Block A - MEP Handover Documents
Block A - MEP Handover Documents
1
AS BUILT DRAWINGS
Fire Fighting System 1 set
FA / PA/ Telecom Package 1 set
ACMV Pacakage 1 set
CCTV Package 1 set
Electrical Package 1 set
Plumbing Package 1 set
Elevator Package 1 set
4
FA/SA TEST REPORTS
Fire Fighting System 1 set
FA / PA/ Telecom Package 1 set
ACMV Pacakage 1 set
CCTV Package 1 set
Electrical Package 1 set
Plumbing Package 1 set
Elevator Package 1 set
Name
Designation
Department
Signature
Date
HANDING OVER OF ACMV PACAKAGE DOCUMENTS
Project Name:
INDEX OF DOCUMENTS
S.No. Description Submitted Remarks
Section 1
1 Details of Project main players 1 copy
2 Escalation chart for DLP 1 copy
3 DLP warranty & guarantee certificates 1 copy
4 Sub vendor warranty & guarantee certificates 1 copy
Section 2
5 List of equipments & tag details 1 copy
6 Sub vendor contact details 1 copy
Section 3
7 Scope of description / Brief design concept 1 copy
Section 4
8 As built drawings (15 drawings) 2 sets
Allied manufacturing as built drawings
Section 5
9 Operation manual of the system 1 copy
Section 6
10 Recommended Spare list / Minimum Inventory 1 copy
Section 7
User manual/catalogues for the equipment / fixture/
11 Spare & materials 1 copy
Section 8
12 Factory Acceptance Test Reports 1 copy
13 Site Acceptance Test Reports 1 copy
Signature:- Signaure:-
Date: Date:
HANDING OVER OF FA/PA/TELECOM PACAKAGE DOCUMENTS
Project Name:-
INDEX OF DOCUMENTS
S.No. Description Submitted Remarks
Section 1
1 Details of Project main players 1 copy
2 Escalation chart for DLP 1 copy
3 DLP warranty & guarantee certificates 1 copy
4 Sub vendor warranty & guarantee certificates 1 copy
Section 2
5 List of equipments & tag details 1 copy
6 Sub vendor contact details 1 copy
Section 3
7 Scope of description / Brief design concept 1 copy
Section 4
8 As built drawings (27 drawings) & list 2 sets
Allied manufacturing as built drawings 1 copy
Section 5
9 Operation manual of the system 1 copy
Section 6
10 Maintenance procedure/Preventive maintenance 1 copy
Section 7
11 Recommended Spare list / Minimum Inventory 1 copy
Section 8
User manual/catalogues for the equipment / fixture/
12 Spare & materials 1 copy
Section 9
13 Factory Acceptance Test Reports 1 copy
14 Site Acceptance Test Reports 1 copy
Signaure:- Signaure:-
Date: Date:
HANDING OVER OF DG PACAKAGE DOCUMENTS
Project Name:-
INDEX OF DOCUMENTS
S.No. Description Submitted Remarks
Section 1
1 Details of Project main players 1 copy
2 Escalation chart for DLP 1 copy
3 DLP warranty & guarantee certificates 1 copy
4 Sub vendor warranty & guarantee certificates 1 copy
Section 2
5 List of equipments & tag details 1 copy
6 Sub vendor contact details 1 copy
Section 3
7 Scope of description / Brief design concept 1 copy
Section 4
8 List of drawings (5 drawings) 2 sets
Allied manufacturing as built drawings
Section 5
9 Operation manual of the system 1 copy
Section 6
10 Maintenance procedure/Preventive maintenance 1 copy
Section 7
11 Recommended Spare list / Minimum Inventory 1 copy
Section 8
User manual/catalogues for the equipment / fixture/
12 Spare & materials 1 copy
Section 9
13 Factory Acceptance Test Reports 1 copy
14 Site Acceptance Test Reports 1 copy
Signaure:- Signaure:-
Date: Date:
HANDING OVER OF FIRE FIGHTING PACAKAGE DOCUMENTS
Project Name:-
INDEX OF DOCUMENTS
S.No. Description Submitted Remarks
Section 1
1 Details of Project main players 1 copy
2 Escalation chart for DLP 1 copy
3 DLP warranty & guarantee certificates 1 copy
4 Sub vendor warranty & guarantee certificates 1 copy
Section 2
5 List of equipments & tag details 1 copy
6 Sub vendor contact details 1 copy
Section 3
7 Scope of description / Brief design concept 1 copy
Section 4
8 As built drawings 2 sets
Allied manufacturing as built drawings
Section 5
9 Operation manual of the system 1 copy
Section 6
10 Maintenance procedure/Preventive maintenance 1 copy
Section 7
11 Recommended Spare list / Minimum Inventory 1 copy
Section 8
User manual/catalogues for the equipment / fixture/
12 Spare & materials 1 copy
Section 9
13 Factory Acceptance Test Reports 1 copy
14 Site Acceptance Test Reports 1 copy
Signaure:- Signaure:-
Date: Date:
HANDING OVER OF ELECTRICAL PACAKAGE DOCUMENTS
Project Name:-
INDEX OF DOCUMENTS
S.No. Description Submitted Remarks
Section 1
1 Details of Project main players 1 copy
2 Escalation chart for DLP 1 copy
3 DLP warranty & guarantee certificates 1 copy
4 Sub vendor warranty & guarantee certificates 1 copy
Section 2
5 List of equipments & tag details 1 copy
6 Sub vendor contact details 1 copy
Section 3
7 Scope of description / Brief design concept 1 copy
Section 4
8 As built drawings 2 sets
Allied manufacturing as built drawings
Section 5
9 Operation manual of the system 1 copy
Section 6
10 Maintenance procedure/Preventive maintenance 1 copy
Section 7
11 Recommended Spare list / Minimum Inventory 1 copy
Section 8
User manual/catalogues for the equipment / fixture/
12 Spare & materials 1 copy
Section 9
13 Factory Acceptance Test Reports 1 copy
14 Site Acceptance Test Reports 1 copy
Signaure:- Signaure:-
Date: Date:
HANDING OVER OF PLUMBING PACAKAGE DOCUMENTS
Project Name:-
INDEX OF DOCUMENTS
S.No. Description Submitted Remarks
Section 1
1 Details of Project main players
2 Escalation chart for DLP
3 DLP warranty & guarantee certificates
4 Sub vendor warranty & guarantee certificates
Section 2
5 List of equipments & tag details
6 Sub vendor contact details
Section 3
7 Scope of description / Brief design concept
Section 4
8 As built drawings
Allied manufacturing as built drawings
Section 5
9 Operation manual of the system
Section 6
10 Maintenance procedure/Preventive maintenance
Section 7
11 Recommended Spare list / Minimum Inventory
Section 8
User manual/catalogues for the equipment /
12 fixture/ Spare & materials
Signaure:- Signaure:-
Date: Date:
LIST OF AS BUILT DRAWINGS - ELECTRICAL PACKAGE
7
LIST OF AS BUILT DRAWINGS - CCTV DRAWINGS
9
S No. Consultant Name Description
1
3
Address Contact person Contact numbers
Emails IDs'
LIST OF AS BUILT DRAWINGS - FIRE FIGHTING SYSTEM