PROJECT - MEP WORKS, CHIREC INTERNATIONAL SCHOOL , HYDERABAD (13.05.

2023)

Total No of No of GFC Drawing GFC Drawings


S.No Discipline Submitted Yet to submit Approved Waiting For Approval Resubmission Remarks
Dwgs Received Yet to receive

1 FPS 22 21 0 21 1 21 0 0

2 ELV 30 28 0 26 4 26 0 0 Sports block schematic drawing

3 HVAC 15 14 0 14 1 14 0 0

MSLD & Main Electrical room


4 ELE 49 49 0 47 2 46 1 0 Pending, Awaiting for Panel GA
Drawing approval

5 PHE 25 23 0 24 1 20 4 0

Total Drawings 141 135 0 132 9 127 5 0


FPS - DRAWING TRACKER
Dt - 20.04.2023
CLIENT NAME: M/s. KAMALASANA PROPERTIES & SERVICES PRIVATE LIMITED
PROJECT NAME: M/s. CHIREC INTERNATIONAL SCHOOL
LOCATION: HYDERABAD
DESIGN CONSULTANT: E-SOLLUTIONS CONSULTANCY PVT LTD
FPS CONTRACTOR: Micron Electricals

SUMMARY DRAWING STATUS


Total Drawings 22 Approved A
GFC Received 21 Approved with Comments B
Yet to receive revised GFC 0 Revise and Resubmit C
Submitted Drawings 21 Rejected D
Approved Drawings 21 Under Review U
Under Review Drawings 0
Revise / Resubmission 0
To be Submitted 1

SCHOOL BUILDING
Shop Drawings Submission / Approved With
Sl No. Drawing Name GFC Drawing No Rev GFC Received Date Shop Drawing No Rev Resubmission Date Comments/ Remarks
Planned Actual Date Status

1 LAYOUT OF FIRE HYDRANT & SPRINKLER SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-FPS-GF-04 - 29.10.2022 R0 09.01.2023 MH22-0072-CHIREC-SB-FPS-001 R0 19.01.2023 19.01.2023 20.01.2023 B

2 LAYOUT OF FIRE HYDRANT & SPRINKLER SYSTEM FOR FOR 1ST FLOOR KPSPL-CHIREC-AB-FPS-FF-04-12.11.2022 R0 16.01.2023 MH22-0072-CHIREC-SB-FPS-002 R0 24.01.2023 24.01.2023 15.02.2023 B

3 LAYOUT OF FIRE HYDRANT & SPRINKLER SYSTEM FOR 2ND FLOOR KPSPL-CHIREC-AB-FPS-2F-04 - 9.11.2022 R0 21.01.2023 MH22-0072-CHIREC-SB-FPS-003 R0 28.01.2023 28.01.2023 04.04.2023 B

KPSPL-CHIREC-AB-RCP-3F- 09.11.2022 C
R0 27.01.2023 MH22-0072-CHIREC-SB-FPS-004 R0 01.02.2023 01.02.2023 02.02.2023 REVISED GFC RECEIVED AS ON 02.02.2023
4 LAYOUT OF FIRE HYDRANT & SPRINKLER SYSTEM FOR 3RD FLOOR
KPSPL-CHIREC-AB-RCP-3F- 09.11.2022
R1 02.02.2023 MH22-0072-CHIREC-SB-FPS-004 R1 03.02.2023 A

ES-COG-MB-SS-4F-FPS-422 - 10.10.2022 B
5 LAYOUT OF FIRE HYDRANT & SPRINKLER SYSTEM FOR 4TH FLOOR R2 02.02.2023 MH22-0072-CHIREC-SB-FPS-005 R0 06.02.2023 06.02.2023 04/04/2023

ES-COG-MB-SS-5F-FPS-426 -07.02.2023 B
6 LAYOUT OF FIRE HYDRANT & SPRINKLER SYSTEM FOR 5TH FLOOR 17.02.2023 MH22-0072-CHIREC-SB-FPS-006 R0 21.02.2023 21.02.2023 02.03.2023

7 LAYOUT OF FIRE HYDRANT SYSTEM FOR TERRACE FLOOR ES-COG-MB-SS-GF-FPS-427 - 11.02.2023 17.02.2023 MH22-0072-CHIREC-SB-FPS-007 R0 21.02.2023 21.02.2023 02.03.2023 B

12.12.2022 R0 30.12.2022 30.12.2022 07.01.2023 C


09.01.2023 R1 10.01.2023 11.01.2023 C REVISED GFC RECEIVED AS ON 11.01.2023
8 LAYOUT OF EXTERNAL FIRE HYDRANT & EXTINGUISHERS SYSTEM FOR SITE PLAN KPSPL-CHIREC-ED-YH-02-R0-20.10.2022 MH22-0072-CHIREC-SB-FPS-008
R2 13.01.2023 A

LAYOUT OF FIRE FIGHTING PUMP ROOM


9 Received 23.03.2023 MH22-0072-CHIREC-SB-FPS-009 31.03.2023 Not Submit

10 LAYOUT OF FIRE EXTINGUISHERS & SIGNAGES SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-FE&SIG-GF-02 -29.10.2022 09.01.2023 MH22-0072-CHIREC-SB-FPS-010 R0 03.03.2023 03.03.2023 04.04.2023 B

11 LAYOUT OF FIRE EXTINGUISHERS & SIGNAGES SYSTEM FOR 1ST FLOOR KPSPL-CHIREC-AB-FE&SIG-FF-02 -12.11.2022 16.01.2023 MH22-0072-CHIREC-SB-FPS-011 R0 03.03.2023 03.03.2023 04.04.2023 B

12 LAYOUT OF FIRE EXTINGUISHERS & SIGNAGES SYSTEM FOR 2ND FLOOR KPSPL-CHIREC-AB-FE&SIG-2F-02 - 09.11.2022 21.01.2023 MH22-0072-CHIREC-SB-FPS-012 R0 03.03.2023 03.03.2023 04.04.2023 B

13 LAYOUT OF FIRE EXTINGUISHERS & SIGNAGES SYSTEM FOR 3RD FLOOR KPSPL-CHIREC-AB-FE&SIG-3F-02 -09.11.2022 02.02.2023 MH22-0072-CHIREC-SB-FPS-013 R0 03.03.2023 03.03.2023 04.04.2023 B

ES-COG-MB-SS-4F-FPS-422-10.10.2022 B
14 LAYOUT OF FIRE EXTINGUISHERS & SIGNAGES SYSTEM FOR 4TH FLOOR 02.02.2023 MH22-0072-CHIREC-SB-FPS-014 R0 03.03.2023 03.03.2023 04.04.2023

