SOP - 1.5 LTR 3C Stuffing & Packing TML Pune - APL Logistics
SOP - 1.5 LTR 3C Stuffing & Packing TML Pune - APL Logistics
1. Purpose.....................................................................................................................................2
2. Scope........................................................................................................................................2
3. Responsibility...........................................................................................................................2
4. Procedure.................................................................................................................................2
4.1 Day wise Activities..................................................................................................................2
4.2 Parts Description.....................................................................................................................4
4.3 Collection & Receiving of Parts...............................................................................................4
4.4 Handover of Dunnage’s & FLCs...............................................................................................5
4.5 Stuffing of Parts in to FLC Box.................................................................................................5
4.6 Labelling & Stickering of Dispatch List on FLC Box...................................................................6
4.7 Update of Assets Tracker........................................................................................................7
4.8 Handover of Parts to TML.......................................................................................................7
4.9 Record of Consignment No. .......................................................................................................7
4.10 Maintaining of Log book...........................................................................................................7
4.11 Daily Dispatch report................................................................................................................7
4.12 Process Complete......................................................................................................................7
5. Contact Details..........................................................................................................................8
2. Scope
This document provides outlines of responsible person to carry out how the material
is handled and stuffed Followed by , handover of Dunnage’s & FLC, Checklist of parts,
consolidation, Packing, Stuffing and Final Handover to TML.
3. Responsibility
APLL Supervisor
APLL Operation
4. Procedure
All the procedure in points
4.1 Day wise Activities :-
i. Head, Crankshaft & Block will be available from the Despatch cell.
(SPOC : Ajit Jagtap & Sadanand)
ii. Ensure the Qty. before collecting the parts and note down the receiving Qty.
for record purpose.
4.4 Handover of Dunnages & FLCs to TML as per the requirement and take a proper
record of this on MIS
Procedures:-
a) Preparation of FLC Box
b) Using Insertor & Separator inside the Box as per the Parts availability as per
the given table :-
Insertor:-
Separator:-
4.9 Manifest Tripsheet Preparation & Acknowledgment of TML with Seal &
Signature to tally all the Assets at the receiver end
4.10 Update the asset tracker by Scanning the Barcode Pasted on the FLC with the help of
the Scanner.
4.12 Sending the Daily dispatch report to APLL stakeholder (Inbound & Outbound)