Cabinet Final

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 84

AGENCY

NATIONAL ARCHIVES OF THE PHILIPPINES


Pambansang Sinupan ng Pilipinas NATIONAL HOUSING AUTHORITY

RECORDS INVENTORY AND APPRAISAL ADDRESS


ELLIPTICAL ROAD DILIMAN QUEZON

PERIOD VOLUME IN LOCATION OF FREQUENCY


RECORDS SERIES TITLE & DESCRIPTION CUBIC
COVERED METER RECORDS OF USE
Proposed Fit-outs of Record at the New GSD-
COSDD Building Documents
1 2018 1 TRD-Cabinet No. 6 as need arises

Construction of GSD/COSO Building - Final


Acceptance f Contract Document
2 2019 1 TRD-Cabinet No. 6 as need arises

Supply and Installation of Solar LED Streetlight,


Flood light and Bollard light at NHA Compound
3 Project - (Budget Allocation Documents, Bid 2018 1 TRD-Cabinet No. 6 as need arises
Documents, Contract)

Proposed Procurement of Consultancy Services


for Structural, Electrical, Auxiliary and Fire
4 Protection design Works of the Various Building 2018 1 TRD-Cabinet No. 6 as need arises
and Community Facilities for NHA Projects -
Documents
Proposed Procurement of Consultancy Services
for Structural, Electrical, Auxiliary and Fire
5 Protection design Works of the Various Building 2019 1 TRD-Cabinet No. 6 as need arises
and Community Facilities for NHA Projects -
Contract Documents
Structural Design Calculation by AC Ong for
Proposed Talipapa
6 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Health Center
7 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Livelihood (Big)
8 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Livelihood (Small)
9 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Multi-purposed Training Area
10 2019 1 TRD-Cabinet No. 6 as need arises
Structural Design Calculation by AC Ong for
Proposed Material Recovery Facility
11 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Standard Tricycle Terminal (Shed
12 Type) 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed 2-Classroom Day Care Center
13 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Multi-purposed Covered Court
14 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Market
15 2019 1 TRD-Cabinet No. 6 as need arises

Structural Design Calculation by AC Ong for


Proposed Standard COMPAC Building
16 2019 1 TRD-Cabinet No. 6 as need arises

Design Calculations (Structural, Fire-pro,


Electrical) for the Proposed 5-Storey Low-Rise
17 Building 2019 1 TRD-Cabinet No. 6 as need arises

Technical Specifications (Structural, Fire-pro,


Electrical, Auxiliary) for the Proposed 5-Storey
18 Low-Rise Building 2019 1 TRD-Cabinet No. 6 as need arises

Supply and Installation of Furnitures and


Equipment for the proposed Group Manager's
19 Office at Thrid Floor NHA Main Compound - 2019 1 TRD-Cabinet No. 6 as need arises
Documents

Renovation of the Third Floor NCR-AMO's Office


Documents from BAC
20 2019 1 TRD-Cabinet No. 6 as need arises

Renovation of the Third Floor NCR-AMO's Office


Contract Documents
21 2019 1 TRD-Cabinet No. 6 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Dazzling
1 Lite Enterprises - 22 sq.m Dome House (Folder 2016-2017 1 TRD Steel Cab. # 12 as need arises
1)
Technical Documents and Communications for
NHA and DPWH Evaluation/Approval - Dazzling
2 Lite Enterprises - 22 sq.m Dome House (Folder 2016-2017 1 TRD Steel Cab. # 12 as need arises
2)

Dazzling Lite Enterprises - Evacuation


Center/BasketBall Court
3 2016-2017 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Dazzling
4 Lite Enterprises - Health Center 2016-2017 1 TRD Steel Cab. # 12 as need arises

Ecostrong Builders Corporation - 22 sq.m


Loftable Rowhouse
5 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - E
6 Florentino³ + Associates - 22 sq.m Loftable 2015 1 TRD Steel Cab. # 12 as need arises
Rowhouse

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Jose Cris
7 Builders - 28.4 sq.m Rowhouse 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
8 Francisco J. Nakpil - FENA Roof Anchor System 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - OFIC
9 Philippines Inc. - Onduline Roofing System 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - New Era
10 Metal Forming Ind. - 26 sq. m Row House 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
11 NedSteel Construction - 22 and 26 sq.m Single 2015-2016 1 TRD Steel Cab. # 12 as need arises
Storey Row House of NedSteel Construction

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
12 NedSteel Construction - Plans, Cost Estimates, 2015-2016 1 TRD Steel Cab. # 12 as need arises
Specifications and Structural analysis

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
13 NedSteel Construction - 28.4 sq.m Single Storey 2015-2016 1 TRD Steel Cab. # 12 as need arises
Row House of NedSteel Construction
Technical Documents and Communications for
NHA and DPWH Evaluation/Approval -
14 NedSteel Construction - Plans, Cost Estimates, 2015-2016 1 TRD Steel Cab. # 12 as need arises
Specifications and Structural analysis

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Paligid
15 Development Corp. 26.0 sq.m Rowhouse 2016 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Realm
16 Home Builders - 28.6 sq.m Bungalow House 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - RFN
17 Construction Development Corp. - 28.4 sq.m 2016 1 TRD Steel Cab. # 12 as need arises
Rowhouse

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Robig
18 Builders Dev’t Corp - Rib Type Roofing and Hook 2015 1 TRD Steel Cab. # 12 as need arises
Type

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
19 SpeedSteel Dev’t Corp. - 22 sq. m RowHouse 2015 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - SKS
20 Construction and Dev’t Corp. - 26 sq.m 2015-2016 1 TRD Steel Cab. # 12 as need arises
Rowhouse with and without Bedroom

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - SKS
21 Construction and Dev’t Corp. - 28.4 sq.m 2015-2016 1 TRD Steel Cab. # 12 as need arises
Rowhouse

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - SKS
22 Construction and Dev’t Corp. - J-Bolt 2015-2016 1 TRD Steel Cab. # 12 as need arises
Connection Alternative Design

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Mr.
23 Gerardo Ledonio (CAF Technology) - 22 sq.m 2016 1 TRD Steel Cab. # 12 as need arises
Rowhouse

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Habitat
24 for Humanity - 27 sq.m Single Detached 2015 1 TRD Steel Cab. # 12 as need arises
Housing units