ES-COG-MB-SS-5F-FE&SIG-424-07.02.2023 B
15 LAYOUT OF FIRE EXTINGUISHERS & SIGNAGES SYSTEM FOR 5TH FLOOR 17.02.2023 MH22-0072-CHIREC-SB-FPS-015 R0 03.03.2023 03.03.2023 04.04.2023
PARKING BUILDING
ES-COG-CB-SS-GF-FPS-432 B
16 LAYOUT OF FIRE SPRINKLER SYSTEM FOR GROUND FLOOR 24.02.2023 MH22-0072-CHIREC-PB-FPS-016 R0 10.03.2023 23.03.2023 26/03/2023

17 LAYOUT OF FIRE SPRINKLER SYSTEM FOR MEZZANINE FLOOR ES-COG-CB-SS-MF-FPS-437-13.09.2022 24.02.2023 MH22-0072-CHIREC-PB-FPS-017 R0 10.03.2023 23.03.2023 26/03/2023 B Avoid too many bends take pipe straight

18 LAYOUT OF FIRE HYDRANT, EXTINGUISHER & SIGNAGES SYSTEM FOR GROUND FLOOR ES-COG-CB-SS-GF-FE&SIG-429-R1-12.09.2022 24.02.2023 MH22-0072-CHIREC-PB-FPS-018 R0 10.03.2023 08.03.2023 11.03.2023 B

19 LAYOUT OF FIRE HYDRANT, EXTINGUISHER & SIGNAGES SYSTEM FOR MEZZANINE FLOOR ES-COG-CB-SS-MF-FE&SIG-435-R1-12.09.2022 24.02.2023 MH22-0072-CHIREC-PB-FPS-019 R0 10.03.2023 08.03.2023 11.03.2023 B

20 LAYOUT OF SPRINKLER SYSTEM FOR DECK FLOOR ES-COG-CB-SS-DF-FPS-437-R1-13.09.2022 24.02.2023 MH22-0072-CHIREC-PB-FPS-020 R0 10.03.2023 23.03.2023 26.03.2023 A

ES-COG-CB-SS-SD-FE&SIG-440
21 LAYOUT OF FIRE EXTINGUISHER & SIGNAGES SYSTEM FOR DECK FLOOR 24.02.2023 MH22-0072-CHIREC-PB-FPS-021 R0 10.03.2023 08.03.2023 11.03.2023 B
-R1-13.09.2022

22 FIRE FIGHTING SYSTEM SCHEMATIC DIAGRAM-SCHOOL BUILDING & PARKING BUILDING Received 26.03.202 MH22-0072-CHIREC-PB-FPS-022 31.03.2023 03.04.2023 A
ELV- DRAWING TRACKER
Dt - 07.04.2023
CLIENT NAME: M/s. KAMALASANA PROPERTIES & SERVICES PRIVATE LIMITED

PROJECT NAME: M/s. CHIREC INTERNATIONAL SCHOOL

LOCATION: HYDERABAD
DESIGN CONSULTANT: E-SOLLUTIONS CONSULTANCY PVT LTD

MEP CONTRACTOR: Micron Electricals

SUMMARY DRAWING STATUS


Total Drawings 34 Approved A
GFC Received 28 Approved with Comments B
Yet to receive revised GFC 0 Revise and Resubmit C
Submitted Drawings 30 Rejected D
Approved Drawings 10 Under Review U
Under Review Drawings 14
Revise / Resubmission 1
To be Submitted 4

SCHOOL BUILDING
Sl No. Drawing Name GFC Drawing No Rev GFC Received Date Shop Drawing No Rev Planned Date Actual Date Status Remarks
ADDRESSABLE FIRE ALARM SYSTEM

1 ADDRESSABLE FIRE ALARM SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-FAPA-GF-01 R0 08/01/2023 MH22-0072-CHIREC-SB-FAS-001 25.01.2023 C
02.02.2023 U

2 ADDRESSABLE FIRE ALARM SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-FAPA-FF-01 R0 14/01/2023 MH22-0072-CHIREC-SB-FAS-002 07.02.2023 U

3 ADDRESSABLE FIRE ALARM SYSTEM FOR SECOND FLOOR KPSPL-CHIREC-AB-FAPA-2F-01 R0 19.01.2023 MH22-0072-CHIREC-SB-FAS-003 11.02.2023 U

4 ADDRESSABLE FIRE ALARM SYSTEM FOR 3RD FLOOR KPSPL-CHIREC-AB-FAPA-3F-01 R0 27.01.2023 MH22-0072-CHIREC-SB-FAS-004 04.03.2023 07.03.2023 U
KPSPL-CHIREC-AB-FAPA-3F-01 R0 02.02.2023

5 ADDRESSABLE FIRE ALARM SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-4F-FAPA-419 R0 01.02.2023 MH22-0072-CHIREC-SB-FAS-005 04.03.2023 07.03.2023 U
ES-COG-MB-SS-4F-FAPA-419 R0 02.02.2023

6 ADDRESSABLE FIRE ALARM SYSTEM FOR 5TH FLOOR ES-COG-MB-SS-5F-FAPA-423 R0 13.02.2023 MH22-0072-CHIREC-SB-FAS-006 11.03.2023 07.03.2023 U

PUBLIC ADDRESS SYSTEM

1 PUBLIC ADDRESS SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-FAPA-GF-01 R0 08/01/2023 MH22-0072-CHIREC-SB-PAS-001 25.01.2023 C
02.02.2023 U
2 PUBLIC ADDRESS SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-FAPA-FF-01 R0 14/01/2023 MH22-0072-CHIREC-SB-PAS-002 11.02.2023 U

3 PUBLIC ADDRESS SYSTEM FOR SECOND FLOOR KPSPL-CHIREC-AB-FAPA-2F-01 R0 19.01.2023 MH22-0072-CHIREC-SB-PAS-003 04.03.2023 10.03.2023 U

4 PUBLIC ADDRESS SYSTEM FOR 3RD FLOOR KPSPL-CHIREC-AB-FAPA-3F-01 R0 27.01.2023 MH22-0072-CHIREC-SB-PAS-004 06.03.2023 14.03.2023 U
KPSPL-CHIREC-AB-FAPA-3F-01 R0 02.02.2023 REVISED GFC RECEIVED AS ON 02.02.2023

5 PUBLIC ADDRESS SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-4F-FAPA-419 R0 01.02.2023 MH22-0072-CHIREC-SB-PAS-005 08.03.2023 14.03.2023 U
ES-COG-MB-SS-4F-FAPA-419 R0 02.02.2023 REVISED GFC RECEIVED AS ON 02.02.2023

