MTL Power Vs P+F Power Hub R1
MTL Power Vs P+F Power Hub R1
Supply/Conditioner
Comparison
Maximum sets per 2000H x 18 sets ( 144 20 to 26 sets ( 80 - 104 segments/cabinet) 22 to 30 sets ( 88 - 120
800D x 800W Panel at 63A segments/cabinet), segments/cabinet), 40 sets possible
bulk PSU limited by PSU rating
Diagnostic Yes Yes No
Fail Alarm contact Yes Yes Yes
Product availability Q3 2005 Q3 2005 ? since 2003
Diagnostic Module Yes Q3 for fail alarm Q1 2006 ? N.A
availability contact, full feature
diagnostic available Q1
2006 and can be just
plug into existing carrier
Aramco Approval Pending testing with not used in any major installation, not known Approved and used on Jeddah
Aramco by end July 05 running site Refinery. FPS-I used on Qatif, Zuluf
GOSP 2 + other Aramco projects
Installed base in Aramco N.A N.A Jeddah Refinery - 41 segments,
Qatif - 236 segments, Zuluf GOSP 2 -
145 segments
Design base on with Aramco not known Shell/Yokogawa
feedback/requirements