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Inquina
25 Development Corp - 26 sq.m Rowhouse 2016 1 TRD Steel Cab. # 12 as need arises
Technical Documents and Communications for
NHA and DPWH Evaluation/Approval -
26 Philmetal Products, Inc. - 26 and 28.4 sq.m 2017-2018 1 TRD Steel Cab. # 12 as need arises
Rowhouse

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Liciada
27 Innovations Inc. - 29.5 sq.m Rowhouse 2018 1 TRD Steel Cab. # 12 as need arises

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
28 Philippine Steelframing Corp. - 22 sq.m with 2018 1 TRD Steel Cab. # 12 as need arises
Mezzanine

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval -
29 Floridablanca Construction and Development 2018-2019 1 TRD Steel Cab. # 12 as need arises
Corp. - 28.4 sq meter Rowhouse

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - PPS
30 Building Technology - 33 sq.m Rowhouse with 2019 1 TRD Steel Cab. # 12 as need arises
Loft

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Schimdt
31 Konstruktion Systems Corp. (SKSC) - Roofing 2020 1 TRD Steel Cab. # 12 as need arises
Design Improvement

Technical Documents and Communications for


NHA and DPWH Evaluation/Approval - Liciada
32 Innovations Inc.- 26.0 and 28.4 sq.m Rowhouse 2020-present 1 TRD Steel Cab. # 12 as need arises

Comparative Analysis-Approved Housing


Model-Roofing Purlin-NHA Housing Models-MC
33 2739 2015 1 TRD Steel Cab. # 12 as need arises

DPWH Construction Materials Price Data

34 2014-2016 1 TRD Steel Cab. # 12 -

Summary of NHA and DPWH Approved Housing


Models using AITECH Accredited Technologies
35 2015-2016 1 TRD Steel Cab. # 12 as need arises

Price Ceiling Documentss for Socialized


Condominium
1 2017-2019 1 TRD Steel Cab. # 13 as need arises

HTDO Housing Models Plans

2 2014 1 TRD Steel Cab. # 13 as need arises


Standard ComFacil Tech Specs & Estimates

3 2017 1 TRD Steel Cab. # 13 as need arises

TESDA Memoranda

4 2019 1 TRD Steel Cab. # 13 as need arises

General Flow of Project Cycle Memoranda

5 2019 1 TRD Steel Cab. # 13 as need arises

BAC Conference Memoranda

6 2019 1 TRD Steel Cab. # 13 as need arises

Repair of Classrooms HULO Int. School &


Mandaluyong Science High School Technical
7 Documents 2018 1 TRD Steel Cab. # 13 as need arises

FGC Lightweight Panel by EM Cuerpo Inc.


AITECH Accreditation Documents
8 2013 1 TRD Steel Cab. # 13 as need arises

Construction of (8) Five Storey LRB Phase 4


Republic Ave., Holy Spirit Q.C. Letters, Plans &
9 Memoranda 2016 1 TRD Steel Cab. # 13 as need arises

Construction of (13) Five Storey LRB with Land


Development including Survey Works Bagong
10 Silang, Caloocan Letters, Plans & Memoranda 2015-2017 1 TRD Steel Cab. # 13 as need arises

Construction of (12) Five Storey LRB camarin


Residences 4, Caloocan City Letters, Plans &
11 Memoranda 2016 1 TRD Steel Cab. # 13 as need arises

Construction of (2) Fve Storey LRB Navotaas


Homes 3, Navotas City Plans & Memoranda
12 2017 1 TRD Steel Cab. # 13 as need arises

Camarin Residences III Caloocan City Plans

13 2009 1 TRD Steel Cab. # 13 as need arises

Construction of (10) 5-storey LRB Pleasant View


Residences with Land Development including
14 Survey Works Project Profile & Meeting 2015 1 TRD Steel Cab. # 13 as need arises
Attendance
(5) Typhoon Yolanda Permanent Housing
Washington Park Homes Bacolod City
15 Inspection Documents of AITECH Accredited 2018 1 TRD Steel Cab. # 13 as need arises
Technology used in NHA Housing

26sqm. Single Storey Rowhouse Nedsteel


Memoranda
16 2015 1 TRD Steel Cab. # 13 as need arises

NGC3 Residences (Draft) Estimates

17 2014 1 TRD Steel Cab. # 13 as need arises

Construction of (22) 5-storey LRB Pleasant View


Residences and Land Development Plans
18 2014 1 TRD Steel Cab. # 13 as need arises

Construction of (10) 5-storey MRB Tunkong,


San Jose Del Monte Bulacan STP Blueprints
19 2014 1 TRD Steel Cab. # 13 as need arises

Permaforms Inc. 26sqm Rowhouse Outline


Specification & Memoranda
20 2016 1 TRD Steel Cab. # 13 as need arises

Inspection (Draft) Report: NHA Projects that use


AITECH Accredited Technology in Negros
21 Occidental 2018 1 TRD Steel Cab. # 13 as need arises

Construction of (68) MRB Fabella Road, Bdy.


Addition Hills, Mandaluyong City Plans &
22 Memoranda 2012 1 TRD Steel Cab. # 13 as need arises

Construction of (6) 5-storey LRB with Land


Development Phase 2 MMDA Depot,
23 Manggahan, Pasig Plans & Memoranda 2015 1 TRD Steel Cab. # 13 as need arises

Renovation of (8) Executive Office, Lounge,


Board Room, Staff Room, Conference Roon
24 Plans & Estimates 2013 1 TRD Steel Cab. # 13 as need arises

Construction of (6) 5-storey LRB Pinaglabanan


St., St. Joseph, San Juan City Estimates
25 2013 1 TRD Steel Cab. # 13 as need arises

Construction of (3) 5-storey LRB Malabon


Homes 1 Longos. Malabon City Memoranda &
26 Estimates 2013 1 TRD Steel Cab. # 13 as need arises
Construction of (10) 5-storey MRB with Land
Development and Survery works Package 1
27 Pleasant Hills, san Jose Del Monte, Bulacan 2013 1 TRD Steel Cab. # 13 as need arises
Memoranda

Construction of (14) 3-storey LRB and Land


Development Site 1 Package 1 Bignay,
28 Valenzuela City Estimates 2013-2014 1 TRD Steel Cab. # 13 as need arises

