the most economically advantageous
tender (MEAT).
Bid Evaluation Process…….continued
• Bid evaluation is the responsibility of a body known as the
Bid Evaluation Panel. How this panel is called depends on
the organization.
• Most procurement Legal and Regulatory Frameworks
require it to be an ad-hoc body with at least three members
knowledgeable in Procurement, with technical expertise in
the specific item being procured and a representative of the
user entity.
• Prior to evaluation of bids, the evaluation criteria are
predefined and included in the bidding documents. The bid
evaluation panel evaluates bids based on the predefined
criteria only and recommends award to the lowest
responsive evaluated bid.
Lowest Responsive Evaluated Bid versus Lowest Priced
Bid
• A lowest responsive evaluated bid, as the phrase suggests,
is a bid that has been examined and determined to be
responsive to formal qualification requirements, evaluated
in detail, found to be compliant with pre-defined
evaluation criteria, and found to have the lowest price
after price evaluation and comparison.
• The lowest priced bid is the bid with the lowest price read-
out at the public bid opening event without being
evaluated.
• Therefore, the bid recommended for contract award may
not necessarily be the bid with the lowest read-out price.
Evaluation Criteria
• Evaluation criteria are the standards against which bids
are evaluated. Generally, evaluation criteria can be
categorized into three categories including (i) mandatory
criteria, (ii) weighted criteria and (iii) weighted criteria
with mandatory elements.
• Mandatory criteria are used in straightforward bid evaluation
methods where they are rated as pass/fail, responsive/non-
responsive or comply/non-comply.
• These are usually used in evaluation for goods procurement, but
may also be used for the procurement of services and
infrastructure works. The mandatory criteria are the first criteria
against which bids are evaluated in order to eliminate bids that
do not conform to these requirements.
• Weighted criteria are criteria which can be measured in terms
of degree of responsiveness. The scale used to measure the
degree of responsiveness depends on the procurement method
and category of procurement. Usually this applies to the
evaluation of services.
• Weighted criteria with mandatory elements are criteria that
have mandatory minimum requirements defined and are
measured above that minimum requirement. E.g A requirement
may be set for a consultant to be fluent in at least two
international languages and a rated score may be assigned for
persons with additional international language capabilities, if
the additional language adds value to the requirement.
Stages of the Bid Evaluation Process
• Bid Evaluation constitutes a major stage in the
procurement cycle which relates to;
• examination, comparison, assessment, ranking, selecting
and recommending of bids
• The bids must pass a minimum score to proceed to the next stage
• Bids that do not comply with the technical requirements are not considered
for price/financial evaluation. Before price evaluation, all bids that are not
responsive would be listed and clear reasons recorded for their not being eligible for
further evaluation.
Price/Financial Evaluation: Conducted to assess the financial
offers/proposal.
• At this stage, the panel examines the offered price for
computational/ arithmetical errors and corrected.
• Depending on the procurement type (goods, services or
work), takes into consideration factors such as provisional
sums and discounts, Unconditional discounts considered &
calculated where applicable etc.
• Life cycle costing elements may be considered for specific
requirements.
• Where bids are priced in more than one currency, all
currencies are converted to a single currency for evaluation
based on exchange rate from a specified source, as stated in
the bidding documents. The corrected/evaluated prices are
then compared and bids ranked in order beginning with the
lowest responsive evaluated bid. A price reasonableness
analysis is also done to ascertain that the price of the
recommended bidder is fair given the prevailing market
conditions.
• Bids ranked according to total price
• Costs compared and BEB determined
• Most organizations do not see price reasonableness analysis
as a mandatory evaluation requirement, but it is implied
that it should be done.
Determination of the BEB
The Bid which scores highest according to the evaluation
method used from among those which are eligible,
compliant and substantially responsive shall be the best
evaluated.
TCS
• Bid submission method should be one stage single envelop, unless
stated in the SBD
• Bids shall be subjected to the three stages of evaluation.
Preliminary, technical &
financial requirements shall be evaluated on pass/fail basis
• TCS recommends the lowest priced bid which is substantially
responsive to the commercial and technical requirements of the
PDE
Challenges in Evaluation
• Maintaining confidentiality by members of EC
• Issues of conflict of interest and favoritism
• Awarding of marks /scoring is very subjective
• How to handle influence peddlers and directives?
• Lack of knowledge on how to effectively apply the
relevant methodology
• Errors may occur during the computations
• Bidders may complain about the arithmetical errors
corrected during evaluation
• Using alternative evaluation criteria other than the
communicated
END OF LECTURE 7