6 PUBLIC ADDRESS SYSTEM FOR 5TH FLOOR ES-COG-MB-SS-5F-FAPA-423 R0 13.02.2023 MH22-0072-CHIREC-SB-PAS-006 09.03.2023 15.03.2023 A APPROVED ON 17.03.2023

WATER LEAK DETECTION SYSTEM

1 WATER LEAK DETECTION SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-WLD-GF-06 R0 08/01/2023 MH22-0072-CHIREC-SB-WLD-001 28.01.2023 A

2 WATER LEAK DETECTION SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-WLD-FF-06 R0 14/01/2023 MH22-0072-CHIREC-SB-WLD-002 28.01.2023 A

3 WATER LEAK DETECTION SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-GF,1F&4F-WLD-406 R0 02.02.2023 MH22-0072-CHIREC-SB-WLD-003 07.02.2023 U

RODENT REPELLENT SYSTEM

1 RODENT REPELLENT SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-RRS-GF-05 R0 08/01/2023 MH22-0072-CHIREC-SB-RRS-001 25.01.2023 C
02.02.2023 U

2 RODENT REPELLENT SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-WLD-FF-05 R0 14/01/2023 MH22-0072-CHIREC-SB-RRS-002 28.01.2023 A

3 RODENT REPELLENT SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-GF,1F&4F-RRS-405 R0 02.02.2023 MH22-0072-CHIREC-SB-RRS-003 07.02.2023 U

SPORTS DECK BLOCK -ADDRESSABLE FIRE ALARM SYSTEM

1 ADDRESSABLE FIRE ALARM SYSTEM FOR SPORTS DECK CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-001 17.03.2023 25.03.2023 B 3/29/2023

2 ADDRESSABLE FIRE ALARM SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-002 16.03.2023 16.03.2023 D 3/17/2023

3 ADDRESSABLE FIRE ALARM SYSTEM FOR MEZZANNINE FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-003 20.03.2023

SPORTS DECK BLOCK -PUBLIC ADDRESS SYSTEM

1 PUBLIC ADDRESS SYSTEM FOR SPORTS DECK CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-001 17.03.2023 25.03.2023 B 3/29/2023

2 PUBLIC ADDRESS SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-002 17.03.2023 25.03.2023 B 3/29/2023

3 PUBLIC ADDRESS SYSTEM FOR MEZZANNINE FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-003 20.03.2023 25.03.2023 B 3/29/2023

SPORTS DECK BLOCK-RODENT REPELLENT SYSTEM

1 RODENT REPELLENT SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-RRS-001 17.03.2023 B 3/21/2023

SPORTS DECK BLOCK-WATER LEAK DETECTION SYSTEM

1 WATER LEAK DETECTION SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-WLD-001 17.03.2023 B 3/21/2023

SCHEMATIC DRAWING

SCHOOL BUILDING
AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
1 ADDRESSABLE FIRE ALARM SYSTEM-SCHEMATIC MH22-0072-CHIREC-SB-FAS-SCH-001 SUBMIT THE SCHEMATIC

PUBLIC ADDRESS SYSTEM- SCHEMATIC AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
2 19.01.2023 MH22-0072-CHIREC-SB-PAS-SCH-001 SUBMIT THE SCHEMATIC

WATER LEAK DETECTION SYSTEM-SCHEMATIC AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
3 MH22-0072-CHIREC-SB-WLD-SCH-001 SUBMIT THE SCHEMATIC

AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL


4 RODENT REPELLENT SYSTEM -SCHEMATIC MH22-0072-CHIREC-SB-RRS-SCH-001 SUBMIT THE SCHEMATIC

SPORTS BLOCK
AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
1 ADDRESSABLE FIRE ALARM SYSTEM-SCHEMATIC MH22-0072-CHIREC-SD-FAS-SCH-001 SUBMIT THE SCHEMATIC

PUBLIC ADDRESS SYSTEM-SCHEMATIC AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
2 19.01.2023 MH22-0072-CHIREC-SD-PAS-SCH-001 SUBMIT THE SCHEMATIC

WATER LEAK DETECTION SYSTEM-SCHEMATIC AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
3 MH22-0072-CHIREC-SD-WLD-SCH-001 SUBMIT THE SCHEMATIC

AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL


4 RODENT REPELLENT SYSTEM -SCHEMATIC MH22-0072-CHIREC-SD-RRS-SCH-001 SUBMIT THE SCHEMATIC
ELV- DRAWING TRACKER
Dt - 27.04.2023
CLIENT NAME: M/s. KAMALASANA PROPERTIES & SERVICES PRIVATE LIMITED
PROJECT NAME: M/s. CHIREC INTERNATIONAL SCHOOL
LOCATION: HYDERABAD
DESIGN CONSULTANT: E-SOLLUTIONS CONSULTANCY PVT LTD
MEP CONTRACTOR: Micron Electricals

SUMMARY DRAWING STATUS


Total Drawings 30 Approved A
GFC Received 28 Approved with Comments B
Yet to receive revised GFC 0 Revise and Resubmit C
Submitted Drawings 26 Rejected D
Approved Drawings 26 Under Review U
Under Review Drawings 0
Revise / Resubmission 0
To be Submitted 4

SCHOOL BUILDING
Sl No. Drawing Name GFC Drawing No Rev GFC Received Date Shop Drawing No Rev Planned Date Actual Date Status Remarks
ADDRESSABLE FIRE ALARM SYSTEM

1 ADDRESSABLE FIRE ALARM SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-FAPA-GF-01 R0 08/01/2023 MH22-0072-CHIREC-SB-FAS-001 25.01.2023 C
R1 02.02.2023 A 03.02.2023 Approved Date

2 ADDRESSABLE FIRE ALARM SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-FAPA-FF-01 R0 14/01/2023 MH22-0072-CHIREC-SB-FAS-002 07.02.2023 A

3 ADDRESSABLE FIRE ALARM SYSTEM FOR SECOND FLOOR KPSPL-CHIREC-AB-FAPA-2F-01 R0 19.01.2023 MH22-0072-CHIREC-SB-FAS-003 11.02.2023 A

4 ADDRESSABLE FIRE ALARM SYSTEM FOR 3RD FLOOR KPSPL-CHIREC-AB-FAPA-3F-01 R0 27.01.2023 MH22-0072-CHIREC-SB-FAS-004 04.03.2023 07.03.2023 A
KPSPL-CHIREC-AB-FAPA-3F-01 R0 02.02.2023

5 ADDRESSABLE FIRE ALARM SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-4F-FAPA-419 R0 01.02.2023 MH22-0072-CHIREC-SB-FAS-005 04.03.2023 07.03.2023 B
ES-COG-MB-SS-4F-FAPA-419 R0 02.02.2023

