EQUIPMENT LIST

0.2% NO POCKET VENT 0.2% NO POCKET 6"-V-AC150-0202-B RELIEF TO


V-018
6"150# RELIEF KOD TAG
OUTLET
PI-RZF-04404-14-G-003 Length (TL/TL) mm
Inside Diameter 1219 mm (48")
4"-V-AC150-0206-B RELIEF TO
E V-018 P&T Operation
0.2% NO POCKET KOD
S 85 barg S 970 mm 0S
2.1 2.1 P&T Design
D D D PI-RZF-04404-14-G-003
Volume m3
81 barg Corrosion Allowance 3,2mm

11,75 mm
70 barg 1

S 50Barg S 250 mm
2.1
D
3.14 D NOTE 3

3"-HG-AC600-0204-B
SET 97,6Barg
1" E 2" SAMPLER
600# x 150#

F.B.
RESET
FIRE

LC
PSV GAS TO
1001 FUTURE
GAS 6"-HG-AC600-0201-B MP COMPRESSOR

MIN. 600mm
OUTLET
NOTE 2 SHEET 3

LC
4" 4" 2"
6"-PF-AC600-0101-B 600# 2"-HG-AC600-0208-B GAS TO
600# 600# UNIT JOULE-THOMSON
2" 2" 2" 6" UJT-022
600# 600# 600# 600#
WELL FLUID E1 P1 P2 E2 S1 S2 F PI-RZF-04404-14-G-004 SHEET 1
FROM PLANT L1
A
INLET 6"
600#
V-001 L3 2"
SHEET 1 FLUID B
HORIZONTAL 600# G1
INLET TWO-PHASE SEPARATOR
T1 T2 SET NLL
M-24"
2" 2"
600# 600#
L4 2"
600# C
G2 L2
D
2
4" S
3.14 D
600#

LC
DEMULSIFIER SCALE
VENT MOUNT NEAR TO V-001 INHIBITOR

MIN. 600mm
SAMPLER

FB

FB

FB
LIQUIDS TO
HEATER
3"150# 3"-PF-AC150-0203-B H-005

LC
A SDV-1022 SHEET 7
PI-RZF-04404-14-G-004; H1

2"-IA-AG150-0207-B 5 2 3

S
INSTRUMENT AIR 3.14 D

PI-RZF-04404-14-G-005

3
A FV-1024
PI-RZF-04404-14-G-004; H2

2"-IA-AG150-0XXX-B 1 SPARE 4

INSTRUMENT AIR

PI-RZF-04404-14-G-005 2"150#
DRAIN
LC OUTLET 2"-DR-AC150-0205-B 0.5%
DRIP PAN

SKID LIMIT #1

DRAIN 2"-DR-AC150-0806-B 0.5% 2"150#


THREE-PHASE SEPARATOR
V-006
SHEET 8

DRAIN 2"-DR-AC150-4004-B 0.5%


JOULE-THOMPSON UNIT
UJT-022
PI-RZF-04404-14-G-004 SHEET 1

DRAINS CHAMBER
NOTE 1
CHAMBER-02
IA
Air Vent
Energized No-Energized
E
1P/F S
D COMPANY DOCUMENTATION APPROVAL GRAPHIC SCALE

APPROVED WITH OBSERVATIONS, NAME SIGN DATE


CORRECT & ISSUE. MECHANIC.
APPROVED. PIPING
APPROVED FOR CONSTRUCTION ELECTRICAL Bolland
EXCEPT OBSERVATIONS INSTRUM.
2 ISSUE FOR CONSTRUCTION JC EG MC 26/11/15
CORRECT & ISSUE. CIVIL EPF PLANT (EARLY PRODUCTION FACILITIES)
1 ISSUE FOR CONSTRUCTION JC EG MC 12/06/15 APPROVED FOR CONSTRUCTION. PROCESS
SAFETY YACIMIENTO RINCÓN LA CENIZA
0 ISSUE FOR CONSTRUCTION JC EG MC 23/04/15 OBSERVED QA/QC
E ISSUE FOR APPROVAL BS EG MC 06/04/15 CORRECT & ISSUE.
D ISSUE FOR APPROVAL BS EG MC 04/03/15 VIEWED
ENG. COORD.
REJECTED PIPING & INSTRUMENTS DIAGRAM
ENG. MGR.
CORRECT & ISSUE. Scale : S/E GENERAL SEPARATOR
Contract / P.O. N° :
DOCUMENT N° DESCRIPTION RECEIVED: REMITTED:
Call Off N°:
REFERENCES N° NOTES REV. N° DESCRIPTION BY CKD APPV DATE APPROVAL BY TOTAL AUSTRAL DOES NOT DIMINISH ANY CONTRACTOR/VENDOR RESPONSIBILITY ON ITS CONTENT.
File : PI-RZF-04404-14-G-002 2 of 14 6