Construction of (2) 5-storey LRB and Land


Development Phase 4 Package 1 (NGC) Holy
29 Spirit, Quezon City Estimates 2013-2014 1 TRD Steel Cab. # 13 as need arises

Construction of (8) 5-storey LRB and Land


Development including Surveyworks NGC
30 Package 2 Holy Spirit, Quezon City TOR & 2013 1 TRD Steel Cab. # 13 as need arises
Estimates

Construction of (8) 5-storey Tala Phase 3


Residential Building and Land Development
31 Caloocal City Estimates & Memoranda 2014 1 TRD Steel Cab. # 13 as need arises

Construction of (8) 5-storey LRB and Land


Development Camarin Residence 4, Caloocan
32 City Estimates 2016 1 TRD Steel Cab. # 13 as need arises

Construction of (7) 5-storey LRB and Land


Development and Surveyworks, Phase 3
33 Manggahan Floodway (east embankment) Pasig 2015 1 TRD Steel Cab. # 13 as need arises
Caloocan City Plans

Construction of (7) 5-storey LRB and Land


Development and Surveyworks, Phase 3
34 Manggahan Floodway (east embankment) Pasig 2015 1 TRD Steel Cab. # 13 as need arises
Caloocan City Plans

Marawi Shelter Structural Analysis

35 2017 1 TRD Steel Cab. # 13 as need arises

AFP-PNP Housing Structural Analysis

36 2017 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City COA Letters
37 2019 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City Project Acceptance
38 Package for Committee Members 2018 1 TRD Steel Cab. # 13 as need arises
Covered Walk & Pathwalk NHA Main
Compound Quezon City As Built Plan
39 (whiteprint set) 2018 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City As Built Plan
40 (whiteprint & blueprint sets) 2018 1 TRD Steel Cab. # 13 as need arises

Proposed Covered Walk & Pathwalk Site 1&2 of


NHA Main Compound Quezon City Approved
41 Plans (whiteprint, blueprint & tracing) 2016 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City Contract Documents
42 2016-2018 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City Progress Billing
43 2017-2018 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City Variation Orders &
44 Time Extensions (No. 1-3) 2017-2018 1 TRD Steel Cab. # 13 as need arises

Covered Walk & Pathwalk NHA Main


Compound Quezon City Letters & Memoranda
45 2018-2020 1 TRD Steel Cab. # 13 as need arises

Proposed Supply & Installation of Solar LED


Streetlight, floodlight & Bollard Light at NHA
46 Main Compound (Blank Schedule of Rates, 2017-2018 1 TRD Steel Cab. # 13 as need arises
Blueprints, Technical Specifications)

Proposed Gazebo-Lounging Area (Four Units) at


NHA Main Compound Approved Plans
47 2020 1 TRD Steel Cab. # 13 as need arises

Proposed Perimeter Fence for School Building


100mm Thick Wall (tracing paper)
48 2019 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse Blueprints

49 2017 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse Draft Package Proposal

50 2016 1 TRD Steel Cab. # 13 as need arises


GSD Warehouse Building Permit Documents

51 2018 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse BAC Documents Ref. 2017-133

52 2017 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse Letters, WAR Reports, Test


Results, Meeting Minutes, Excavation & Pouring
53 Permits 2018-2019 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse Perfected Contract Package

54 2018 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse Termination Documents

55 2019 1 TRD Steel Cab. # 13 as need arises

GSD Warehouse Variation Orders & Time


Extensions
56 2018 1 TRD Steel Cab. # 13 as need arises

Proposed Installation of LAN Cable for Voice


and Data of GSD/COSDD Building (Schematic
57 Plan) 2019 1 TRD Steel Cab. # 13 as need arises

Proposed Gazebo at Wellness Center


(Schematic Plan)
58 2019 1 TRD Steel Cab. # 13 as need arises

Proposed Site Development Plan/ Master Plan


Scheme for the Proposed (5) 5-storey LRB in the
59 Cities of Navotas and Malabon City 2019 1 TRD Steel Cab. # 13 as need arises

Consultative Session with Region 8 Memoranda


& Attendance Forms
60 2019 1 TRD Steel Cab. # 13 as need arises

Consultative Session with Region 6 Attendance


Forms
61 2019 1 TRD Steel Cab. # 13 as need arises

Construction Safety & Health Seminar


Accomplished Speakers' Evaluation Forms
62 2018 1 TRD Steel Cab. # 13 as need arises
End User's Manual Launching, Housing
Technology Fair & Exhibit Letters & Memoranda
63 2019 1 TRD Steel Cab. # 13 as need arises

Mr. Labuntog Portable Water Treatment


Assembly Letters & Memoranda
64 2018 1 TRD Steel Cab. # 13 as need arises

CEPC Letters & Memoranda

65 2018-2019 1 TRD Steel Cab. # 13 as need arises

CEPC Letters & Memoranda

66 2020-2021 1 TRD Steel Cab. # 13 as need arises

GAD T-Shirt 2,600 pcs Procurement Package

67 2021 1 TRD Steel Cab. # 13 as need arises

Alakor Corporation/Waffle-Crete Precast


Reinforced Cement Structure - AITECH
1 Application Documents 2020 1 TRD Steel Cab. # 14 as need arises

Hausland Development Corporation/400 and


750 psi Load Bearing Walls (CHB) - AITECH
2 Application Documents 2020 1 TRD Steel Cab. # 14 as need arises

Blue Ocean Chemtrade Inc./ Barchip 48 -


AITECH Application Documents
3 2020 1 TRD Steel Cab. # 14 as need arises

2019 Advance Construction Technologies Corp./


Steel Homes - AITECH Application Documents
4 2020 1 TRD Steel Cab. # 14 as need arises

Global Teleconstruction Specialist, Inc./ Foam


Concrete Technology using RBM Machine -
5 AITECH Application Documents 2020 1 TRD Steel Cab. # 14 as need arises

NBCDC Corp./ Steel Wall Sandwich Panel -


AITECH Application Documents
6 2020 1 TRD Steel Cab. # 14 as need arises

Alpes Verdes International Corporation - AV88


Corp./ M Wall and M Floor Panel - AITECH
7 Application Documents 2020 1 TRD Steel Cab. # 14 as need arises
Next Century Building Systems Inc./ M2 Panel
(Building System) - AITECH Application
8 Documents 2020 1 TRD Steel Cab. # 14 as need arises