6 ADDRESSABLE FIRE ALARM SYSTEM FOR 5TH FLOOR ES-COG-MB-SS-5F-FAPA-423 R0 13.02.2023 MH22-0072-CHIREC-SB-FAS-006 11.03.2023 07.03.2023 A

PUBLIC ADDRESS SYSTEM

1 PUBLIC ADDRESS SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-FAPA-GF-01 R0 08/01/2023 MH22-0072-CHIREC-SB-PAS-001 25.01.2023
R1 07.04.2023 B
2 PUBLIC ADDRESS SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-FAPA-FF-01 R0 14/01/2023 MH22-0072-CHIREC-SB-PAS-002 11.02.2023
R1 07.04.2023 B
3 PUBLIC ADDRESS SYSTEM FOR SECOND FLOOR KPSPL-CHIREC-AB-FAPA-2F-01 R0 19.01.2023 MH22-0072-CHIREC-SB-PAS-003 04.03.2023 10.03.2023 A
R1 07.04.2023
4 PUBLIC ADDRESS SYSTEM FOR 3RD FLOOR KPSPL-CHIREC-AB-FAPA-3F-01 R0 27.01.2023 MH22-0072-CHIREC-SB-PAS-004 06.03.2023 14.03.2023 A
KPSPL-CHIREC-AB-FAPA-3F-01 R0 02.02.2023 REVISED GFC RECEIVED AS ON 02.02.2023
R1

5 PUBLIC ADDRESS SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-4F-FAPA-419 R0 01.02.2023 MH22-0072-CHIREC-SB-PAS-005 08.03.2023 14.03.2023
ES-COG-MB-SS-4F-FAPA-419 R1 02.02.2023 07.04.2023 B REVISED GFC RECEIVED AS ON 02.02.2023

6 PUBLIC ADDRESS SYSTEM FOR 5TH FLOOR ES-COG-MB-SS-5F-FAPA-423 R0 13.02.2023 MH22-0072-CHIREC-SB-PAS-006 09.03.2023 15.03.2023 B APPROVED ON 17.03.2023

WATER LEAK DETECTION SYSTEM

1 WATER LEAK DETECTION SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-WLD-GF-06 R0 08/01/2023 MH22-0072-CHIREC-SB-WLD-001 28.01.2023 A

2 WATER LEAK DETECTION SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-WLD-FF-06 R0 14/01/2023 MH22-0072-CHIREC-SB-WLD-002 28.01.2023 A

3 WATER LEAK DETECTION SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-GF,1F&4F-WLD-406 R0 02.02.2023 MH22-0072-CHIREC-SB-WLD-003 07.02.2023 A

RODENT REPELLENT SYSTEM

1 RODENT REPELLENT SYSTEM FOR GROUND FLOOR KPSPL-CHIREC-AB-RRS-GF-05 R0 08/01/2023 MH22-0072-CHIREC-SB-RRS-001 25.01.2023 C
02.02.2023 A 03.02.2023 Approved Date

2 RODENT REPELLENT SYSTEM FOR FIRST FLOOR KPSPL-CHIREC-AB-WLD-FF-05 R0 14/01/2023 MH22-0072-CHIREC-SB-RRS-002 28.01.2023 A

3 RODENT REPELLENT SYSTEM FOR 4TH FLOOR ES-COG-MB-SS-GF,1F&4F-RRS-405 R0 02.02.2023 MH22-0072-CHIREC-SB-RRS-003 07.02.2023 A

SPORTS DECK BLOCK -ADDRESSABLE FIRE ALARM SYSTEM

1 ADDRESSABLE FIRE ALARM SYSTEM FOR SPORTS DECK CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-001 17.03.2023 29.03.2023 C
07.04.2023 B
2 ADDRESSABLE FIRE ALARM SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-002 16.03.2023 17.03.2023 C
07.04.2023 A
3 ADDRESSABLE FIRE ALARM SYSTEM FOR MEZZANNINE FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-003 20.03.2023 18.03.2023 A 17.03.2023 Approved Date

SPORTS DECK BLOCK -PUBLIC ADDRESS SYSTEM


1 PUBLIC ADDRESS SYSTEM FOR SPORTS DECK CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-001 17.03.2023 24.03.2023 A 17.03.2023 Approved Date

2 PUBLIC ADDRESS SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-002 17.03.2023 29.03.2023 A

3 PUBLIC ADDRESS SYSTEM FOR MEZZANNINE FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-003 20.03.2023 29.03.2023 A

SPORTS DECK BLOCK-RODENT REPELLENT SYSTEM

1 RODENT REPELLENT SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-RRS-001 17.03.2023 17.03.2023 A 21.03.2023 Approved Date

SPORTS DECK BLOCK-WATER LEAK DETECTION SYSTEM

1 WATER LEAK DETECTION SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-WLD-001 17.03.2023 17.03.2023 A 21.03.2023 Approved Date

SCHEMATIC DRAWING

SCHOOL BUILDING & SPORTS BLOCK


AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
1 ADDRESSABLE FIRE ALARM SYSTEM-SCHEMATIC MH22-0072-CHIREC-SB-FAS-SCH-001 SUBMIT THE SCHEMATIC

PUBLIC ADDRESS SYSTEM- SCHEMATIC AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
2 19.01.2023 MH22-0072-CHIREC-SB-PAS-SCH-001 SUBMIT THE SCHEMATIC

WATER LEAK DETECTION SYSTEM-SCHEMATIC AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL
3 MH22-0072-CHIREC-SB-WLD-SCH-001 SUBMIT THE SCHEMATIC

AS PER THE FINAL APPROVAL OF SHOP DRAWING, WE WILL


4 RODENT REPELLENT SYSTEM -SCHEMATIC MH22-0072-CHIREC-SB-RRS-SCH-001 SUBMIT THE SCHEMATIC

SPORTS BLOCK
PHE- DRAWING TRACKER

6/20/2023
CLIENT NAME: M/s. KAMALASANA PROPERTIES & SERVICES PRIVATE LIMITED
PROJECT NAME: M/s. CHIREC INTERNATIONAL SCHOOL
LOCATION: HYDERABAD
DESIGN CONSULTANT: E-SOLLUTIONS CONSULTANCY PVT LTD
PHE CONTRACTOR: MICRON ELECTRICALS

SUMMARY DRAWING STATUS


Total Drawings 25 Approved A
GFC Received 23 Approved with Comments B
Yet to receive revised GFC 0 Revise and Resubmit C
Submitted Drawings 24 Rejected D
With Under Review
Approved Drawings 20 Comments U
Under Review Drawings 4
Revise / Resubmission 0
To be Submitted 1

