Project HSE Plan ..

‫محتويات خطة السالمة الخاصة بالمشاريع‬

1.0 Introduction

1.1 Abbreviations and definitions

1.2 References

1.3 Project Scope of Work and Location

1.4 Key Persons

1.5 HSE Policies and Objectives

1.5.1 HSE Policies

1.5.2 HSE Objectives

2.0 Project HSE Management System

2.1 General Principles

2.2 Incident and Accident Prevention

2.3 Legal and other requirements compliance

2.4 HSE Risks Management

2.5 Roles and Responsibilities

2.6 Training and competency

2.6.1 Training of Temporary Personnel

2.7 Communication, Participation and Consultation

2.8 Performance review and continuous improvement

2.8.1 Statistics

2.8.2 HSE Measuring and Proactive Monitoring

2.8.3 Regular Inspections

2.8.4 Internal Audits

2.8.5 Subcontractors Performance Review

2.8.6 HSE Management Review

3.0 Method Statement and Risk Assessment


3.1 Definitions

3.2 Method of Statement Process

3.3 Risk Assessment Process

3.4 Specific Method Statement and Risk Assessment

3.5 Preparation and Submission of MSRA

4.0 Incident Reporting and Investigation

4.1 General and Definitions

4.2 Incident Reporting and Investigation Process

4.3 Accidents analysis and Preventive Action

4.4 Hazardous Situation Reporting

5.0 Permit To Work

5.1 General Guidance

5.2 Responsibilities

6.0 Isolation Procedures (LOTO)

6.1 General Guidance

6.2 Responsibilities:

6.3 Planning and Preparation

7.0 Hygiene and welfare facilities

7.1 General

7.2 Installation and connection to services

7.3 Hygiene and Sanitary Facilities

7.4 Potable water

7.5 Non-potable water:

7.6 Washing facilities:

7.7 Food consumption and Rest Area


7.8 Pest Control

8.0 Emergency Preparedness and response

8.1 First Aid and Medical Evacuation Procedures

8.2 Fire Protection, Prevention and Evacuation Procedures

8.2.1 General

8.2.2 Firefighting and Evacuation Planning

8.2.3 LPG Liquefied petroleum gases cylinders

8.3 Emergency Review

9.0 Operational Control

9.1 General

9.2 Subcontractors management

9.2.1 Sharing construction equipment between subcontractors

9.2.2 Safe guarding against theft

9.2.3 Data protection

9.3 Management of Temporary Personnel

9.4 Site access and Security Procedures

9.5 Personal protective equipment (PPE)

9.6 Working at height

9.6.1 General

9.6.2 Individual Fall Protection

9.6.3 Ladders

9.6.4 Guard Rails

9.6.5 Man-Basket

9.6.6 Man-Lift and MEWP

9.6.7 Work Platforms

9.6.8 Safety Net

9.7 Scaffolding
9.7.1 Fixed Scaffolding

9.7.2 Rolling Scaffolding

9.7.3 Hanging, Flying or Suspended Scaffolding

9.8 Crane and lifting operations

9.8.1 General

9.8.2 Lifting Operation Safety Procedures

9.8.3 Crane Safety Devices

9.9 Construction Heavy Equipment

9.10 Excavations and underground services

9.11 Hot works

9.12 Work in confined spaces

9.13 Platforms, Grating and Handrails

9.14 Housekeeping

9.15 Site lighting

9.16 Site power supply and electrical safety

9.17 Power Tools and Equipment

9.18 Manual handling

9.19 Laydown and storage area

9.20 Installation of Ancillary

9.21 Traffic Control

9.22 Sings and Warning

9.23 Lightning Protection

9.24 Radio Communication

9.25 Unauthorized Operating of Switchgear and Valves

9.26 Surveying, Leveling and Measuring Marks

10.0 Subcontractor HSE Obligations

10.1 Subcontractor HSE Plan

10.2 Pre-Start / Kick Off Meeting


10.3 Subcontractors Accident and Incident Program

10.4 Method Statement and Risk Assessment

10.5 Permit To Work

10.6 HSE Personnel

10.7 HSE Training

10.8 HSE Documentation

11.0 Behavioral Safety

11.1 Incentives

11.2 Personal Behaviours

11.3 Disciplinary and Corrective action

12.0 HSE Personnel

12.1 General

12.2 Contractor / Subcontractor HSE Manager

12.3 HSE Team members (Senior/ officer)

12.4 Part-Time or Dual Role HSE team members

13.0 Construction Environmental Management Plan

13.1 General

13.2 Environmental Impact Assessment and Prevention

13.3 Dust Control

13.4 Noise Control

13.5 Emergency Response to Environmental Incidents

13.6 Storage and Handling of Hazardous Substances

13.7 Environmental control Measures

13.8 Waste Management Procedure

14.0 Occupational Health Program


14.1 Occupational Noise Control

14.2 Working During extreme weather

14.3 Back Injuries Prevention

14.4 Office safety and Ergonomics

14.5 Vibration Protection

14.6 Non-Ionizing Radiation

15.0 Supply Chain Procedures

15.1 Subcontractors and Services Providers Prequalification

15.2 Hazardous Substances Management

15.3 Buy / Rent Equipment and Tools

16.0 Off-Job Safety

16.1 Staff Accommodation

16.2 Employee Transportation and Driving