Framego 101 Corporation/ Proposed Cold


Formed Steel Framing Structure - AITECH
9 Application Documents 2020 1 TRD Steel Cab. # 14 as need arises

Ergo E-Blocks Inc./Ergo E-Blocks Integrated


Building System - AITECH Application
10 Documents 2020 1 TRD Steel Cab. # 14 as need arises

SYU-Group Systech Corporation/ Polywall -


AITECH Application Documents
11 2020 1 TRD Steel Cab. # 14 as need arises

Sino-Philippine New Environmental


Construction Building Materials Inc./
12 Prefabricated Environmental Fiberboard Panel - 2020 1 TRD Steel Cab. # 14 as need arises
AITECH Application Documents

Archipelago 7000 Holdings Inc./ A 7000 MGO


Structural Insulated Panels - AITECH Application
13 Documents 2020 1 TRD Steel Cab. # 14 as need arises

BEC Specialist Inc./ Safe Affordable Modular


Housing Technology (SAM-HT)
14 2020 1 TRD Steel Cab. # 14 as need arises

Bestank Manufacturing Corp./ Filtering Septic


Tank - AITECH Application Documents
15 2020 1 TRD Steel Cab. # 14 as need arises

Dasco Global Construction and Development


Corp./ Prefabricated Post-Tensioned
16 Superstructure System - AITECH Application 2020 1 TRD Steel Cab. # 14 as need arises
Documents

Base Bahay Foundation, Inc./ Cement Bamboo


Frame Technology
17 2020 1 TRD Steel Cab. # 14 as need arises

Schimdt Konstruktion Systems Corp./ SKS


Structural Steel Framing System - AITECH
18 Application Documents 2020 1 TRD Steel Cab. # 14 as need arises

Agtekpin Bricks Manufacturing/ Agtekpin Bricks


- AITECH Application Documents
19 2020 1 TRD Steel Cab. # 14 as need arises
Yunhap Plastic Corporation/ Plastic Three
Chamber Purifying Septic - AITECH Application
20 Documents 2020 1 TRD Steel Cab. # 14 as need arises

Housing Fair 2013 Files

21 2013 1 TRD Steel Cab. # 14 as need arises

Starken Autoclaved Aerated Concrete - AITECH


Application Documents
22 2020 1 TRD Steel Cab. # 14 as need arises

8990 Cebu Housing Development Corp./ Deca


Homes Precast Technology for Housing - AITECH
1 Application Documents 2015 1 TRD Steel Cab. # 15 as need arises

RFN Construction & Development Corp./


Versatech - AITECH Application Documents
2 2015 1 TRD Steel Cab. # 15 as need arises

United Steel Tech Int'l Corp./ Steeltech Metal


Decking - AITECH Application Documents
3 2015 1 TRD Steel Cab. # 15 as need arises

Central Lumber Corporation/ Gardner Fiber


Cement - AITECH Application Documents
4 2015 1 TRD Steel Cab. # 15 as need arises

OFIC Philippines Inc./ Onduline Roofing -


AITECH Application Documents
5 2015 1 TRD Steel Cab. # 15 as need arises

Knauf Gypsum (Thailand) Limited/ Gypsum


Boards for Walls and Partitions - AITECH
6 Application Documents 2015 1 TRD Steel Cab. # 15 as need arises

Tagumpay IEM Developmeny Inc./ Fiber


Cement EPS - AITECH Application Documents
7 2015 1 TRD Steel Cab. # 15 as need arises

Philmetal Products Inc./ Spander & Durawide -


AITECH Application Documents
8 2015 1 TRD Steel Cab. # 15 as need arises

CDMC Shelter Dome Technology/ Monolithic


Dome Center - AITECH Application Documents
9 2015 1 TRD Steel Cab. # 15 as need arises
Hausland / Load Bearing CHB - AITECH
Application Documents
10 2012 1 TRD Steel Cab. # 15 as need arises

Renovation of Third Floor AMO's Office (Group


Manager's Office) Project Documents
11 2020 1 TRD Steel Cab. # 15 as need arises

Solar LED Streetlight, Flood light & Bollard light


Project Documents
12 2019 1 TRD Steel Cab. # 15 as need arises

Housing Fair Documents

13 2020 1 TRD Steel Cab. # 15 as need arises

Webinar on Land and Sea Technologies


Documents
14 2020 1 TRD Steel Cab. # 15 as need arises

SRC International Panel Systel Inc. / SRC Panel

1 2016 1 TRD Steel Cab. #16 as need arises

Sterling Construction and Development


Corporation / Plaswall
2 2016 1 TRD Steel Cab. #16 as need arises

Next Century Building Systems Inc. / M2 Panel


(Wall Panel)
3 2016 1 TRD Steel Cab. #16 as need arises

Philippine Construction Consortium Corporation


/ PPS Technology
4 2016 1 TRD Steel Cab. #16 as need arises

Blueplot Development Corporation / Sandwich


Propor Panels and Steel Bar Truss Deck System
5 2016 1 TRD Steel Cab. #16 as need arises

MDC Concrete Corporation / MDC Precast Wall


Panel
6 2016 1 TRD Steel Cab. #16 as need arises

Boral Plasterboard Philippines Inc. / USG Boral


12mm Thick Standard Core Plasterboard
7 2016 1 TRD Steel Cab. #16 as need arises
Unimore Trading Corporation / Pre-Engineered
Housing System
8 2016 1 TRD Steel Cab. #16 as need arises

Base Bahay Inc. / Cement Bamboo Frame


Technology
9 2016 1 TRD Steel Cab. #16 as need arises

Dazzling Lite Enterprises / Disaster Resistant


Dome House (Monolithic Dome)
10 2016 1 TRD Steel Cab. #16 as need arises

Pilipinas Dongyue Autoclave Aerated Concrete


Manufacturing Inc. / Autoclave Aerated
11 Concrete 2016 1 TRD Steel Cab. #16 as need arises

Floridablanca Construction and Development


Corporation / Precast Concrete Panel Structure
12 2016 1 TRD Steel Cab. #16 as need arises

