Professional Documents
Culture Documents
Mohd Fazlee - CV - Cert Updated Oct 20201
Mohd Fazlee - CV - Cert Updated Oct 20201
Address : No. 49, Jalan Lili 1/6, Bestari Perdana, 81700 Pasir Gudang Johor, Malaysia
Mobile : +6019-7274370
E-Mail : fazleendt9@gmail.com
SUMMARY OF EXPERIENCES
More than seventeen (17) years of experience in QA/QC Inspection and Supervision, Welding and NDT, Piping/Mechanical,
Structural and Pipeline in Oil and Gas industry in Domestic/Oversea and Upstream/Downstream project. Has achieving
organizational performance goal. Strong interpersonal skills when dealing with contractors, vendors, authorities and other
personnel involved in the projects. Excellence track record of success involving the completion of various major PMC, EPCC,
EPCIC and EPCM projects. Able to work under pressure and with multi-racial society of diverse cultures.
PROFESSIONAL QUALIFICATION
1. Certified CSWIP 3.1 Welding Inspector Level II [Cert No : 407053 : Date Of Expiry : 01 July 2025
2. Certified CSWIP 3.4 Radiographic Interpreter Level II [Cert No : 396568] : Date Of Expiry : 07 January 2025
3. Certified PCN Ultrasonic Testing 3.1. 3.2. 3.8. 3.9 Level II [Cert No : F012S3324772] : Expired
4. Certified PCN Magnetic Particle Testing Level II [Cert No : F012S3423409] : Expired
5. Certified PCN Liquid Penetrant Testing Level II [Cert No : F012S3525721] : Expired
6. Certified Instrumentation Process and Control Technology, ADICSOLT Training Services, INSTEP
SUPPLEMENTARY DOCUMENTS
1. Valid BOSIET : Offshore Survival Safety Passport, Date Of Expiry : 20 February 2023
2. Valid Medical Offshore Report and Certificate, Date Of Expiry : 21 February 2021
3. Valid International Passport : A26259513, Date Of Expiry : 20 February 2024
1. Attended API 570 In Service Piping Process Inspection Course, American Petroleum Institute (API)
2. Attended CSWIP 3.1 Welding Inspection Level II Course, TWI-SEA
3. Attended CSWIP 3.4 Radiographic Interpretation Level II Course, TWI-SEA
4. Attended CSWIP Ultrasonic Testing - 3.1. 3.2 Level II Course, TWI-SEA
5. Attended CSWIP Penetrant Testing Level II Course, TWI-SEA
6. Attended PCN Ultrasonic Testing - 3.1. 3.2. 3.8. 3.9 Level II Course, MINDT
7. Attended PCN Magnetic Particle Testing Level II Course, MINDT
8. Attended PCN Liquid Penetrant Testing Level II Course, MINDT
9. Attended Instrumentation Process and Control Technology Course, ADICSOLT Training Services - INSTEP
EDUCATIONAL BACKGROUND
1. Welding Inspection, Non-Destructive Testing and Steel 4. Offshore Upstream Piping/Mechanical and Structural
Fabrication/Erection Hook-Up and Commissioning
2. Onshore Upstream Piping/Mechanical, Structural and 5. Offshore Upstream Pipeline and Structural Installation
Hull Outfitting Fabrication and Construction and Pre-Commissioning
3. Onshore Downstream Piping/Mechanical Installation 6. Onshore/Offshore for Fire Fighting Piping/Mechanical
and Commissioning for Power Plant & Refinery System, HVAC System and Marine Conversion
JOB RESPONSIBILITIES
1. Surveillance, monitoring, inspection and witnessed for Welding work (Before, During and After), WQT, NDT, PWHT,
Mechanical Testing, Flange Management, Hydrotest, Leak Test, Reinstatement and any related Testing involved as per
approved Inspection and Testing Plan (ITP) and Project procedures and specification.
2. Inspection scope including Material Verification inspection (MVR), Fit-up, Visual, Consumable Control, Material Handling,
Storage and Preservation, Dimensional check and Line Check for various type of Metallic and Non-Metallic material.
3. Review, verification and signing QA/QC documents and inspection report.
4. Liaised with Engineering Department and Project Management for the production progress and inspection to ensure the
completion of the project in time and comply with the specification requirement.
