You are on page 1of 1

3.

As a design engineer for a grouting scheme of a dam project, the following steps are typically taken to carry out the design of the
grouting:
ANSWER 1. Site Investigation: The first step in designing a grouting scheme is to conduct a site investigation to determine the geological
conditions and characteristics of the site. This includes analyzing soil and rock samples and conducting geophysical surveys to
1. Embankment dams are one of the most common types of dams that are built to impound water. These dams are constructed by identify any potential voids or weaknesses in the foundation.
compacting layers of soil, rock, or other materials to form a barrier that holds back water. The design and analysis of embankment 2. Grout Mix Design: Once the site investigation is complete, the next step is to determine the appropriate grout mix design. This
dams require a thorough understanding of geological and geotechnical factors. Failure to address these factors adequately can involves selecting the type of grout (such as cementitious or chemical), determining the water-cement ratio, and selecting any
lead to catastrophic consequences such as dam failure, loss of life, and property damage. additives that may be required to improve flowability or strength.
Some of the critical geological and geotechnical questions that need to be addressed during the design and analysis of 3. Grouting Pattern: The grouting pattern is then determined based on the results of the site investigation and the grout mix
embankment dams include: design. This includes determining the location and spacing of grout holes, as well as the pressure and volume of grout to be
1. What is the nature and behavior of the foundation soils? injected into each hole.
The foundation soils provide support for the dam structure. It is essential to understand their composition, strength, and 4. Grouting Equipment: The appropriate equipment for injecting grout into the dam foundation is then selected based on factors
deformation characteristics. Failure to adequately investigate the foundation soils can lead to differential settlement, which can such as the depth and diameter of grout holes, the viscosity of the grout mix, and the required injection pressure.
cause cracking and instability in the dam structure. 5. Quality Control: Finally, quality control measures are put in place to ensure that the grouting is performed according to design
2. What is the potential for seepage and piping? specifications. This includes monitoring injection pressures and volumes, conducting post-grouting testing to verify that voids have
Seepage occurs when water flows through the soil beneath or around the dam structure. Piping occurs when seepage erodes soil been filled, and performing periodic inspections during construction to ensure that grouting is being performed correctly.
particles, creating channels that can undermine the dam's stability. It is crucial to assess the potential for seepage and piping
during the design phase and incorporate measures to mitigate these risks. 4. Compacted soils are widely used in civil engineering constructions, such as embankment dams, roadways, and foundations. The
3. What is the potential for liquefaction? water content of compacted soils plays a crucial role in determining their strength and permeability. This is because the water
Liquefaction occurs when saturated soils lose their strength and stiffness due to cyclic loading or seismic activity. This can cause content affects the soil's density, porosity, and interparticle bonding. In this answer, we will discuss the effects of variation of water
significant deformation and settlement in the dam structure, leading to failure. It is essential to evaluate the potential for content on strength and permeability of compacted soils and why dry side compaction is not recommended during construction of
liquefaction during site investigation and incorporate appropriate design measures. embankment dams.
4. What is the potential for landslides? The strength of compacted soils is directly related to their density. The density of a soil depends on its water content during
Landslides can occur due to unstable slopes or weak soil layers within or adjacent to the dam structure. It is crucial to assess the compaction. As the water content increases, the soil becomes more workable, and its density decreases. Conversely, as the water
potential for landslides during site investigation and incorporate appropriate design measures such as slope stabilization content decreases, the soil becomes less workable, and its density increases. The maximum dry density (MDD) of a soil occurs at an
techniques. optimum water content known as the optimum moisture content (OMC). The OMC varies depending on the type of soil and
compaction energy used.
5. What is the seismic hazard? When a soil is compacted at its OMC, it achieves its maximum dry density and maximum strength. If the water content is increased
Seismic activity can cause significant damage to embankment dams. It is essential to evaluate the seismic hazard during site beyond the OMC, the soil's density decreases, resulting in reduced strength. This is because excess water fills up the voids between
investigation and incorporate appropriate design measures to ensure that the dam can withstand seismic forces. soil particles, reducing interparticle bonding and increasing pore pressure. As a result, the soil becomes more compressible and
less resistant to shear stresses. On the other hand, if the water content is decreased below the OMC, the soil's density increases,
2. Weathered rock profile is considered as one of the weak geological features in dam geological/geotechnical investigations. The resulting in reduced workability and increased strength. However, if the water content is too low, the soil becomes brittle and
weathering process weakens the rock mass, which can result in reduced strength and stability of the dam foundation. In particular, prone to cracking.
zone IIA of the weathered rock profile is considered as the most difficult zone from the context of dam geology due to its complex Permeability is another important property of compacted soils that depends on their water content. Permeability refers to a soil's
nature. ability to transmit fluids through its pores. The permeability of a compacted soil increases with increasing water content. This is
Zone IIA is characterized by highly weathered and fractured rocks with varying degrees of strength and stiffness. The degree of because excess water fills up the voids between soil particles, creating interconnected channels for fluid flow. Conversely, as the
weathering can range from moderately to highly weathered rocks, which can pose significant challenges during construction and water content decreases, the soil becomes more compact and less permeable. However, if the water content is too low, the soil
operation of a dam. The presence of fractures and joints in the rock mass further complicates the situation, as they can act as becomes impermeable, hindering fluid flow.
pathways for water flow and increase the risk of seepage and instability. Dry side compaction is a method of compaction where a soil is compacted at a water content below its OMC. This method is not
One possible remedial solution for dealing with zone IIA is to improve the quality of the foundation material by grouting. Grouting recommended during construction of embankment dams because it results in reduced strength and increased permeability. When
involves injecting a cement-based mixture into the rock mass to fill voids, fractures, and joints, thereby improving its strength and a soil is compacted on its dry side, it becomes more brittle and prone to cracking. This is because the interparticle bonding is weak
reducing permeability. However, grouting can be a time-consuming and expensive process, especially in highly fractured rocks. due to lack of lubrication from excess water. Additionally, dry side compaction results in a soil that is more permeable due to the
Another possible solution is to use rock anchors or bolts to stabilize the rock mass. Rock anchors are steel rods or cables that are lack of pore pressure generated by excess water. As a result, water can easily penetrate the soil through cracks and pores, leading
inserted into holes drilled into the rock mass and anchored with grout or resin. They provide additional support to the rock mass to erosion and instability.
and help to prevent sliding or overturning. However, rock anchors may not be effective in highly weathered or fractured rocks
where there is a risk of pullout failure.
A third possible solution is to excavate and replace the weak foundation material with stronger material such as concrete or
compacted soil. This approach may be necessary in cases where grouting or rock anchoring is not feasible due to the nature of the
foundation material.