Philippine Steel Framing Corporation / Housetek

13 2016 1 TRD Steel Cab. #16 as need arises

Inquina Development Corporation / Sandwich


Propor Panels with H Steel Structure
14 2016 1 TRD Steel Cab. #16 as need arises

Peerless (802nd Infantry Brigade) Cooperative /


Conform
15 2017 1 TRD Steel Cab. #16 as need arises

Unimasters Conglomeration Inc. / Ecopid Wall


Panel
16 2017 1 TRD Steel Cab. #16 as need arises

Corporate Holdings Management, Inc. / Panel


Block
17 2017 1 TRD Steel Cab. #16 as need arises

Jackbilt Industries, Inc. / T-Joist Floor and Roof


Deck System
18 2017 1 TRD Steel Cab. #16 as need arises

Jacintocolor Steel, Inc. / Typhoon Resilient Pre-


Fabricated Steel Frame
19 2017 1 TRD Steel Cab. #16 as need arises
Philmetal Products Inc. / Galvaframe

20 2017 1 TRD Steel Cab. #16 as need arises

Pilipinas Dongyue Autoclave Aerated Concrete


Manufacturing Inc. / Autoclave Aerated
21 Concrete 2017 1 TRD Steel Cab. #16 as need arises

Yunhap Plastic Corporation / Plastic Three


Chamber Septic Tank
22 2017 1 TRD Steel Cab. #16 as need arises

Carvitt Worldwide Import Corporation /


Autoclave Aerated Concrete
23 2017 1 TRD Steel Cab. #16 as need arises

Philippine Steel Framing Corporation / Galva


Steel Truss
24 2017 1 TRD Steel Cab. #16 as need arises

Bicol State College of Applied Science and


Technology / Biscast Low Cost Housing
25 2017 1 TRD Steel Cab. #16 as need arises

Philmetal Products Inc. / Spandek Roofing


System
26 2017 1 TRD Steel Cab. #16 as need arises

Tanay Industries Corporation / Lucky HDPE


Septic Tank
27 2017 1 TRD Steel Cab. #16 as need arises

Mando Winia Construction / Steel Wall


Sandwich Panel
28 2017 1 TRD Steel Cab. #16 as need arises

Wallcrete Company Inc. / Wallcrete Prefab


Fences
29 2017 1 TRD Steel Cab. #16 as need arises

Wallcrete Company Inc. / Wallcrete Prefab


Technology
30 2017 1 TRD Steel Cab. #16 as need arises

Vicente Lao Construction / Shandong Yitong


Autoclave Aerated Concrete
31 2017 1 TRD Steel Cab. #16 as need arises
Greenway Toilet Solutions / Green Eco Toilet
System
32 2017 1 TRD Steel Cab. #16 as need arises

AAC Lightweight Block Corporation / AAC by


Lightstrong Block
33 2017 1 TRD Steel Cab. #16 as need arises

BEC Specialist Philippines Inc. / Safe and


Modular Housing Technology (SAMHT)
34 2017 1 TRD Steel Cab. #16 as need arises

Zumyrphil Construction, Inc. / Precast Concrete

35 2017 1 TRD Steel Cab. #16 as need arises

Ergo Eblocks Philippines, Inc. / Ergo Eblocks


Integrated Building System
36 2017 1 TRD Steel Cab. #16 as need arises

Tigerbilt Enterprise / Structural Insulated Panel

37 2017 1 TRD Steel Cab. #16 as need arises

Bestank Manufacturing Corporation /


Polyethelene Tank
38 2018 1 TRD Steel Cab. #16 as need arises

Connovate Philippines Inc. / Connovate Precast


Wall Panel
39 2018 1 TRD Steel Cab. #16 as need arises

Base Bahay Foundation / Cement Bamboo


Frame Technology
40 2018 1 TRD Steel Cab. #16 as need arises

Julio & Florentina Ledesma Foundation Inc. /


San Carlos Philippine Enviro-Blox
41 2018 1 TRD Steel Cab. #16 as need arises

Liciada Innovation Inc. / Interlocking Brick


Building System
42 2018 1 TRD Steel Cab. #16 as need arises

Philippine Steel Framing Corporation / Housetek

1 2018 1 TRD Steel Cab. #17 as need arises


Philippine Steel Framing Corporation /
Teknocrete
2 2018 1 TRD Steel Cab. #17 as need arises

Biadora Block Philippines, Inc. / Samobi Blocks

3 2018 1 TRD Steel Cab. #17 as need arises

Unimore Trading / Pre-Engineered and Pre-


Fabricated Housing System
4 2018 1 TRD Steel Cab. #17 as need arises

Panel-It Concrete Solution / Politerm Wall

5 2018 1 TRD Steel Cab. #17 as need arises

Schmidt Konstruktion Systems Corporation


(SKSC) / SKS Steel Framing System
6 2018 1 TRD Steel Cab. #17 as need arises

Yunhap Plastic Corporation / Three Chamber


Plastic Septic Tank
7 2018 1 TRD Steel Cab. #17 as need arises

United Power Systems Philippines, Inc. / UPSPI


Expandable-Portable-Foldable Multi-Purpose
8 Facility (Permanent) 2018 1 TRD Steel Cab. #17 as need arises

Shera Building Solution Philippines / Shera Fiber


Cement Board
9 2018 1 TRD Steel Cab. #17 as need arises

Dazzling lite Enterprises / Monolithic Dome


House
10 2018 1 TRD Steel Cab. #17 as need arises

Palmeco Philippines Corporation / Palmeco


Board
11 2018 1 TRD Steel Cab. #17 as need arises

Floridablanca Construction and Development


Corporation / Precast Concrete Panel Structure
12 2018 1 TRD Steel Cab. #17 as need arises

Sidlakpinoy, Inc. / Sidlakan Firebricks

13 2018 1 TRD Steel Cab. #17 as need arises


James Hardie Philippines Inc. / Hardieflex Fiber
Cement Board
14 2018 1 TRD Steel Cab. #17 as need arises

