BIM+: NEXT LEVEL BIM MATURITY

STORY 2: HOW BIM SUPPORTS DATA-DRIVEN ASSET


OWNERSHIP

31/May/2023

1
AGENDA

• MAIN CHALLENGES & COMMON ISSUES

• CURRENT PROCESS

• THE SOLUTION

• HOW TO MATURE A BIM STRATEGY?

• THE 3 P’S APPROACH

• ACTION PLAN

• HOW BIM SUPPORTS DATA-DRIVEN ASSET OWNERS?


Main Challenges

• Tracking the changes of project’s design & construction executed

by multiple entities.

• Building Scenarios for the impacts of design changes

• The need for integration between different project life-cycle stages

• How to build the Team Capabilities & Culture Change practices.


The Common Issues
- Lack of accurate reliable project’s information

- Difficult to control the Real Estate project’s time, budget, and cost

- Difficult to record changes and avoid variations

- Difficult to monitor the assets performance

- Lack of single Source of Truth & systems integration thru project life-cycle stages

- Lack of coordination between CAPEX & OPEX Solutions

- Duplication of information and documents.


Current Process
A secured Data warehouse controlled separately by ONE Dept. and is almost isolated from the
other departments

Data Silos…

Design Construct Handover Operate Maintain Dispose


Build Before you Build (BBB)

Build Two Assets - Virtual & Physical leading to Digital Twin

The Solution is…

A Digital • An accurate digital representation for the


physical infrastructure assets with sufficient

Engineering attributes & technologies about their conditions,


performance, maintenance requirements, QHSE,

Strategy replacement and retirement.

• Provide a full controlled communication


platform throughout assets lifecycle.
HOW TO MATURE A BIM STRATEGY?
Level 2: Sharing Info. in a federated BIM Execution Level 3: Open shared information throughout the
Common Data model- Single Source of Truth- based Plan (BEP) asset lifecycle, including performance & operation
Environment on a predefined & Collaborative data
(CDE) process

Level 0: Paper Based

Level 1: Object Oriented


Level 0: Paper Based
computer readable data-model
Developed by Arcadis
The 3 P’s Approach

Training & Education Roles & Responsibilities

Configuration People
Management Pre-qualification

Info. Exchange Processes Contract & EIR


thru lifecycle
Platforms
Common Data
Software Environment

Policies & Standards


Optimizing Communication, Collaboration & Real-
How BIM time coordination
Supports Data-
Detecting & Solving Clashes prior construction
Driven Asset
Owners? Reduce VO’s cost & Support Project construction
sequences & QHSE

Providing Federated 3D models to support


AR/VR/MR

Traceable reliable detailed well-organized


documentation for the projects

Migrating reliable data by integrating with O&M and


Spatial solutions
• BIM provides scenarios in a flexible way for optimized decision-

making and provide reliable & Well-Structured Data for all lifecycle

stages.

Summary…
• A common platform that is applicable to all projects to support the

concept of

CONSTRUCTIVE DIGITAL - PHYSICAL COLLABORATION


THANK YOU! Contact details
If you have any questions.please
reach out to the contacts below.

Wajdi Mereb
Senior Manager BIM
Development Design Department
E wajdi.mereb@miral.ae