413E65 01 07 051圣Ⅱ尾水渠退水闸机房结构图3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

剖视图E-E 1:50

剖视图F-F 1:50 渠道边墙 Section views 渠道边墙


Section views Channel walls Channel walls

440
80 400 80

50 15

56

45 20
40 45 270 45 40

45

135
95
95 10 200 60 60
45 35 400 35 45
350

40
360

270
360
50
205

26

40
70
│1411.0 │1411.0
┋1415.50 100 100
71 89

35
15
70

45

45
800
138.3

5 60 15 400 15 60 5
550
276.7
241.7

89 流向
Flow
17.3

12.5 20 61 26
276.7

89 说明:
35

Notes:
17.3

26
26 20 1.图中高程、坐标以米计,结构尺寸以厘米计。
12.5 1.Elevation and coordinate are in meters,but size is marked in centimetres.
流向
138.3

2.金结、机电埋件见相关专业图纸。
Flow 28 28 45 44 2.The embedded parts of steel structures and electromechanical devices
will be shown in relevant professional drawings.
2015

3.闸门安装完后再施工排架柱,固定卷扬机放进机房后,再浇机房顶。
┋1411.0 3.Construction of frame column should be after the installation of sluice gate,
17.5
17.5

12.5 20 12.5 and the roof shold be constructed after the fixed wire rope hoist is placed.
61

EPC总承包商: 中国水利电力对外公司
EPC: CHINA INTERNATIONAL WATER & ELECTRIC CORP.

设计方: 长江勘测规划设计研究有限责任公司
DESIGN:CHANGJIANG SURVEY, PLANNING, DESIGN AND RESEARCH CO., LTD.
校准 APPROVED 施工详图 设计
秘鲁圣加旺Ⅲ水电站 CONSTRUCTION DESIGN
核定 VERIFIED PERU San Gaban Ⅲ 水工 部分
审查 EXAMINED HYDROPOWER PROJECT HYDRAULIC SECTION
校核 CHECKED
圣Ⅱ尾水渠退水闸机房结构图(3/5)
设计 DESIGNED Structure of Hoist Room of Exit
制图 DRAWN Sluice of SG Ⅱ Tailrace Channel(3/5)
日期 DATE 2018.12 比例 SCALE 如图 AS NOTED
设计证号D.C.No. A142000843 图号DRAWING NO. 413E65-01-07-051
声明:未经授权,不得翻印(录)、传播或他用,对于侵权行为将保留追究其法律责任的权利。

You might also like