GFC Received
Sl No. Drawing Name TENDER Drawing No GFC Drawing No Rev GFC Drawing Date Date Shop Drawing No Rev Planned Date Actual Date Status Remarks

SCHOOL BUILDING
Approved with comments received on 08.02.2023.Comments
ES-COG-SB-PHE-DR-01 KPSPL-CHIREC-AB-PL-01 R5 09.01.2023 MH22-0072-CHIREC-SB-PHE-GF-DR-01 R0 20.01.2023 B updated drawing will submit 7 days after receiving schematic
1 GROUND FLOOR INTERNAL DRAINAGE LAYOUT 08.01.2023 layouts
R1 11.03.2023

ES-COG-SB-PHE-WS-01 KPSPL-CHIREC-AB-PL-09 R4 09.01.2023 MH22-0072-CHIREC-SB-PHE-GF-WS-01A R0 20.01.2023 B


2 GROUND FLOOR INTERNAL WATER SUPPLY LAYOUT 06.01.2023
R1 11.03.2023

ES-COG-SB-PHE-DR-02 KPSPL-CHIREC-AB-PL-02 R5 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-FF-DR-02 R0 24.01.2023 B


3 FIRST FLOOR INTERNAL DRAINAGE LAYOUT
R1 11.03.2023

ES-COG-SB-PHE-WS-02 KPSPL-CHIREC-AB-PL-10 R4 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-FF-WS-02A R0 24.01.2023 B


4 FIRST FLOOR INTERNAL WATER SUPPLY LAYOUT
R1 11.03.2023

ES-COG-SB-PHE-DR-03 KPSPL-CHIREC-AB-PL-03 R4 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-SF-DR-03 R0 24.01.2023 B


5 SECOND FLOOR INTERNAL DRAINAGE LAYOUT
R1 11.03.2023

SECOND FLOOR INTERNAL WATER SUPPLY LAYOUT ES-COG-SB-PHE-WS-03 KPSPL-CHIREC-AB-PL-11 R4 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-SF-WS-03A R0 24.01.2023 B
6
R1 11.03.2023

ES-COG-SB-PHE-DR-04 KPSPL-CHIREC-AB-PL-04 R4 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-THF-DR-04 R0 24.01.2023 B


7 THIRD FLOOR INTERNAL DRAINAGE LAYOUT
R1 11.03.2023

ES-COG-SB-PHE-WS-04
THIRD FLOOR INTERNAL WATER SUPPLY LAYOUT KPSPL-CHIREC-AB-PL-12 R4 09.01.2023 MH22-0072-CHIREC-SB-PHE-THF-WS-04A R0 24.01.2023 B
8 06.01.2023
R1 11.03.2023

ES-COG-SB-PHE-DR-05 KPSPL-CHIREC-AB-PL-05 R4 09.01.2023 MH22-0072-CHIREC-SB-PHE-4THF-DR-05 R0 24.01.2023 B


9 FOURTH FLOOR INTERNAL DRAINAGE LAYOUT 06.01.2023
R1 11.03.2023

ES-COG-SB-PHE-WS-05
KPSPL-CHIREC-AB-PL-13 R4 09.01.2023 MH22-0072-CHIREC-SB-PHE-4THF-WS-05A R0 24.01.2023 B
10 FOURTH FLOOR INTERNAL WATER SUPPLY LAYOUT 06.01.2023
R1 11.03.2023

ES-COG-SB-PHE-DR-06 KPSPL-CHIREC-AB-PL-06 R4 09.01.2023 MH22-0072-CHIREC-SB-PHE-5THF-DR-06 R0 24.01.2023 B


11 FIFTH FLOOR INTERNAL DRAINAGE LAYOUT 06.01.2023
R1 11.03.2023

ES-COG-SB-PHE-WS-06 KPSPL-CHIREC-AB-PL-14 R3 09.01.2023 MH22-0072-CHIREC-SB-PHE-5THF-WS-06A R0 24.01.2023 B


12 FIFTH FLOOR INTERNAL WATER SUPPLY LAYOUT 06.01.2023
R1 11.03.2023

ES-COG-SB-PHE-DR-07 KPSPL-CHIREC-AB-PL-07 R3 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-TF-DR-07 R0 24.01.2023 B


13 TERRACE FLOOR INTERNAL DRAINAGE LAYOUT
R1 11.03.2023

ES-COG-SB-PHE-WS-07 KPSPL-CHIREC-AB-PL-15 R3 06.01.2023 09.01.2023 MH22-0072-CHIREC-SB-PHE-TF-WS-07A R0 24.01.2023 B


14 TERRACE FLOOR INTERNAL WATER SUPPLY LAYOUT
R1 11.03.2023

MH22-0072-CHIREC-SB-PHE-TF- Shop drawing will submit 7 days after receiving schematic


R0 24.02.2023 02.03.2023 MH22-0072-CHIREC-SB-PHE-TF-07B R0 11.03.2023 19.04.2023 U
15 TERRACE FLOOR -OHT PUDDLE FLANGE DETAIL DRAWING WS-07B layouts
.

ES-COG-SB-PHE-AA-08 MH22-0072-CHIREC-SB-PHE-ETD-DR-08 18.03.2023 17.05.2023 U


ENLARGED DRAINAGE LAYOUT & ENLARGED WATER SUPPLY LAYOUT
16

ES-COG-SB-PHE-SC-09 3/18/2023 MH22-0072-CHIREC-SB-PHE-WS-SL-09 26/03/2023 C


17 WATER SUPPLY SCHEMATIC LAYOUT
Recived R1 R1 20.04.2023 U
R1 08/01/2023 MH22-0072-CHIREC-SB-PHE-EX-DR-10 R0 23.12.2022 24.12.2022 B Approved on 30.12.2022.

18 EXTERNAL DRAINAGE LAYOUT ES-COG-SP-PHE-EX-02 KPSPL-CHIREC-ED-PL-21

R4 08/01/2023 R1 20.01.2023 U

19 EXTERNAL WATER SUPPLY LAYOUT ES-COG-SP-PHE-EX-01 KPSPL-CHIREC-ED-PL-20 R1 08/01/2023 MH22-0072-CHIREC-SB-PHE-EX-WS-10A R0 23.12.2022 24.12.2022 B Approved on 30.12.2022.