5. Sand filters are commonly used to prevent seepage through embankment dams. The basic construction procedures for sand filters
involve the following steps:
1. Preparation of foundation: The foundation should be excavated to the required depth and leveled. Any loose or soft material
should be removed, and the surface should be compacted.
2. Placement of filter material: A layer of filter material is placed over the foundation. The thickness of the filter layer depends on
the size and gradation of the filter material, as well as the design requirements. Generally, a thickness of 0.3 to 0.6 meters is used.
3. Compaction of filter material: The filter material is compacted using appropriate equipment such as vibratory rollers or
sheepsfoot rollers. The compaction should be uniform and should achieve the required density.
4. Placement of drain pipes: Drain pipes are placed at regular intervals in the filter layer to collect seepage water and convey it to
downstream outlets.
5. Placement of protective layer: A protective layer is placed over the filter layer to prevent damage from construction equipment
or erosion due to surface runoff.
6. Construction of embankment: The embankment is constructed over the filter layer using suitable materials such as rockfill or
earthfill.7. Placement of topsoil: A layer of topsoil is placed over the embankment to promote vegetation growth and protect
against erosion.

6. (a) A rockfill dam is a type of embankment dam that is constructed using rocks, boulders, and other coarse materials. The essential
components of a rockfill dam are as follows:
1. Foundation: The foundation is the natural ground on which the dam is constructed. It should be strong enough to support the
weight of the dam and must be able to withstand the pressure exerted by the water.
2. Toe: The toe is the downstream part of the dam. It is designed to resist the hydrostatic pressure of the water and prevent
seepage under the dam.
3. Crest: The crest is the top of the dam, which holds back the water. It should be wide enough to accommodate vehicles for
maintenance purposes.
4. Upstream Slope: The upstream slope is the side of the dam that faces the water. It should be designed to prevent erosion and
provide stability to the dam.
5. Downstream Slope: The downstream slope is the side of the dam that faces away from the water. It should be designed to
prevent erosion and provide stability to the dam.
6. Filter Drain: A filter drain is a layer of gravel or sand that is placed downstream of the toe to collect seepage water and discharge
it safely downstream.
7. Drainage System: A drainage system consisting of pipes or channels is installed within the dam to collect seepage water and
discharge it safely downstream.
8. Riprap: Riprap is a layer of large stones or concrete blocks placed on the downstream slope to protect against erosion caused by
waves or currents.
(b) Sluicing refers to a process in which water is used to remove fine particles from coarse materials such as rocks and boulders
during construction. In earlier times, sluicing was necessary in rockfill dam construction because it was difficult to obtain enough
clean and well-graded materials for construction. Sluicing allowed for impurities and finer materials to be washed away, leaving
behind only the desired coarse materials for use in construction.

7. Dam instrumentation refers to the various instruments and monitoring systems used to measure and analyze the behavior and
performance of dams. These instruments are used to detect any potential issues or problems with the dam's structure or operation,
allowing for early intervention and preventative measures to be taken.
During an inspection of an embankment dam, several factors must be watched out for to ensure the safety and stability of the
structure. These include:
1. Seepage - Seepage can occur when water flows through the embankment or foundation of the dam. This can lead to erosion
and instability, potentially causing a breach in the dam.
2. Cracks or deformations - Any cracks or deformations in the dam's structure can indicate potential weaknesses or points of
failure.
3. Vegetation growth - Vegetation growth on or near the dam can indicate excessive moisture, which can weaken the structure
over time.
Water quality testing is also related to dam safety as it can provide important information about the health of a reservoir and any
potential impacts on the dam's structure. Poor water quality can lead to corrosion or erosion of the dam's components, while
excessive sedimentation can reduce storage capacity and increase flood risk.