Design & Construction of
Freshwater Pond Farms
2
Estimating Earthwork Requirements
BW Dc
3
Sample Computation
o Given the following, compute for the total volume of dike fill and total
volume of excavation
o 10 m
Pond 1 2 3 4 25 m
1.5 m
1
1.2 m 20 cm
1.5
4
Solution