Professional Documents
Culture Documents
JHA Scaffolding 21.6.2023
JHA Scaffolding 21.6.2023
Step Description of Task Potential Hazard Consequence Risk Control and/or Recovery Measures
No. Rating
(PEAR)
1 Preparation of PTW Missing information Expose worker to C1 Attended PTW training
Inadequate hazard unexpected hazards Toolbox meeting prior to start
identification work.
2 Scaffolding Materials Biological Hazard Physical injury Fully aware on the surrounding
Preparation (Poisonous animal) hazards
3 Transfer of Scaffolding Pinch point Hand/Finger Injury Wear hand gloves
Materials from Store to Fall, Slip & Trip Physical injury Be vigilant at pinch point
GCTF Equipment damage Identify obstruction, ensure
safety shoes in good condition
4 Erection & of Hot Weather Heat stroke, dehydration Limit time exposure under
Scaffolding Fall from height Physical injury direct sun, adequate water
Falling Object Equipment damage intake
Pinch point Hand/Finger Injury Wear full body harness
Barricade the area to limit the
entry of non-authorized
personnel
Display warning sign
Secure tools by lanyard
Full PPE; Helmet, gloves,
safety glass
Be vigilant at pinch point