Liciada Innovation Inc. / FCS Interlocking Brick


Building System (For Renewal)
15 2018 1 TRD Steel Cab. #17 as need arises

Jacintocolor Steel Inc. / Typhoon Resilient Pre-


Fabricated Steel Frame
16 2018 1 TRD Steel Cab. #17 as need arises

Connovate Philippines Inc. / Connovate Pre-Cast


Wall Panel
17 2018 1 TRD Steel Cab. #17 as need arises

Lexus Industrial Enterprise Corporation / PPS


Building Technology
18 2018 1 TRD Steel Cab. #17 as need arises

Cavite Form Modules / JJM Wall Formmtile

19 2019 1 TRD Steel Cab. #17 as need arises

Smart Masonry Philippines / Smart Masonry


System
20 2019 1 TRD Steel Cab. #17 as need arises

Kele Philippine Project Inc. / Cellate Structural


System
21 2019 1 TRD Steel Cab. #17 as need arises

Philmetal Product Inc. / Galvaframe

22 2019 1 TRD Steel Cab. #17 as need arises

Permaforms Inc. / Permaforms Wall Panel

23 2019 1 TRD Steel Cab. #17 as need arises

Spancrete Concrete Structure / Precast Hollow


Core Slab and T-Joist Floor System
24 2019 1 TRD Steel Cab. #17 as need arises

Eco Green Panel Solution Housing Corporation /


Eco Green Panel Board
25 2019 1 TRD Steel Cab. #17 as need arises
PT Etex Building Performance, Indonesia / Cebu
Evergreen Industries Inc. / Kalsi Fiber Cement
26 Board 2019 1 TRD Steel Cab. #17 as need arises

Bec Specialist Inc. / Safe and Modular Housing


Technology (SAM HT)
27 2019 1 TRD Steel Cab. #17 as need arises

TAC-JCB Systems Inc. / TAC System Formwork

28 2019 1 TRD Steel Cab. #17 as need arises

United Steel Technology International


Corporation / Steeltech Pre-Painted G.I. Roofing
29 2019 1 TRD Steel Cab. #17 as need arises

Nedsteel Construction Development


Corporation / Lightgauge Steelframing System
30 2019 1 TRD Steel Cab. #17 as need arises

JBC Innotech Corporation / Graditel


Construction Corporation / JBC Wall Panel
31 2019 1 TRD Steel Cab. #17 as need arises

Next Century Building Systems Inc. / M2 Panel


(Wall Panel)
32 2019 1 TRD Steel Cab. #17 as need arises

FrameGo 101 Corporation / Proposed Cold


Formed Steel Framing Structure
33 2019 1 TRD Steel Cab. #17 as need arises

Alpes Verdes International Corporation / M


Wall and M Floor Panel
34 2019 1 TRD Steel Cab. #17 as need arises

China-Philippines Wall Tech Systems Inc. /


Fahstwalll
35 2019 1 TRD Steel Cab. #17 as need arises

Heijin International Trading Corporation / EPS


Cement Sandwich Panel
36 2019 1 TRD Steel Cab. #17 as need arises

Sterling Construction and Development


Corporation / Plaswall
37 2019 1 TRD Steel Cab. #17 as need arises
SRC International Panel System, Inc. / Steel
Reinforced Concrete Panel
38 2019 1 TRD Steel Cab. #17 as need arises

Solidgroup Technologies Corporation /


Myhouse Modular Building Technology
39 2019 1 TRD Steel Cab. #17 as need arises

Starken Philippines, Inc. / Autoclave Aerated


Concrete
40 2019 1 TRD Steel Cab. #17 as need arises

JEA Steel Industries / JEA Light Steel Frames

41 2019 1 TRD Steel Cab. #17 as need arises

Pilipinas Dongyue Autoclave Aerated Concrete


Manufacturing, Inc. / Autoclave Aerated
42 Concrete 2019 1 TRD Steel Cab. #17 as need arises

Modularis Ingeniare, Inc. / Precast Concrete Box


System Modular House
43 2019 1 TRD Steel Cab. #17 as need arises

Pioneer Specialty Building Systems Inc. /


Pioneer Ecosips (Fiber Cement Board Skin)
44 2019 1 TRD Steel Cab. #17 as need arises

Megawide Construction Corporation /


Prefabricated Concrete Products (Building
45 Components) 2019 1 TRD Steel Cab. #17 as need arises

Tanay Industries Corporation / Lucky HDPE


Septic Tank
46 2019 1 TRD Steel Cab. #17 as need arises

ABT Insulpanel Philippines, Inc. / Compressed


Agricultural Fiberboard (CAF)
47 2019 1 TRD Steel Cab. #17 as need arises

AITECH Plans - Philippine Construction


Consortium Corporation
1 2017 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Lexus Industrial Enterprise


Corp./PPS Building Technology
2 2015 1 TRD Steel Cab. # 19 as need arises
AITECH Plans - AT and G

3 2013 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Framego 101 Corporation

4 2019 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Dazzling Lite Enterprises

5 2016 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Blueplot Development Corp.

6 2016 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Solid Manila

7 2015 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Imperial Homes

8 2018 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Philmetal Products, Inc.

9 2016 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Greencrest Corp.

10 2016 1 TRD Steel Cab. # 19 as need arises

AITECH Plans - Panelflex Inc.

11 2014 1 TRD Steel Cab. # 19 as need arises

8990 Holding Inc. Plans

12 2019 1 TRD Steel Cab. # 19 as need arises

Original Plans - NHA Road Plan

13 2011-2012 1 TRD Steel Cab. # 19 as need arises

Blueprint Copy - NHA Road Plan

14 2011-2012 1 TRD Steel Cab. # 19 as need arises


NHA Road Plan Proposal Cha Construction

15 2011-2012 1 TRD Steel Cab. # 19 as need arises

26.0 sq. m Conventional Plans

16 2016 1 TRD Steel Cab. # 19 as need arises

Three Storey School Building Plans and


Specifications
17 2016 1 TRD Steel Cab. # 19 as need arises

Request for Design of Comfacil - Plans from


Regional Office
18 2016 1 TRD Steel Cab. # 19 as need arises

Iligan Vista Village Plans- A4 Size

19 2020 1 TRD Steel Cab. # 19 as need arises

Community Facilities Blueprint Plans

20 2019 1 TRD Steel Cab. # 19 as need arises

Technical Specifications - Construction of


Covered Court Multi Purpose Center
21 2019 1 TRD Steel Cab. # 19 as need arises

Plans - Naga City Resettlement

22 2018 1 TRD Steel Cab. # 19 as need arises

12 Twelve Storey LRB

23 2018 1 TRD Steel Cab. # 19 as need arises

Caoayan Resettlement Project

24 2018 1 TRD Steel Cab. # 19 as need arises

Modified Standard NHA Medium Rise Building

25 2018 1 TRD Steel Cab. # 19 as need arises

Proposed EP Contractors Inc - 5 Storey


Commercial and Office Building
26 2018 1 TRD Steel Cab. # 19 as need arises
Original Approved Plans - SKS Construction and
Dev’t Corp. - 26 sq.m Rowhouse with Bedroom
1 2015-2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - SKS Construction and