20 PHE PUMP ROOM LAYOUT Yet to received 3/23/2023 GFC NOT RECEIVED

SPORTS BLOCK
21 SPORTS BLOCK- PARKING DRAINAGE LAYOUT (GROUND & MEZZANINE) ES-COG-SPB-PHE-DR-01 KPSPL-CHIREC-SB-PL-18A R3 16.02.2023 02.03.2023 MH22-0072-CHIREC-SPB-PHE-PA-DR-11 R0 18.03.2023 27.03.2023 B

SPORTS BLOCK- RAIN WATER DOWNTAKE LAYOUT (HEAD LEVEL & DECK ES-COG-SPB-PHE-WS-01
22 KPSPL-CHIREC-SB-PL-18A R3 23.02.2023 02.03.2023 MH22-0072-CHIREC-SPB-PHE-RW-12 R0 18.03.2023 27.03.2023 B
LEVEL)

23 SPORTS BLOCK- INTERNAL DRAINAGE LAYOUT ES-COG-RRB-PHE-DR-01 KPSPL-CHIREC-SB-PL-18 R6 22.12.2022 02.03.2023 MH22-0072-CHIREC-SPB-PHE-IN-DR-13 R0 18.03.2023 27.03.2023 B

SPORTS BLOCK- INTERNAL WATER SUPPLY LAYOUT ES-COG-RRB-PHE-WS-01


24 KPSPL-CHIREC-SB-PL-19 R6 22.12.2022 02.03.2023 MH22-0072-CHIREC-SPB-PHE-IN-WS-13A R0 18.03.2023 27.03.2023 B

25 STANDARD DRAWING AND TYPICAL SECTION ES-COG-PHE-AA-01 KPSPL-CHIREC-ED-PL-24 R0 20.12.2022 28.12.2022 MH22-0072-CHIREC-PHE-TYP-SD-14 A
ELECTRICAL WORKS - DRAWING TRACKER
Dt - 07.04.2023
CLIENT NAME: M/s. KAMALASANA PROPERTIES & SERVICES PRIVATE LIMITED
PROJECT NAME: M/s. CHIREC INTERNATIONAL SCHOOL
LOCATION: HYDERABAD
PROJECT MANAGEMENT CONSULTANT: Turner & Townsend
DESIGN CONSULTANT: E-SOLLUTIONS CONSULTANCY PVT LTD
MEP CONTRACTOR: Micron Electricals
SUMMARY DRAWING STATUS
Total Drawings 49 Approved A
GFC Drawing Received 49 Approved with Comments B
Yet to receive revised GFC 0 Revise and Resubmit C
Submitted Drawings 47 Rejected D
Approved Drawings 46 Under Review U
Under Review Drawings 1
Revise / Resubmission 0
To be Submitted 2

Status - Approved /
Shop Drawings Submission /
GFC Received Approved With Comments /
Sl No. Drawing Name Shop Drawing No Rev Resubmission Date Remarks
Date Rejected - To Be Resubmitted

Planned Actual Date Status

Shall be submitted after


1 MAIN SINGLE LINE DIAGRAM 12.12.2022 ME/1887/CHIREC/EL-01A/MSLD approval of Panel GA
drawings

Shall be submitted after


RMU, TRANSFORMER & D.G.YARD approval of RMU, Trafo, &
2 12.12.2022 ME/1887/CHIREC/EL-02A/RMU R0 20.04.2023
LAYOUT D.G.Equipmenrt

Shall be submitted after


3 MAIN ELECTRICAL ROOM LAYOUT 08.01.2023 ME/1887/CHIREC/EL-02B/ER approval of Panel GA
drawings

4 SITE PLAN EARTHING LAYOUT 12.12.2022 ME/1887/CHIREC/EL-02E/EL P0 21.12.2022 04.01.2023 C


P1 11.01.2023 19.01.2023 B
Comments received on
P2 01.02.2023 19.01.2023 is updated &
awaiting for approval

5 EARTHING SCHEMATIC 12.12.2022 ME/1887/CHIREC/EL-02F/ES P0 21.12.2022 04.01.2023 C


P1 11.01.2023 19.01.2023 B Drawing Approved
P2 28.01.2023 30.01.2023 B

6 EXTERNAL LIGHTING LAYOUT 12.12.2022 ME/1887/CHIREC/EL-02E/ELL P0 21.12.2022 12.01.2023 C


P1 13.01.2023 31.03-2023 B
LPS vendor support is
LIGHTNING PROTECTION LAYOUT-
7 11.01.2023 ME/1887/CHIREC/EL-02F/LPS P0 11.01.2023 B required (Not on board as on
TERRACE
24.02.2023)

8 EXTERNAL ELECTRICAL LAYOUT 12.12.2022 ME/1887/CHIREC/EL-02G/EXT P0 31.12.2022 U Hold by consultant

MAIN BUILDING

9 GROUND FLOOR LIGHTING LAYOUT 08.01.2023 ME/1887/CHIREC/EL-03A/LL P0 28.01.2023 30.01.2023 B

10 GROUND FLOOR POWER LAYOUT 08.01.2023 ME/1887/CHIREC/EL-03B/PL P0 28.01.2023 27.01.2023 30.01.2023 B

Comments received on
P1 02.02.2023 B 30.01.2023 is updated &
awaiting for approval

GROUND FLOOR - LOW LEVEL


11 08.01.2023 ME/1887/CHIREC/EL-03C/LLC P0 01.03.2023 14.03.2023 B Awaiting for approval
CONTAINMENT LAYOUT

GROUND FLOOR - ROOF LEVEL


12 08.01.2023 ME/1887/CHIREC/EL-03D/ULC P0 01.03.2023 14.03.2023 B Awaiting for approval
CONTAINMENT LAYOUT

01.02.2023
13 FIRST FLOOR LIGHTING LAYOUT 14.01.2023 ME/1887/CHIREC/EL-04A/LL P0 07.02.2023 13.02.2023 C
04.02.2023
P1 24.02.2023 02.03.2023 B Approved with comments

14 FIRST FLOOR POWER LAYOUT 14.01.2023 ME/1887/CHIREC/EL-04B/PL P0 01.02.2023 01.02.2023 13.02.2023 C


P1 17.02.2023 02.03.2023 B Approved with comments

FIRST FLOOR - LOW LEVEL 03.03.2023


15 14.01.2023 ME/1887/CHIREC/EL-04C/LLC P0 07.03.2023 B Awaiting for approval
CONTAINMENT LAYOUT 08.03.2023

FIRST FLOOR - ROOF LEVEL 03.03.2023


16 14.01.2023 ME/1887/CHIREC/EL-04D/ULC P0 07.03.2023 B Awaiting for approval
CONTAINMENT LAYOUT 08.03.2023

