Professional Documents
Culture Documents
Equipment/Material Name: Vietnam Nisshin Technomic Phase 2 Project (JOB No.: 0-8850-20)
Equipment/Material Name: Vietnam Nisshin Technomic Phase 2 Project (JOB No.: 0-8850-20)
ISSUE PURPOSE: FC
RESULT CODE: A, B, R B
RESUBMISSION DATE:
Inspection point
No. Name of parts Supervision Content Inspection point
packaging
H: Vendor shall notify purchaser of inspection date and time. Vendor is not allowed to proceed with the tests or
Note: the inspection point are specified in the Inspection/Test Procedure V-2155-114-A-600
purchaser