Shortage of transportation
2 tools to supply the duct Costos elevados de alquiler
Wrong selection of
4 Robo de maquinaria
dampers and plenum boxes
No existencia de personal
Incorrect assembly
6 between two duct pieces calificada en la zona de
ejecución del proyecto
Llegada de materiales de
14 Unsafe handling of the pipe
manera incompleta
Lack of direction
Daño mecánico de la
22 connections (right or left)
for the equipment mezcladora
Power/Chilled/Duct
Dosificación de concreto que no
24 connection might not
sea la correcta
match with the equipment
Logistic difficulties in
shifting the ducts, pipes,
27 Clima inapropiado para fundir
and equipment to the
storage area on the site
Extreme weather
38
conditions
Inappropriate storage of
39 the duct, which might
cause damage to the
Poor protection of the duct
40
after installation
Absence of duct sealant for
41
duct joints
42 Unsafe handling of the duct
Using an un-calibrated
46
pressure gauge
Lack of water supply and
47
drainage for testing RF28
Inappropriate insulation
48 methods
Equipment sizes clash with
49
provided spaces
Inappropriate fixing
50
methods
Lack of accurately sized
51 connecting material
/equipment (valves/
Complicated delivery and
52 inspection procedures
Complicated inspection
53
procedure
Using inappropriate tools
54 or shortage of the tools for
installation
Poor-quality concrete
55
surface
Poor-quality shop and
56
coordination drawings
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
Articulos
4 5 6
Inadequate and/or unclear Sobrecostos derivados de
Payment delays to contractor
details in drawings mayor cantidad de obras
Demoras en la disponibilidad de
Use of primitive/ obselete predios derivados de
Unrealistic contract duration
design technology actividades de gestión predial.
Privado
Sobrecostos por
Change orders due to the
Inadequate safety measures compensaciones socio-
owner
ambientales
Delays of design
Design changes
Failures in design
Project size
Ground conditions
Relocation of underground
utilities
Shortage of labor
Staffing problems
7 8 9
Delay in honouring payment
Weather conditions Earthquake
certificates
Accidents/mistakes during
Improper construction methods construction Revolution
Foundations conditions
Construction methods Political changes
encountered on site
Unrealistic (unreasonable)
Mistakes in soil investigations contract time (duration) & Procurement plan
requirements imposed
Non-adherence of material
acquisition Design error
specifications provided by client
Design Alignment
highway code Absenteeism of laborers availability
Disagreement on design
Unfavourable site conditions Scope vagueness
specifications
Subcontractors
Accidents during construction Unrealistic contract price
Subcontractor quality
Equipment Storage
Maintenance
Mobilization
Site facilities
Site mobilization
Land acquisition
Staff training
Staff availability
Change in organization
Staff teamwork
Staff experience
Consultant experience
Contractor experience
Subcontractor experience
Communication plan
Environmental factors
Environmental Subsurface
conditions
and Geotechnical survey
geotechnical Dewatering
In-accurate survey
Contract terms
Delay in approvals
Conflicts
Productivity
Construction Defective work
Failure of work
Changing need
Rework
Project delay
Claims
10
Environmental pollution
Public opposition
Pre-investment risk
Political opposition/hostility
Legislation change
Low financial attraction of
project to investors
Design deficiency
Unproven engineering
techniques
Delay completion
Non-reliability and
creditworthiness of local
parties
Construction force majeure
events
Insolvency / default of
subcontractor or suppliers
Bad weather
Technology risk
Operator’s inability
Debt risk
Expropriation, revoke,
sequestration of assets
Prolonged downtime during
operation
Transmission failure
N° Riesgo ArtÍculos que lo mencionan
1 Desastres naturales 2, 9
Situaciones de orden
2 5, 9
público/paros
Retraso en la toma de
10 decisiones 4, 9
Retraso en la adquisición de
11 4,6, 7, 8, 9, 10
permisos y licencias.
Diseños y estudios ineficientes
12 1, 4,5,7, 9
o incompletos
Inconvenientes en la
13 4, 6,7, 9,10
adquisición de predios
Indisponibilidad de servicios en
14 1, 2
el sitio
Escasez o partida de mano de
15 1, 3, 4, 7, 8, 9,10
obra especializada
No implementación de un plan
19 1,2,3,4,5,6, 7,8, 9,10
adecuado de control de calidad
Procedimientos inadecuados de
23 trabajo entre diferentes 1,4,5,6,8
disciplinas
27 Oposición de comunidades 2, 5, 6, 7, 8, 10
Variaciones en financiamiento,
29 tasas de cambio, tasas de 2.9
créditos
Planeación y programación
36 ineficiente de las actividades 4,5, 7, 8
del proyecto
Uso de tecnología inapropiada
37 u obsoleta 1, 5, 9, 10
Modificaciones en las
38 especificaciones técnicas y 1,2,3,4, 5,6, 7, 8, 9, 10
alcance del proyecto
Cambios de subcontratistas/
39 5, 8
proveedores
Retraso en entrega de material
40 1,3, 4, 5, 6, 7,8, 9, 10
y equipos
Condiciones climáticas adversas 10
Falta de un plan adecuado de control
10
de calidad
Retraso de pagos 6
Oposición de comunidades 6
Accidentes laborales 4
Problemas contractuales 4
Cambios de subcontratistas/
proveedores 2
Desastres naturales 2