Scenario No.

Scenario Name
Brief Description of the Scenario
Created By
Changed By

Step No. Description of the Step SAP T-Code

Production Order Creation:


1 CO01
till Scheduling

Production Order Creation:


2 CO01
Material Availability Check

3 Release Production Order CO01/CO02


Confirmation of Order with
4 CO11N
incorrect yield

Confirmation of Order with


5 CO11N
yield

Confirmation of Order with


6 CO11N
Goods Movement

Confirmation of Target
7 CO11N
Products/Coproducts

8 Component Consumption CO11N

9 Confirmation of Byproducts CO11N


10 Confirmation of Activities CO11N

"TECO" Poduction Orders in


12 COHV
Mass

13 Production Order Info System COOIS

Production Report (Single


14 ZPP01
material- date wise)

Production Report (Multiple


15 material- For a 1 month ZPP02
period)

16 Batch Stock Report ZPP03

17 Stock Overview MMBE


UT_P
Discrete Manufa
This scenario deals with the steps involved in th
Created On
Changed On

Input Data

Material, Plant, Order Type in first screen. Next input the Total
Quantyto be produced. Enter the End Date. Press EnterChoose
Production Version from the auto popup.

After Scheduling is done click on "Material" icon at the header(Ctrl+F4).

Once Scheduling done and component are available, click on "Release"


icon(Ctrl+F1). Once it is done Save order.
Input Order in the input field. Press Enter. Check Yield. It will be fetched
from Production Order. You can reduce the yield if you feel. In that case
message will be populated that Activities and Components are recalculated.
Error will be displayed iif Yield more than that maintained in Production
Order is inputted.

Input Order in the input field. Press Enter. Check Yield. It will be fetched
from Production Order. You can reduce the yield if you feel. In that case
message will be populated that Activities and Components are recalculated.
Change Posting Date as desired

After Yield is confirmed click on "Goods Movement" tab. All components,


byproducts, target goods will be displayed with the respective movement
types(101 for Target Products/Coproducts, 261 for Components, 531 for
Byproducts)

In the Goods Movement tab Target Product/Coproduct will come. Storage


location will come if maintained in Production Storage location in
Material Master. Else input the location. Auto batch will be populated based
on day of production and material group

In the Goods Movement tab Components will come against 261. Storage
location will come if maintained in Production Storage location in
Material Master. Else input the location. Batch,if applicable, to be selected
manually. Press F4 in the batch field. Existing batch will be displayed with
Unrestricted Stock quantities and also Characteristics display. Select
suitable batch in accordance. The quantity consumption is not editable.Auto
GI will take place upon saving the production order for the raw material
components as a result of backfulsh

In the Goods Movement tab Byproduct will caome. Storage location will
come if maintained in Production Storage location in Material Master.
Else input the location. Quantity to be generated will be in accordance to
BOM. Can be edited if required.Auto GR eill take place upon saving
production order for generated byproducts
Will be fetched from Routing, in accordance to Yield inserted. No change to
be done. Change Posting Date as desired. Click on "Save"

Give Production Plant, Order Type, Syst. Status=DLV. Exclude


Syst. Status=TECO by checking the tick box. Click on "Mass
Processing" tab, select Function as Technically Complete. Press F8.
Next Select all Production Orders.Press F8.

Give Production Plant, Order Type. From List select Order Headers,
Components, Automatic Goods Movemnt, in sequence. Press F8

Enter the following in the selection screen:


Material:
Plant:
Posting Date:

Enter the following in the selection screen:


Material:
Plant:
Posting Date:

Enter the following in the selction screen:


Material:
Plant:
Batch:
Posting Date:
Class:

Enter the following data after clicking on the MMBE Tcode

Material:
Plant:
Storage Location:
Batch:

* Apart from material code all the other fields are optional.
UT_P8_A
Discrete Manufacturing Process
This scenario deals with the steps involved in the production through Discrete Manufacturing

Checks/Controls/Enhancements

Order Type should be assigned in respective plant.


Following Order Types are valid: ZPAC for 6601;

If materials are not available then Release is


restricted. So if Materials are not available save
order and exit screen without Releasing.
Auto batch population if batch applicable

Non editable quantity is through


enhancement.
The material field is mandatory. If material code is
not given system will show an error.

ERROR MESSAGE: "Generic searches are not


allowed"
UT_P8_A
e Manufacturing Process
lved in the production through Discrete Manufacturing

Expected Results

Compile

ok

ok
No message if Yield=Production Order quantity

Ok
Confirmation messages regarding successful Goods
Movements

The desired report output will be displayed

The system displays the current stock of the desired material


code for the desired company code/plant/storage location
combination.
Remarks
Actual Results Module

PP

PP

PP
PP

PP

PP

PP

PP

PP
PP

PP

PP

PP

PP

PP

PP