17 SECOND FLOOR LIGHTING LAYOUT 21.01.2023 ME/1887/CHIREC/EL-05A/LL P0 05.02.2023 07.02.2023 13.02.2023 C


P1 10.03.2023 B Awaiting for approval

18 SECOND FLOOR POWER LAYOUT 21.01.2023 ME/1887/CHIREC/EL-05B/PL P0 05.02.2023 07.02.2023 C


P1 17.02.2023 02.03.2023 B Approved with comments

SECOND FLOOR - LOW LEVEL


19 21.01.2023 ME/1887/CHIREC/EL-05C/LLC P0 07.03.2023 07.03.2023 B Awaiting for approval
CONTAINMENT LAYOUT

SECOND FLOOR - ROOF LEVEL


20 21.01.2023 ME/1887/CHIREC/EL-05D/ULC P0 07.03.2023 07.03.2023 B Awaiting for approval
CONTAINMENT LAYOUT

21 THIRD FLOOR LIGHTING LAYOUT 02.02.2023 ME/1887/CHIREC/EL-06A/LL P0 09.02.2023 07.02.2023 C


P1 10.03.2023 B Under review

22 THIRD FLOOR POWER LAYOUT 02.02.2023 ME/1887/CHIREC/EL-06B/PL P0 09.02.2023 07.02.2023 C


P1 17.02.2023 02.03.2023 B Approved with comments

THIRD FLOOR - LOW LEVEL


23 02.02.2023 ME/1887/CHIREC/EL-06C/LLC P0 09.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

THIRD FLOOR - ROOF LEVEL


24 02.02.2023 ME/1887/CHIREC/EL-06D/ULC P0 09.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

25 FOURTH FLOOR LIGHTING LAYOUT 02.02.2023 ME/1887/CHIREC/EL-07A/LL P0 14.02.2023 14.03.2023 B Under review

26 FOURTH FLOOR POWER LAYOUT 02.02.2023 ME/1887/CHIREC/EL-07B/PL P0 14.02.2023 17.02.2023 B Awaiting approval

FOURTH FLOOR - LOW LEVEL


27 02.02.2023 ME/1887/CHIREC/EL-07C/LLC P0 11.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

FOURTH FLOOR - ROOF LEVEL


28 02.02.2023 ME/1887/CHIREC/EL-07D/ULC P0 11.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

29 FIFTH FLOOR LIGHTING LAYOUT 13.02.2023 ME/1887/CHIREC/EL-08A/LL P0 13.03.2023 23/03/2023 B

30 FIFTH FLOOR POWER LAYOUT 13.02.2023 ME/1887/CHIREC/EL-08B/PL P0 07.03.2023 07.03.2023 B Under review

FIFTH FLOOR - LOW LEVEL


31 13.02.2023 ME/1887/CHIREC/EL-08C/LLC 08.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

FIFTH FLOOR - ROOF LEVEL


32 13.02.2023 ME/1887/CHIREC/EL-08D/ULC 08.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

TERRACE FLOOR LIGHTING


33 15.02.2023 ME/1887/CHIREC/EL-09A/LL 10.03.2023 23/03/2023 B
LAYOUT

34 TERRACE FLOOR POWER LAYOUT 15.02.2023 ME/1887/CHIREC/EL-09B/PL 10.03.2023 10.03.2023 B Under review

TERRACE FLOOR - LOW LEVEL


35 15.02.2023 ME/1887/CHIREC/EL-09C/LLC 11.03.2023 10.03.2023 B Under review
CONTAINMENT LAYOUT

SPORTS BUILDING
36 GROUND LEVEL LIGHTING LAYOUT 24.02.2023 ME/1887/CHIREC/EL-10A/LL 16.03.2023 23/03/2023 B

37 GROUND LEVEL POWER LAYOUT 24.02.2023 ME/1887/CHIREC/EL-10B/PL 16.03.2023 23/03/2023 B

GROUND LEVEL - ROOF LEVEL


38 24.02.2023 ME/1887/CHIREC/EL-10D/ULC 16.03.2023 23/03/2023 B
CONTAINMENT LAYOUT
MEZZANINE LEVEL LIGHTING
39 24.02.2023 ME/1887/CHIREC/EL-11A/LL 18.03.2023 23/03/2023 B
LAYOUT

40 MEZZANINE LEVEL POWER LAYOUT 24.02.2023 ME/1887/CHIREC/EL-11B/PL 18.03.2023 23/03/2023 B

MEZZANINE LEVEL - ROOF LEVEL


41 24.02.2023 ME/1887/CHIREC/EL-11D/ULC 18.03.2023 23/03/2023 B
CONTAINMENT LAYOUT

42 DECK LEVEL LIGHTING LAYOUT 24.02.2023 ME/1887/CHIREC/EL-12A/LL 21.03.2023 23/03/2023 B

43 DECK LEVEL POWER LAYOUT 24.02.2023 ME/1887/CHIREC/EL-12B/PL 21.03.2023 23/03/2023 B

DECK LEVEL - ROOF LEVEL


44 24.02.2023 ME/1887/CHIREC/EL-12D/ULC 21.03.2023 23/03/2023 B
CONTAINMENT LAYOUT

LIGHTNING PROTECTION LAYOUT-


45 03.03.2023 ME/1887/CHIREC/EL-13/LPS 23/03/2023 B
TERRACE

STAIRACASE LIGHTING

GROUND FLOOR STAIRCASE


46 ME/1887/CHIREC/EL-14A/SL P0 * 30.01.2023 B
LIGHTING LAYOUT

STAIRCASE 1 TO 4 LIGHTING
47 ME/1887/CHIREC/EL-14B/SL P0 * 30.01.2023 B
LAYOUT

STAIRCASE 5 TO 7 LIGHTING
48 ME/1887/CHIREC/EL-14C/SL P0 * 30.01.2023 B
LAYOUT

TYPICAL ELECTRICAL
49 ME/1887/CHIREC/EL-14D/TYP P0 * 01.02.2023 B
INSTALLATION DETAILS
HVAC - DRAWING TRACKER -CHIREC INTERNATION SCHOOL @ HYDERABAD
Dt -08.05.2023

CLIENT NAME: M/s. KAMALASANA PROPERTIES & SERVICES PVT. LTD

PROJECT NAME: CHIREC INTERNATIONAL SCHOOL MEP WORKS


LOCATION: HYDERABAD
PMC : JLL
MEP CONSULTANT: E-SOLLUTIONS CONSULTANCY PVT. LTD
MEP CONTRACTOR MICRON ELECTRICALS
SERVICE: HVAC

