@ MICO
Bosch Group
Leadership through Innovation and Technology
Test Specifications
(Subject to alterations)
For Field Service Only
REFERENCE NO_ + SSE-TS-MML 1.8
Edition +: 09.1999
Replaces (edition) 04.1998
Test ol 29.916 034 004
(8) ADJUSTMENT OF PUMP AND GOVERNOR
GUIDE SLEEVE TRAVEL
‘Combination No. + F002 AOZ 002-€ 040 0712 00
(Dx 19 x length in mm
Control lever position Free
‘Speed min” (rpm) + 800
Control rack travelinmm 0.80.7
Ijeton pump 1 PES3A€5D220RS 2777
{MAXIMUM SPEED CONTROL (RATED SPEED)
overnor | RSV.350..1150 AIC 775-2 | Stout supplementary icing sping
Contotlever postion: SSP 4°
Customer 7 Mahindra @ Mahinda bd
Engine model MDI 1815 ‘Speed - min’ (rpm) 21160
Engine code + 5001 Contolrackavelinmm 7.6
Applicaton Tract
TEST BENCH REQUIREMENTS ‘Speed - min” (pm) 1210 - 1220
Cont racktavelinmm — : 66
Testoliniettemperature = 38° 42°
Overttow valve +: 9 451 037 430 ‘Speed - min" (pm) 31215-1235
Inet pressure in bar 18 Conuolrackavelinmm $40
Test injector + 0681 243 009
Opening pressure in bar 172-176 ‘Speed - min’ (rpm) 31350
High pressure pie 1 6x2x600 Contolrackavelinmn 03-14
2. FULL LOAD DELIVERY
Delivery quantity. 2)
inem® /100 strokes
Maximum spread in cm? (a)
£0.6-1.0(0.4-1.2)
105007)
(A) CALIBRATION OF PUMP WITHOUT GOVERNOR ACTION | Speed - min” (iam) 1180
Boost pressure in bar :
Direction of rotation 7 Clockwise Control ack tavelinmm 7.8
Presiroke in mm 3.20-3.30(.15-3:35) Delivery quantiy (2) 22:3-22.8(21.3-23.8)
Controtrack position inmm —: 9-12 in om? /500 strokes
‘Cam sequence 1-3-2 Maximum spread inom*(S) + 1.5(2.8)
‘Cam displacement 2 120° £05" ‘Speed - min" (rpm) Pe
Tappet clearance in mm Min 0.2 Boost pressure in bar :
Control rack travel inmm =
BASIC SETTING Delivery quantity () :
in om? 500 strokes
‘Speed -min'* pm) 21150 Maximum spreadin om’ (4): -
Controtrack wavelinmm =: 7.6
Delivery quantity (3) 44-46 3. TORQUE CONTROL
in orn 100 strokes
Maximum spread inem?(S) + 0.3(0.7) Speed min” (rpm)
Control rack travel in mm 7
Speed min” (rpm) $950 Spood-min™ (rpm)
Control rack travel in mm: 5.8 Control rack travelin mm =:
‘Speed -min* (rpm)
Control rack travel in mm
Contd...2‘SSE-TS-MML 1.8
“4. COURSE OF DELIVERY
‘Speed min” (rpm)
Boost pressure in bar
Dalivery quantity (2)
incm* 1600 strokes
Maximum spread in cm (A): 2.0(4.0)
Soved - min'* (rpm) -
Boost pressure in bar 24
Delivery quantity (2) -
in em¥00 strokes. :
Maximum spread in em? (8)
2 18,5- 20.0(17.5-21.0)
i 7. GOVERNOR CUTTING IN SPEED
Speed min (rpm)
Controt rack travel in mam
1210-1220
Less by 1 mm from full load
control rack travel
While over checking, i the cuting.in speed Is above the
rated speed and if,
- the delivery valuos are within the overchecking tolerance
control rack remains at ful load position even at 60 min
(@pm) less than the rated speed
the cutting. speed should be dectared Ok.
S.IDLING SPEED CONTROL (RATED SPEED)
184?
Control ever position
Speed - min (rpm)
Control rack travel in mm
Speed - min’ (rpm)
Control rack travel in mm
Speed - min (rpm)
Control rack travel in mm
Speed - min (rpm) 55-515
Control rack travel inmm __: 2.0,
8, DEGREE OF IRREGULARITY
‘Speed - mia" (rpm) 1 1290-1260
Control rack travel inmm +: 4.0
No of notches p12
‘9, STARTING TRAVEL
Speed min (rem) + 100
Control rack travel inmm 140-148
6. MAXIMUM SPEED CONTROL (RATED SPEED)
(with supslementary iling spring)
Speed min’ (rpm)
Control rack travel in mm
Speed min (rpm)
Control rack travel in mm
10. STARTING FUEL DELIVERY
Speed - min (rem) aa
Control rack travel in mm
Delivery quantity (2)
in om /500 strokes
-
OTHER INFORMATION :
Element 411 038 468
Dolivery valve 29411 038 578
428 194 019
424 650 005
Flyweight assembly
Governor spring
Note:
1.1. No. of the operations indicate the sequence of operations.
2. Values given in brackets are overchecking values
Adaption capsula
Nozzle
Opening pressure_in bar
9.430084 281
200-208
3. Xs Average of the eylngers
‘Applicable only for BOSCH and MICO test benches:
E0999)
‘These Test spectcations should not be copied or tansmited to a third party without our writen permission, Al rights reserved