Important Quality Control Works in Roads

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Important quality control works in Roads

and Bridges
Embankment
 Selection of material and its testing.
 Compaction stabilization.

Sub Grade
 Selection of material based on CBR.
 Compaction.

Sub Base
 Selection of material and gradation.
 Laying and compaction of GSB.

Base course (WMM/WBM)


 Selection of material and gradation (Mix Design)
 Plant operation
 Laying of WMM

Bituminous base course


(DBM, BSG.BBM)

 Mix design and gradation.


 Stability of mix and plant operations
 Laying and compaction

Wearing surface
 Gradation and plant operation
 Laying and compaction

Miscellaneous
 Roadside drainage
 Road furniture
Type of works
Resurfacing work
 Treatment to existing surface to receive new treatment.
 Side shoulder construction

Strengthening work
 Evaluation of existing surface
 FWD/BBD
 Side shoulder construction

Widening work
 Box cutting
 Compaction of pavement layers

You might also like