SUMMARY DRAWING's LEGEND


Total Drawings 15 Approved A
Approved with
GFC Drawing Received 14 Comments B

Revise and Resubmit


Yet to receive revised GFC 1 C

Submitted Drawings 14 Rejected D


Approved Drawings 0 Under Review U

Approved with Comments 14


Under Review Drawings 1
Revise / Resubmission 0
To be Submitted 1

Approved/
Shop Drawings Submission /
Resubmission Date Approved With Comments/
Client GFC Received Rejected -To Be Resubmitted
Sl No. Drawing Name Date GFC Drg No. Shop Drawing No. Rev Remark

Planned Actual Date Status

SCHOOL BUILDING (ACADEMIC BUILDING)


1 GROUND FLOOR HVAC VRF SYSTEM LAYOUT 09.01.2023 CS-E-GF-HL MH22-0072-CHIREC-HVAC-GF-01 R0 24.01.2023 24.01.2023 08.02.2023 C
R1 14.02.2023 22.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

2 GROUND FLOOR HVAC SYSTEM DUCTING LAYOUT 09.01.2023 CS-E-GF-HL MH22-0072-CHIREC-HVAC-GF-02 R0 24.01.2023 24.01.2023 08.02.2023 C
R1 14.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

3 FIRST FLOOR HVAC VRF SYSTEM LAYOUT 16.01.2023 CS-H-FF-HL MH22-0072-CHIREC-HVAC-1F-03 R0 24.01.2023 24.01.2023 08.02.2023 C
R1 14.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

4 FIRST FLOOR HVAC SYSTEM DUCTING LAYOUT 16.01.2023 CS-H-FF-HL MH22-0072-CHIREC-HVAC-1F-04 R0 24.01.2023 24.01.2023 08.02.2023 C
R1 14.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

5 SECOND FLOOR HVAC VRF SYSTEM LAYOUT 21.01.2023 CS-E-2F-HL MH22-0072-CHIREC-HVAC-2F-05 R0 24.01.2023 24.01.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

6 SECOND FLOOR HVAC SYSTEM DUCTING LAYOUT 21.01.2023 CS-E-2F-HL MH22-0072-CHIREC-HVAC-2F-06 R0 24.01.2023 24.01.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

7 THIRD FLOOR HVAC VRF SYSTEM LAYOUT 27.01.2023 CS-E-3F-HL MH22-0072-CHIREC-HVAC-3F-07 R0 30.01.2023 30.01.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

8 THIRD FLOOR HVAC SYSTEM DUCTING LAYOUT 27.01.2023 CS-E-3F-HL MH22-0072-CHIREC-HVAC-3F-08 R0 30.01.2023 30.01.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

9 FOURTH FLOOR HVAC VRF SYSTEM LAYOUT 01.02.2023 CS-E-4F-HL MH22-0072-CHIREC-HVAC-4F-09 R0 04.02.2023 06.02.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

10 FOURTH FLOOR HVAC SYSTEM DUCTING LAYOUT 01.02.2023 CS-E-4F-HL MH22-0072-CHIREC-HVAC-4F-10 R0 04.02.2023 06.02.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 25.02.2023 24.01.2023 02.03.2023 C
R3 06.03.2023 15.03.2023 B Approved with Comments

11 FIFTH FLOOR HVAC VRF SYSTEM LAYOUT 13.02.2023 KPSPL-CHIREC-AB-EL-5F-LL-01 MH22-0072-CHIREC-HVAC-5F-11 R0 17.02.2023 06.02.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 07.03.2023 15.03.2023 A Approved with Comments

12 FIFTH FLOOR HVAC SYSTEM DUCTING LAYOUT 13.02.2023 KPSPL-CHIREC-AB-EL-5F-LL-01 MH22-0072-CHIREC-HVAC-5F-12 R0 17.02.2023 06.02.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 07.03.2023 15.03.2023 A Approved with Comments

13 TERRACE FLOOR HVAC SYSTEM LAYOUT 14.02.2023 KPSPL-CHIREC-AB-EL-TF-HVAC-01 MH22-0072-CHIREC-HVAC-TF-13 R0 17.02.2023 06.02.2023 08.02.2023 C
R1 16.02.2023 23.02.2023 C
R2 07.03.2023 15.03.2023 A Approved with Comments
SPORTS BUILDING
14 SPORTS BLOCK HVAC SYSTEM DUCTING LAYOUTS 2/24/2023 MH22-0072-CHIREC-HVAC-SB-14 R0 08.03.2023 09.03.2023 15.03.2023 A Approved with Comments
R1
VENTILATION SYSTEM

15 STP AND PUMP ROOM VENTILATION SYSTEM LAYOUT 2/5/2023 ES-HVAC-PUMP ROOM MH22-0072-CHIREC-VENT-STP-PR-16 R0 26.05.2023 U
FPS
1 LAYOUT OF FIRE FIGHTING PUMP ROOM Received 23.03.2023 MH22-0072-CHIREC-SB-FPS-009 31.03.2023 U
ELV
1 KPSPL-CHIREC-AB-FAPA- R0 08/01/2023 MH22-0072-CHIREC-SB-FAS-001 25.01.2023 C
ADDRESSABLE FIRE ALARM SYSTEM FOR GROUND FLOOR
GF-01
02.02.2023 U
KPSPL-CHIREC-AB-RRS-GF- R0 25.01.2023
2 RODENT REPELLENT SYSTEM FOR GROUND FLOOR 08/01/2023 MH22-0072-CHIREC-SB-RRS-001 C
05
ADDRESSABLE FIRE ALARM SYSTEM FOR MEZZANNINE
3 CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-FAS-003 20.03.2023 18.03.2023 U
FLOOR

4 PUBLIC ADDRESS SYSTEM FOR SPORTS DECK CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-PAS-001 17.03.2023 24.03.2023 U

5 RODENT REPELLENT SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-RRS-001 17.03.2023 17.03.2023 U

6 WATER LEAK DETECTION SYSTEM FOR GROUND FLOOR CS-E-SPB-DL-ELEC-RCP LYT R0 24.02.2023 MH22-0072-CHIREC-SD-WLD-001 17.03.2023 17.03.2023 U

PHE
1 WATER SUPPLY SCHEMATIC LAYOUT ES-COG-SB-PHE-SC-09 3/18/2023 MH22-0072-CHIREC-SB-PHE-WS-SL-09 26/03/2023 U
23.12.202 C
R1 08/01/2023 24.12.2022
2 2
EXTERNAL DRAINAGE LAYOUT ES-COG-SP-PHE-EX-02 MH22-0072-CHIREC-SB-PHE-EX-DR-10
R4 08/01/2023 20.01.2023 U
ELECTRICAL
EXTERNAL ELECTRICAL LAYOUT 12.12.2022 ME/1887/CHIREC/EL-02G/EXT 31.12.2022 U
3