FIT OUT INSPECTION CHECHKLIST

TENANT: _________________________________
DATE: _________________________________
UNIT No. & FLOOR LEVEL:

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame
b. Ceiling board
II WALLS
a. Side
B. Rear
c. Partitions
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board
b. Pipes & wire installation
c. Outlets
d. Switches
e. Lighting fixtures
VII MECHANICAL WORKS
a. AC Line
b. Condensing unit
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers
b. Smoke detector
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kudoku
DATE: 03-15-18
UNIT No. & FLOOR LEVEL: 3 ground floor

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame not yet install
b. Ceiling board not yet install
II WALLS
a. Side
B. Rear
c. Partitions not yet install
IV FLOORING
a. Lobby not yet install
b. Room
c. CR (if applicable)
d. Loft (if applicable) additional slab/ steeldecking
V PLUMBING WORKS
a. Kitchen existing set-up
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet install
b. Pipes & wire installation not yet install
c. Outlets not yet install
d. Switches not yet install
e. Lighting fixtures not yet install
VII MECHANICAL WORKS
a. AC Line not yet install
b. Condensing unit not yet install
c. Location of ACU not yet install
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) exisating
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kimstaurant
DATE: 03-20-18
UNIT No. & FLOOR LEVEL: 9,10 ground floor

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame not yet
b. Ceiling board not yet
II WALLS
a. Side not yet
B. Rear
c. Partitions not yet
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable) installation of angle bar for support
V PLUMBING WORKS
a. Kitchen not yet
b. Pantry not yet
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet
b. Pipes & wire installation not yet
c. Outlets not yet
d. Switches not yet
e. Lighting fixtures not yet
VII MECHANICAL WORKS
a. AC Line not yet
b. Condensing unit not yet
c. Location of ACU not yet
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) not yet
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kimstaurant
DATE: 3/4/2018
UNIT No. & FLOOR LEVEL: 9,10 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame not yet
b. Ceiling board not yet
II WALLS
a. Side skim coating
B. Rear
c. Partitions chb laying
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable) done concrete pouring
V PLUMBING WORKS
a. Kitchen not yet
b. Pantry not yet
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet
b. Pipes & wire installation not yet
c. Outlets not yet
d. Switches not yet
e. Lighting fixtures not yet
VII MECHANICAL WORKS
a. AC Line not yet
b. Condensing unit not yet
c. Location of ACU not yet
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) not yet
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kimstaurant
DATE: 12/4/2018
UNIT No. & FLOOR LEVEL: 9,10 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame
b. Ceiling board skim coat finish soffit
II WALLS
a. Side skim coating
B. Rear
c. Partitions chb laying
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable) done concrete pouring
V PLUMBING WORKS
a. Kitchen finish tile installation
b. Pantry not yet
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet
b. Pipes & wire installation 2nd floor installation
c. Outlets not yet
d. Switches not yet
e. Lighting fixtures not yet
VII MECHANICAL WORKS
a. AC Line not yet
b. Condensing unit not yet
c. Location of ACU not yet
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) not yet
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kimstaurant
DATE: 04/25/2018
UNIT No. & FLOOR LEVEL: 9,10 ground floor

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame
b. Ceiling board skim coat finish soffit
II WALLS
a. Side skim coating/done skimcoating
B. Rear
c. Partitions chb laying/done wall cladding
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable) done concrete pouring
V PLUMBING WORKS
a. Kitchen finish tile installation
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet
b. Pipes & wire installation 2nd floor installation
c. Outlets not yet
d. Switches not yet
e. Lighting fixtures not yet
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU done installation
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) not yet
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kimstaurant
DATE: 05/29/2018
UNIT No. & FLOOR LEVEL: 9,10 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame
b. Ceiling board skim coat finish soffit
II WALLS
a. Side skim coating/done skimcoating
B. Rear
c. Partitions chb laying/done wall cladding
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable) done concrete pouring
V PLUMBING WORKS
a. Kitchen finish tile installation
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board done installation
b. Pipes & wire installation done installation
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU done installation
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) not yet
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kimstaurant
DATE: 03-13-18
UNIT No. & FLOOR LEVEL: 9,10 ground floor

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame not yet
b. Ceiling board not yet
II WALLS
a. Side not yet
B. Rear
c. Partitions not yet
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable) additional slab steel decking
V PLUMBING WORKS
a. Kitchen not yet
b. Pantry not yet
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet
b. Pipes & wire installation not yet
c. Outlets not yet
d. Switches not yet
e. Lighting fixtures not yet
VII MECHANICAL WORKS
a. AC Line not yet
b. Condensing unit not yet
c. Location of ACU not yet
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) not yet
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: ___________________________
DATE: _________________________________
UNIT No. & FLOOR LEVEL:

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame
b. Ceiling board
II WALLS
a. Side
B. Rear
c. Partitions
IV FLOORING
a. Lobby
b. Room
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board
b. Pipes & wire installation
c. Outlets
d. Switches
e. Lighting fixtures
VII MECHANICAL WORKS
a. AC Line
b. Condensing unit
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers
b. Smoke detector
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kim rose tan


DATE: 02-14-18
UNIT No. & FLOOR LEVEL: 5,6 & 3rd floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame not yet finish painting
b. Ceiling board
II WALLS
a. Side
B. Rear
c. Partitions not yet finish painting

IV FLOORING
a. Lobby finish tile installation
b. Room
c. CR (if applicable) finish tile installation
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry
c. CR (if applicable) finish pipes & fixture installation
VI ELECTRICAL WORKS
a. Panel board done installation
b. Pipes & wire installation done installation
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures not yet finish install
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU done installation
VIII FIRE PROTECTION
a. Springklers exisiting
b. Smoke detector exisiting
c. Heat detector (if applicable) none
IX SIGNAGE
X OTHERS not yet submit complete plan
Prepared by: John Michael Legaspi
FIT OUT INSPECTION CHECHKLIST

TENANT: dmv II
DATE: 02-14-18
UNIT No. & FLOOR LEVEL: 4, 3RD FLOOR

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame done installation
b. Ceiling board not yet done
II WALLS
a. Side
B. Rear
c. Partitions framing & board done installation
IV FLOORING
a. Lobby
b. Room done tiles installation
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry not yet done
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet done
b. Pipes & wire installation not yet done
c. Outlets not yet done
d. Switches not yet done
e. Lighting fixtures not yet done
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit not yet install
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kim rose tan


DATE: 03-15-18
UNIT No. & FLOOR LEVEL: 5,6 & 3rd floor

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame
b. Ceiling board painting works done already
II WALLS
a. Side
B. Rear
c. Partitions painting works done already
IV FLOORING
a. Lobby finish tile installation
b. Room
c. CR (if applicable) finish tile installation
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry
c. CR (if applicable) finish pipes & fixture installation
VI ELECTRICAL WORKS
a. Panel board done installation
b. Pipes & wire installation done installation
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU done installation
VIII FIRE PROTECTION
a. Springklers exisiting
b. Smoke detector exisiting
c. Heat detector (if applicable) none
IX SIGNAGE
X OTHERS not yet submit complete plan
Prepared by: John Michael Legaspi
FIT OUT INSPECTION CHECHKLIST

TENANT: dmv II
DATE: 02-26-18
UNIT No. & FLOOR LEVEL: 4, 3RD FLOOR

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame done installation
b. Ceiling board not yet done
II WALLS
a. Side
B. Rear
c. Partitions framing & board done installation
IV FLOORING
a. Lobby
b. Room done tiles installation
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry not yet done
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet done
b. Pipes & wire installation not yet done
c. Outlets not yet done
d. Switches not yet done
e. Lighting fixtures not yet done
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit not yet install
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: dmv II
DATE: 03-15-18
UNIT No. & FLOOR LEVEL: 4, 3RD FLOOR

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame
b. Ceiling board primer paint
II WALLS
a. Side
B. Rear
c. Partitions for final coat / painting
IV FLOORING
a. Lobby
b. Room done tiles installation
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry not yet done
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet done
b. Pipes & wire installation not yet done
c. Outlets not yet done
d. Switches not yet done
e. Lighting fixtures not yet done
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kudoku
DATE: 03-19-18
UNIT No. & FLOOR LEVEL: 3 ground floor

