Project Description : INTERCONNECTION OF 700MMSP X 300MM, PRV AND LINEMETER

Location : PAYATAS EAST, QUEZON CITY


Contractor : R. ABALOS CONSTRUCTION CO.

BILL OF QUANTITIES
Item No. Description Unit Qty Unit Cost Amount
1. General Items 51,084.25
Mobilization/Demobilization LS 1 12,391.00 12,391.00
Health & Safety LS 1 9,293.25 9,293.25
MS STEEL PLATE (2@7DAYS) PC-DAY 14 2,100.00 29,400.00
2. Interconnection 294,150.00
Interconnection 700mmSP x 300mm HDPE - on MANHOLE LS 1.00 294,150.00 294,150.00
5. Line meter 300mm 325,400.00
Line Meter 300mm - on Chamber LS 1.00 162,700.00 162,700.00
PRV 300mm - on Chamber LS 1.00 162,700.00 162,700.00
Grand Total 670,634.25

Prepared by: Approved by:

John Paul Sugaste Jefferson Aguilar Rachell Tomas


PM, RACC NGM, MWCI FCO, MWCI