Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Form No.

7-Star-Engineering
7STAR ENGINEERING KINETICS (PVT) LTD. Indent # 3
Date 10-Jun-23
Material Indent Report Tool For Site Project Bulleh Shah Packages
Project Code BPC-7059
QUANTITY
SR. NO. ITEM DESCRIPTION UNIT PURPOSE ARRANGE FROM REMARKS
PLAN MOBILIZE AVAILABLE REQUIRED APPROVED DISPATCH RECEIVED PENDING

1 Cable 3core 110/76 Roll 1


2 Earth Wair 2mm Roll 1
3 Cable 2core 23/76 Mtr 40 For Padistal Fan (Camp)
4 Resaptical 16amp Pair 10
5 Pvc tape Nos 10
6 Shoe 2pin Nos 10 For Padistal Fan (Camp)
7 Concrete Gloves pair 4
8 Face Sheld Nos 2
9 Air Pump Nos 1 For Wheel Barrow&Bicycle
10 Jack for Concrete Machine Nos 1
11 Co² Cylinder Nos 2
General Comments:

Prepared By Verified By Approved By


Ali Raza

You might also like