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame not yet install
b. Ceiling board not yet install
II WALLS
a. Side
B. Rear
c. Partitions not yet install
IV FLOORING
a. Lobby not yet install
b. Room
c. CR (if applicable)
d. Loft (if applicable) concrete slab finish already
V PLUMBING WORKS
a. Kitchen existing set-up
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet install
b. Pipes & wire installation not yet install
c. Outlets not yet install
d. Switches not yet install
e. Lighting fixtures not yet install
VII MECHANICAL WORKS
a. AC Line not yet install
b. Condensing unit not yet install
c. Location of ACU not yet install
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) exisating
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kudoku
DATE: 3/4/2018
UNIT No. & FLOOR LEVEL: 3 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame not yet install
b. Ceiling board not yet install
II WALLS
a. Side
B. Rear
c. Partitions not yet install
IV FLOORING
a. Lobby not yet install
b. Room
c. CR (if applicable)
d. Loft (if applicable) concrete slab finish already
V PLUMBING WORKS
a. Kitchen existing set-up
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board existing
b. Pipes & wire installation existing
c. Outlets not yet install
d. Switches not yet install
e. Lighting fixtures not yet install
VII MECHANICAL WORKS
a. AC Line not yet install
b. Condensing unit not yet install
c. Location of ACU not yet install
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) exisating
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kudoku
DATE: 12/4/2018
UNIT No. & FLOOR LEVEL: 3 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame skimcoat soffit
b. Ceiling board
II WALLS
a. Side skimcoat finish
B. Rear
c. Partitions skimcoat finish
IV FLOORING
a. Lobby not yet install
b. Room
c. CR (if applicable)
d. Loft (if applicable) concrete slab finish already
V PLUMBING WORKS
a. Kitchen existing set-up
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board existing
b. Pipes & wire installation existing
c. Outlets not yet install
d. Switches not yet install
e. Lighting fixtures not yet install
VII MECHANICAL WORKS
a. AC Line not yet install
b. Condensing unit not yet install
c. Location of ACU not yet install
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) exisating
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kudoku
DATE: 04/25/2018
UNIT No. & FLOOR LEVEL: 3 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame skimcoat soffit/done skimcoating
b. Ceiling board
II WALLS
a. Side skimcoat finish/done skimcoating
B. Rear
c. Partitions skimcoat finish/done skimcoating
IV FLOORING
a. Lobby not yet install
b. Room
c. CR (if applicable)
d. Loft (if applicable) concrete slab finish already
V PLUMBING WORKS
a. Kitchen existing set-up
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board existing
b. Pipes & wire installation existing
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU done installation
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) exisating
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: kudoku
DATE: 4/5/2018
UNIT No. & FLOOR LEVEL: 3 ground floor

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame wood framing
b. Ceiling board wood framing/soffit
II WALLS
a. Side skimcoat finish/done skimcoating
B. Rear
c. Partitions skimcoat finish/done skimcoating
IV FLOORING
a. Lobby floor smooth finish
b. Room
c. CR (if applicable)
d. Loft (if applicable) concrete slab finish already
V PLUMBING WORKS
a. Kitchen existing set-up
b. Pantry
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board existing
b. Pipes & wire installation existing
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU done installation
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable) exisating
IX SIGNAGE
X OTHERS

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: dmv II
DATE: 03-22-18
UNIT No. & FLOOR LEVEL: 4, 3RD FLOOR

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame
b. Ceiling board final coat/painting
II WALLS
a. Side
B. Rear
c. Partitions for final coat / painting
IV FLOORING
a. Lobby
b. Room done tiles installation
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry not yet done
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board not yet done
b. Pipes & wire installation done installation
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS
Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: dmv II
DATE: 3/4/2018
UNIT No. & FLOOR LEVEL: 4, 3RD FLOOR

ITEM REMARKS

I CEILING WORKS
a. Ceiling frame
b. Ceiling board final coat/painting
II WALLS
a. Side
B. Rear
c. Partitions final coat / painting
IV FLOORING
a. Lobby
b. Room done tiles installation
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry not yet done
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board done installation
b. Pipes & wire installation done installation
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS aircon drain not properly installed

Prepared by:
FIT OUT INSPECTION CHECHKLIST

TENANT: dmv II
DATE: 7/5/2018
UNIT No. & FLOOR LEVEL: 4, 3RD FLOOR

ITEM REMARKS
I CEILING WORKS
a. Ceiling frame
b. Ceiling board finish painting
II WALLS
a. Side
B. Rear
c. Partitions finish painting
IV FLOORING
a. Lobby
b. Room done tiles installation
c. CR (if applicable)
d. Loft (if applicable)
V PLUMBING WORKS
a. Kitchen
b. Pantry already finish
c. CR (if applicable)
VI ELECTRICAL WORKS
a. Panel board done installation
b. Pipes & wire installation done installation
c. Outlets done installation
d. Switches done installation
e. Lighting fixtures done installation
VII MECHANICAL WORKS
a. AC Line done installation
b. Condensing unit done installation
c. Location of ACU
VIII FIRE PROTECTION
a. Springklers existing
b. Smoke detector existing
c. Heat detector (if applicable)
IX SIGNAGE
X OTHERS aircon drain revised already