The document contains details of 10 planned maintenance work orders including the work order number, maintenance object name, description of work, planned dates, responsible parties, and other details. Maintenance will include inspection and greasing of equipment like tanks, turbines, hydrants and valves from March 22-24, 2023.
The document contains details of 10 planned maintenance work orders including the work order number, maintenance object name, description of work, planned dates, responsible parties, and other details. Maintenance will include inspection and greasing of equipment like tanks, turbines, hydrants and valves from March 22-24, 2023.
The document contains details of 10 planned maintenance work orders including the work order number, maintenance object name, description of work, planned dates, responsible parties, and other details. Maintenance will include inspection and greasing of equipment like tanks, turbines, hydrants and valves from March 22-24, 2023.
Work order Maintenance object Maintenance object name
104266 19GAD20BB001 CW MAKE-UP AND FFW TANK
104267 19GAD10BB001 POTABLE WATER TANK 104265 13MBA TURBINE,COMPR.ROTOR WITH COMMON CASING 106204 19SGA40AA103 WATER HYDRANT AT FUEL GAS RECEIVING STN 106206 19SGA20AA103 WATER HYDRANT AT EAST SIDE OF STATION 106205 19SGA40AA102 WATER HYDRANT AT FUEL GAS RECEIVING STN 106207 19SGA20AA102 WATER HYDRANT AT EAST SIDE OF STATION 106208 19SGA61AA401 HYDRANT ISOLATION VALVE 106209 18MAJ AIR REMOVAL SYSTEM 106210 18LCE CONDENSATE DESUPERHEATING SPRAY SYSTEM Description Planned start date Planned end date Status Jobtype INSPECTION AND MAINTENANCE OF GRATING 3/22/2023 0:00 3/24/2023 0:00 INI PM INSPECTION AND MAINTENANCE OF GRATING 3/22/2023 0:00 3/24/2023 0:00 INI PM INSPECTION AND MAINTENANCE OF GRATING 3/22/2023 9:00 3/22/2023 17:00 INI PM TO GREASE THE FIRE MONITOR 3/23/2023 0:00 3/23/2023 0:00 INI PM TO GREASE THE FIRE MONITOR 3/23/2023 0:00 3/23/2023 0:00 INI PM TO GREASE THE FIRE MONITOR 3/23/2023 8:00 3/23/2023 17:00 INI PM TO GREASE THE FIRE MONITOR 3/23/2023 8:00 3/23/2023 17:00 INI PM TO GREASE THE FIRE MONITOR 3/23/2023 8:00 3/23/2023 17:00 INI PM VALVES STEM REGREASING 6M 3/24/2023 9:00 3/24/2023 17:00 INI PM VALVES STEM REGREASING 6M 3/24/2023 9:00 3/24/2023 17:00 INI PM Planning Status Planning window IPG P Position key Jobcode Responsible No 4 19GAD20BB001 50 RUN/NO RISK 1.1.03.200 No 4 19GAD10BB001 50 RUN/NO RISK 1.1.03.200 No 4 13MBA 50 RUN/NO RISK 1.1.03.200 No 4 19SGA40AA103 50 RUN/NO RISK 1.1.03.200 No 4 19SGA20AA103 50 RUN/NO RISK 1.1.03.200 No 4 19SGA40AA102 50 RUN/NO RISK 1.1.03.200 No 4 19SGA20AA102 50 RUN/NO RISK 1.1.03.200 No 4 19SGA61AA401 50 RUN/NO RISK 1.1.03.200 No 4 18MAJ 50 RUN/NO RISK 1.1.03.200 No 4 18LCE 50 RUN/NO RISK 1.1.03.200 Work suppliers Skipped Rel.Delay Abs.Delay Approval status Planned hours Extra WO info 1.1.03.211 0 0% -1 2 1.1.03.208 0 0% -1 2 1.1.03.212 0 0% -1 2 1.1.03.205 0 -1% -2 2 1.1.03.205 0 -1% -2 1 1.1.03.214 0 -1% -2 2 1.1.03.214 0 -1% -2 1 1.1.03.214 0 -1% -2 2 1.1.03.208/1.1.03.211 0 -2% -3 4 1.1.03.208/1.1.03.211 0 -2% -3 4 Extra WO info2 Extra WO info3 Extra WO info4 Extra WO info5 Rel.Delay Org.Date Abs.Delay Org.Date 0% -1 0% -1 0% -1 -1% -2 -1% -2 -1% -2 -1% -2 -1% -2 -2% -3 -2% -3 Original Start Date Ordered by Finish responsible Guaranty expire date 3/22/2023 Senior Mech Eng 3/22/2023 Senior Mech Eng 3/22/2023 Senior Mech Eng 3/23/2023 Mechanical Enginee 3/23/2023 Mechanical Enginee 3/23/2023 Mechanical Enginee 3/23/2023 Mechanical Enginee 3/23/2023 MECH ENGR 3/24/2023 MECH SECT 3/24/2023 MECH SECT