Assessment
SIF -Supplier
Information Form
Responses (Self Approved &
Assessment by YES HSSE Conduct SMA Qualified
Supplier-Pre- HSE
Qualification) Question YES
s
Complia
nt? Exceptio
SMA
n
Score?
≥3.0
NO Approval
?
YES
NO
Improve
<3.0 Improvement Plan d?
NO
To check SIF Decision for exception Conduct SMA Improvement Phase Block for PO or
Response by SQM approval by SM by HSSE ops by HSSE ops Phase Out by
SM
9 16/05/2023 © Nokia 2020 - author Muliantara.Soewarma@nokia.com
Internal use
The SMA should be reviewed periodically to ensure the supplier
qualification and capability, at a minimum every 2 years.
In cases where there have been significant changes in the
supplier's operation, type of work and scope, performance, or
requirements a review may need to take place sooner. The
schedule and plan must be maintained by CPO PE S&S.
Assurance : PE S&S
sample 30% supplier self
44 days before SMA expire, SMA to check the self
Notification to supplier for Supplier assessment quarterly
SELF RE-ASSESSMENT SELF-SMA
(Microsoft forms) Approved &
∆<0.5 Qualified
YES
<3.0
NO NO
14 days to supplier to
Archer computed the delta and sends Archer - notify
Archer - Notify Supplier SMA Self re- 30 days PE S&S reviews SMA self assessment when
notifications to supplier and PE S&S supplier Block for PO
for Self Assessment assessment in MS ∆ >0.75 (create field in Archer for PE S&S Approval)
manager or Phaseout
forms
11 16/05/2023 © Nokia 2020 - author Muliantara.Soewarma@nokia.com
Internal use
5.4 Scoring Criteria and Output
2 to Supplier has basics in place but does not meet Pending on Supplier Decision
Not Approved
<3 Nokia minimum expectations (Improve, block for PO, Phase-out)
• A Mandatory 30-day Improvement Plan is needed for suppliers scoring below 3 that we
want to maintain active.
• This plan is to be agreed at time of assessment with actions/controls put in place to
close gaps (improve SMA score equal or above 3).
• If there is an improvement plan and supplier did not improve (score is still below 3.0)
after implementing and completing the 30 days mandatory improvement plan a
supplier decision should be taken either to phase out or blocked for PO.
• All mandatory improvement plans and supplier decision should be recorded in Archer.
• Evidence of the decision should be attached in Archer supplier profile
• Improvement Plans must have Plan Owner (the one that implements the actions) and
Plan Manager (the one that validate the actions)
SMA-1.2 How does the supplier ensure that H&S is managed in their company and their work for Nokia
SMA-1.3 Assignment of H&S accountability/ responsibility and access to competent H&S resource?
B. Health and Safety Arrangements and Administration:. Roles, Responsibilities and H&S Advice/ Support
SMA-2.1 What standard of risk assessments and methods does the supplier have in place?
SMA-2.4 How comprehensive and transparent is the suppliers' approach to H&S training identification and delivery?
SMA-2.6 What process does the supplier have in place to manage incidents?
16 16/05/2023 © Nokia 2020 - author Muliantara.Soewarma@nokia.com
Internal use
C. Selection and Management of Contractors:
SMA-3.5 How is the capability and compliance of sub contractors ensured on the project?
SMA-4.1 How does the supplier ensure that everyone is fit to work at height?
SMA-4.2 What arrangements does the supplier have in place to manage work at height?
SMA-4.3 How does the supplier manage training for work at height?
SMA-5.1 Are vehicles used on the project fit for purpose and well maintained?
SMA-5.4 Are restriction placed on journeys to ensure that risks are reduced to an acceptable level?
SMA-6.1 Is everyone who works on electrical equipment appropriately Not Applicable trained?
SMA-6.3 Does a process exist to ensure that electrical faults are reported Not Applicable and rectified?
SMA-6.4 Is everyone made award of the risks of working on or adjacent to Not Applicable electrical hazards?
SMA-7.2 Is there a structured program in place to monitor levels of compliance and behavior?
SMA-7.3 Do senior managers of the company regularly visit site to monitor how work is being completed?
H. Environmental:
SMA-8.3 Does the supplier comply with regulatory and company waste management requirements?
SMA-8.4 How does the supplier ensure chemical and fuel management?
SMA-9.1 What processes does the supplier have in place for managing heavy lifts (greater than 100kg)
SMA-9.3 How does the supplier ensure that correct rigging and lifting equipment is in place for heavy lifts?
SMA-9.4 What does the supplier have in place to supervise heavy lifts?
SMA-10.1 How does the supplier manage everyone who works on street works appropriately trained?
SMA-10.2 Is everyone made aware of the risks of working on or adjacent Construction/Street Works/Civil works?
SMA-10.3 Does a process exist to ensure that faults are reported and rectified?
SMA-10.4 How does the supplier manage the level of supervision for Street works?