FOOTING TIE BEAM FOR CONTROL BUILDING

CUTTING LIST (BAR BENDING SCHEDULE)


Rebar Code Bar Diameter Quantity a b c d e Total Length (mm) Unit Wt.(kg/m) Total Weight (kg) Remarks
A 20mm 32.00 6900 300 7500 2.466 591.84 FTB-1 main bars
B 20mm 80.00 5900 300 6500 2.466 1,282.32 FTB-1 main bars
C 20mm 16.00 4900 300 5500 2.466 217.01 FTB-1 main bars
D 20mm 16.00 3900 300 4500 2.466 177.55 FTB-1 main bars
E 20mm 16.00 6400 300 7000 2.466 276.19 FTB-1 main bars
F 20mm 16.00 5400 300 6000 2.466 236.74 FTB-1 main bars
G 20mm 40.00 1900 300 2500 2.466 246.60 FTB-1 main bars
H 10mm 1,120.00 300 200 70 700 0.888 696.192 FTB-1 stirrups
GRAND TOTAL WEIGHT (kg) 3,724.44

SUMMARY

BAR DIAMETER BAR STANDARD LENGTH (meters) QTY. UNIT Unit Wt.(kg/m) Total Weight (kg)
20mm 7.5 142.00 PCS 2.466 2,626.29
20mm 6 48.00 PCS 2.466 710.21
10mm 6 224.00 PCS 0.888 1,193.47
GRAND TOTAL WEIGHT (kg) 4,529.97

BAR
A,B,C,D,E,F,
G

BAR H

Prepared By: Checked By:

Engr. Ivan Daniel C. Acain Engr. Benny B. Sedicos


HTCI - PE MDC-PM_Isabel SS

Engr. Kevin Russel B. Carvajal


HTCI - PE
REFERENCE DRAWING