1
EMPLOYMENT HISTORY
• EURO-4M Product Filter Plant and Switch House Project at Port Dickson, Malaysia
• Hook Up, Commissioning and Topside Major Maintenance Services for Murphy's Production Operations at DESB Yard,
Bintulu Malaysia and Murphy Offshore Production Platform
• STEAM CRACKER COMPLEX (SCC) PACKAGE-5 at Pengerang Integrated Complex (PIC), RAPID Pengerang, Malaysia
• PENGERANG CO-GENERATION PLANT (PCP) at Pengerang Integrated Complex (PIC), RAPID Pengerang, Malaysia
• ISBL Module Fabrication : WHEATSTONE LNG Plant Project (CHEVRON AUSTRALIA) at Sapura Kencana Lumut Yard,
Malaysia
On-Call Freelance
THIRD PARTY INSPECTOR / INDUSTRIAL INSPECTOR - DNV-GL NOBLE DENTON
Oil and Gas / Upstream-Downstream / Third Party Client
• JDA Gas Balancing Evacuation (EVA) Project : 24” Pipeline and Spool Installation and Pre-Commissioning and Riser Tie-
In Onboard at DPDSV Kreuz Installer, DP Sarku Clementine and DP Nautical Aleesya at MUDA Field, Songkhla Thailand
• JDA Gas Balancing Evacuation (EVA) Project : Hook-Up and Commissioning (HUC) Greenfield Topside of MUDA Riser
Platform (MRP), HUC Brownfield MDA and MDPP at Onboard Sarku 2000 at MUDA Field, Songkhla Thailand
2
November 2013 – July 2014
GENERAL INSPECTOR (PIPING-MECHANICAL & STRUCTURAL) - EXXONMOBIL EXPLORATION and PRODUCTION MALAYSIA INC
(EMEPMI)
Oil and Gas / Upstream / Project Management
• TAPIS EOR Brownfields Modification and Retrofits Project (Hook-Up and Commissioning) at Tapis EOR TAPIS-A,
Onboard Accommodation Work Barge (AWB) Setia Station 2 and KSB Phase II Yard, Kemaman Malaysia
• JKA – MDPP Hook-Up and Commissioning Offshore Modification Project at JKA – MDPP, Songkhla Thailand
• EPIC of BLOCK 4 for 14” Multiphase Submarine Pipelines from Lam C to Lam 28
• EPIC of BLOCK 4 for 14” Multiphase Submarine Pipelines from Lam C to Lam B
• EPIC of BLOCK 4 for 6” Multiphase Submarine Pipelines from Zhdanov 25 to Tee Point on 30” Trunk line
• EPIC of BLOCK 4 for 12” Multiphase Submarine Pipelines from Block 4 to Tee Point on 30” Trunk line
• EPIC of BLOCK 4 for 10” Multiphase Submarine Pipelines from Zhdanov to Block 4
• EPIC of Submarine Pipelines 18” from Lam B to Block 1
• EPIC of Submarine Pipelines 20” from Block 1 to Block 2
• SHWE Field Development Project 14” Pipeline Installation Mya North to SHP X 12.5km
• SHWE Field Development Project 32” Double Joint Pipeline Installation from SHP to OGT X 110km
• JERNEH-A and JERNEH-B, BINTANG-A and BINTANG-B : BLOCK-1 Corrosion and Maintenance Program
3
July 2011 – September 2011
WELDING INSPECTOR (PIPING-MECHANICAL & STRUCTURAL) - BUREAU VERITAS ABU DHABI – SECONDED TO TAKREER
COMPANY (ADNOC)
Oil and Gas / Upstream / Project Management
• RUWAIS REFINERY EXPANSION Project EPC Package-7 Marine Facilities : GREEN DIESEL Project at Al-Ruwais, Persian
Gulf UAE
• EAST PIATU CPP (EPCPP) To LARUT A Gas 14” Pipeline Installation X 15km - S-Lay Shallow Water
• EAST PIATU CPP (EPCPP) To LARUT A Crude 14” Pipeline Installation X 15km - S-Lay Shallow Water
• LARUT Riser Stalk Installation
• PUTERI WHP to BUNGA KERTAS Pipe in Pipe 8”/12” + 4” Piggyback X 13.5km - S-Lay Shallow Water
• PUTERI WHP to BUNGA KERTAS Riser and Expansion Spool Installation
• Hook-Up and Commissioning Brownfield Project - Maintenance and Upgrading for EMEPMI Production Platform at KSB
Phase II Yard, Kemaman Terengganu
• GUMUSUT/KAKAP Offshore Installation Project : Oil Export 18” Pipeline Pipelay X 150km – S-Lay Deep Water (SABAH
SHELL) at Derrick Lay Vessel (DLV) Sapura 3000, Labuan Malaysia
• Fabrication of FPSO RUBY II PRINCESS (MISC) at Malaysia Marine Heavy Engineering Yard (MMHE), Pasir Gudang
Malaysia
2004 – 2007
QA /QC INSPECTOR – ENCO BINA ENGINEERING/KEJURUTERAAN WIJAYA/JURUNATURE
Oil and Gas / Upstream / Sub-Contractor
• Fabrication of Topsides of F23 VLAP COMPRESSION MODULE (SARAWAK SHELL) at Sime Darby Engineering Yard
(SDE), Pasir Gudang Malaysia
• Fabrication of Topsides of KUMANG and TANGGA BARAT Cluster Development Project Phase 1 (PETRONAS CARIGALI)
at Sime Darby Engineering Yard (SDE), Pasir Gudang Malaysia
• Fabrication of Topsides of HELANG Field Development Project (NIPPON OIL) at Malaysia Shipyard Engineering Yard