Dev’t Corp. - 26 sq.m Rowhouse without
2 Bedroom 2015-2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - SKS Construction and


Dev’t Corp. - 28.4 sq.m Rowhouse
3 2015-2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Schimdt Konstruktion


Systems Corp. (SKSC) - Roofing Design
4 Improvement 2020 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Floridablanca


Construction and Development Corp. - 28.4 sq
5 meter Rowhouse 2018-2019 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - NedSteel


Construction - 26 sq.m Single Storey Row House
6 of NedSteel Construction 2015-2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - NedSteel


Construction - 28.4 sq.m Single Storey Row
7 House of NedSteel Construction 2015-2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Philmetal Products,


Inc. - 28.4 sq.m Rowhouse
8 2017-2018 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Philmetal Products,


Inc. - 26.0 sq.m Rowhouse
9 2017-2018 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Paligid Development


Corp. 26.0 sq.m Rowhouse
10 2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - RFN Construction


Development Corp. - 28.4 sq.m Rowhouse
11 2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Permaforms Inc. -


28.6 sq.m Bungalow House
12 2015 1 TRD Steel Cab. # 20 as need arises
Original Approved Plans - Permaforms Inc. -
22.0 sq.m Bungalow House
13 2015 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Inquina Development


Corp - 26 sq.m Rowhouse
14 2016 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - E Florentino³ +


Associates - 22 sq.m Loftable Rowhouse
15 2015 1 TRD Steel Cab. # 20 as need arises

Original Approved Plans - Ecostrong Builders


Corporation - 22 sq.m Loftable Rowhouse
16 2015 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Permaforms Inc. - 28.6


sq.m Bungalow House
17 2015 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Permaforms Inc. - 22.0


sq.m Bungalow House
18 2015 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - NedSteel Construction


- 26 sq.m Single Storey Row House of NedSteel
19 Construction 2015-2016 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - NedSteel Construction


- 28.4 sq.m Single Storey Row House of
20 NedSteel Construction 2015-2016 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - SKS Construction and


Dev’t Corp. - 26 sq.m Rowhouse without
21 Bedroom 2015-2016 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Schimdt Konstruktion


Systems Corp. (SKSC) - Roofing Design
22 Improvement 2020 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Philmetal Products,


Inc. - 28.4 sq.m Rowhouse
23 2017-2018 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Philmetal Products,


Inc. - 26.0 sq.m Rowhouse
24 2017-2018 1 TRD Steel Cab. # 20 as need arises
Blueprint Copy of Plans - Ecostrong Builders
Corporation - 22 sq.m Loftable Rowhouse
25 2015 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Floridablanca


Construction and Development Corp. - 28.4 sq
26 meter Rowhouse 2018-2019 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - RFN Construction


Development Corp. - 28.4 sq.m Rowhouse
27 2016 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Paligid Development


Corp. 26.0 sq.m Rowhouse
28 2016 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - E Florentino³ +


Associates - 22 sq.m Loftable Rowhouse
29 2015 1 TRD Steel Cab. # 20 as need arises

Blueprint Copy of Plans - Dazzling Lite


Enterprises - 22 sq.m Dome House
30 2016-2017 1 TRD Steel Cab. # 20 as need arises

Proposed Wellness Center Complete Working


Drawings
1 2016 1 TRD Steel Cab. # 21 as need arises

(As-Built Plans) Wellness Center Complete


Working Drawings
2 2017 1 TRD Steel Cab. # 21 as need arises

Proposed Exhibit Center Complete Working


Drawings
3 2014 1 TRD Steel Cab. # 21 as need arises

(As-Built Plans) Housing Technology Resource


and Exhibit Center Complete Working Drawings
4 2017 1 TRD Steel Cab. # 21 as need arises

NHA-GSD Warehouse Complete Working


Drawings
5 2014 to 2017 1 TRD Steel Cab. # 21 as need arises

(As-Built Plans) NHA Clubhouse

6 2014 1 TRD Steel Cab. # 21 as need arises


Proposed Covered Walk and Pathwalk at Site 1
and Site 2 of NHA Main Compound
7 2016 1 TRD Steel Cab. # 21 as need arises

Proposed New Annex (GSD Building) Complete


Working Drawings
8 2015 1 TRD Steel Cab. # 21 as need arises

Proposed Low-Rise Building 1 Structural


Drawings
9 2015 1 TRD Steel Cab. # 21 as need arises

Thirteen (13) Five-Storey Low-Rise Residential


Buildings with Land Development Including
10 Survey Works Bagong Silang Residences - 1 TRD Steel Cab. # 21 as need arises
Revised Foundation Plans
2018

11 1 as need arises

Multi-Purpose Covered Court Complete


Working Drawings
12 2015 to 2018 1 TRD Steel Cab. # 21 as need arises

Proposed Multi-Purpose Training Area


Structural Working Drawings
13 2015 1 TRD Steel Cab. # 21 as need arises

Plans- NHA Multipurpose Covered Court

1 2018 1 TRD Steel Cab. # 22 as need arises

As Built Plans - GSD-COSO Building

2 2018 1 TRD Steel Cab. # 22 as need arises

Plans-2-Storey Employee Staff House

3 2012 1 TRD Steel Cab. # 22 as need arises

Plans - Covered Walk and Path Walk

4 2018 1 TRD Steel Cab. # 22 as need arises

Master Development Plan

5 2018 1 TRD Steel Cab. # 22 as need arises


AITECH Committee Meeting Materials

6 2014-2019 1 TRD Steel Cab. # 22 as need arises

AITECH Minutes of the Meeting

7 2015-2020 1 TRD Steel Cab. # 22 as need arises

List of AITECH Accredited Technologies

8 2012-2019 1 TRD Steel Cab. # 22 as need arises

AITECH Certificates

9 2013-present 1 TRD Steel Cab. # 22 as need arises

Plant and Site Visit List

10 2013-2020 1 TRD Steel Cab. # 22 as need arises

AITECH Manuals

11 2013-2019 1 TRD Steel Cab. # 22 as need arises

AITECH Consolidated Reports

12 2013-present 1 TRD Steel Cab. # 22 as need arises

AITECH Documents

13 2012-2017 1 TRD Steel Cab. # 22 -


ORGANIZATIONAL UNIT TELEPHONE NO.:

L HOUSING AUTHORITY HOUSING TECHNOLOGY AND TECHNICAL RESEARCH DEPT. 8790-0800 loc. 420-422

PERSON-IN-CHARGE OF FILES D
A
OAD DILIMAN QUEZON CITY MERRY LYN L. DELOS REYES T NOVEMBER 02, 2021
E
P
FREQUENCY TIME VALUE UTILITY VALUE RETENTION PERIOD R
DUPLICATION EDISPOSITION PROVISION
OF USE T/P Adm / F / L / Arc Active Storage Total P
A
R
E After Project Final
as need arises 1 P Technical 5 5 Acceptance
D

After Project Final


as need arises 1 P Technical 5 5
Acceptance

After Project Final


as need arises 1 P Technical 5 5
Acceptance

After Project Final


as need arises 1 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5 Acceptance

After Project Final


as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5 Acceptance
After Project Final
as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 3 P Technical 5 5
Acceptance

After Project Final


as need arises 1 P Technical 5 5 Acceptance

After Project Final


as need arises 2 P Technical 5 5
Acceptance

as need arises 1 P Technical 5 5 After Project Final


Acceptance

After Project Final


as need arises 1 P Technical 5 5
Acceptance

After Project Final


as need arises 1 P Technical 5 5
Acceptance

After Project Final


as need arises 1 P Technical 5 5
Acceptance

After Project Final


as need arises 9 P Technical 5 5
Acceptance

After Project Final


as need arises 1 P Technical 5 5 Acceptance

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Revision


as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

- 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P F 5 5 After Updated

as need arises 1 P Technical 5 5 After Revision


as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Legal Permanent Permanent After Amended

as need arises 1 P Technical Permanent Permanent After Amended

as need arises 1 P Technical 5 5 After Amended

as need arises 1 P Technical 3 3 After Project Turnover

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Adm 3 3 After Project Completion


as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Adm 3 3 After Revision

as need arises 1 P Technical 1 1 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision


as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 5 5 After Project Completion

as need arises 1 P Technical 5 5 After Project Completion

as need arises 1 P Technical 5 5 After Project Completion

as need arises 1 P Technical 3 3 After Project Acceptance


as need arises 1 P Technical 5 5 Archive

as need arises 1 P Technical 5 5 Archive

as need arises 1 P Technical 5 5 Archive

as need arises 1 P Technical Permanent Permanent Archive

as need arises 1 P Finance Permanent Permanent Archive

as need arises 1 P Technical 5 5 After Project Acceptance

as need arises 1 P Adm/ Technical 5 5 After Amended

as need arises 1 P Technical 3 3 After Updated

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Acted Upon

as need arises 1 P Technical 3 3 After Revision


as need arises 1 P Technical Permanent Permanent After Revision

as need arises 1 P Technical Permanent Permanent After Revision

as need arises 1 P Technical Permanent Permanent After Revision

as need arises 1 P Technical/ Legal Permanent Permanent After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Revision

as need arises 1 P Technical 3 3 After Amended

as need arises 1 P Legal 3 3 After Amended

as need arises 1 P Legal 3 3 After Amended

as need arises 1 P Legal 3 3 After Amended


as need arises 1 P Technical Permanent Permanent After Acted Upon

as need arises 1 P Technical Permanent Permanent After Acted Upon

as need arises 1 P Technical 3 3 After Acted Upon

as need arises 1 P Technical 3 3 After Acted Upon

as need arises 1 P F/L 3 3 After Acted Upon

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


After Project Final
as need arises 1 P Technical 3 3
Acceptance

After Project Final


as need arises 1 P Technical 3 3
Acceptance

as need arises 1 P Technical 3 3 Archive

as need arises 1 P Technical 3 3 Archive

After Project Final


as need arises 1 P Technical 3 3
Acceptance

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal


as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision


as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision


as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Project Turnover


as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Project Turnover

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1 P Technical 5 5 After Revision

as need arises 1

as need arises 1

as need arises 1

as need arises 1

as need arises 1 P Technical 3 3 After Revision


as need arises 1 P Technical 5 5 Archive

as need arises 1 P Technical 5 5

as need arises 1 P Technical 5 5 After Updated

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 3 3 After Renewal

as need arises 1 P Technical 5 5 Archive

as need arises 1 P Technical 5 5 Archive

- 1 P Technical 5 5 Archive
oc. 420-422

R 02, 2021

N PROVISION

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance
ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

ject Final
tance

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

evision
evision

evision

evision

evision

evision

evision

evision

evision

evision

evision

pdated

evision
evision

mended

mended

mended

ct Turnover

enewal

evision

evision

evision

ct Turnover

ct Turnover

Completion
ct Turnover

evision

evision

evision

evision

evision

evision

evision

evision

evision

evision

evision
evision

evision

evision

evision

evision

evision

evision

evision

Completion

Completion

Completion

Acceptance
hive

hive

hive

hive

hive

Acceptance

mended

pdated

evision

evision

ed Upon

evision
evision

evision

evision

evision

evision

evision

evision

evision

mended

mended

mended

mended
ed Upon

ed Upon

ed Upon

ed Upon

ed Upon

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
ject Final
tance

ject Final
tance

hive

hive

ject Final
tance

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal

enewal
evision

evision

evision

evision

evision

evision

evision

evision

evision

evision

evision

evision
evision

evision

evision

evision

evision

evision

evision

evision

evision

evision

evision

evision
evision

evision

evision

evision

evision

evision

ct Turnover

ct Turnover

ct Turnover

ct Turnover

ct Turnover

ct Turnover
evision

ct Turnover

evision

evision

evision

evision

evision

evision
hive

pdated

enewal

enewal

hive

hive

hive

You might also like