Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

N

CINA
ARA
BID
JL .

ATA
R DIN
ANDA
Ladder
A1 B1

ISK
OTTO
JL. MT

Fire protection ladder.


. HA
RYON
O

JL .
Hatch moved to top of Firetank slab NOTES:
Slab 120mm thick slab. (Design) +3350mm 1. ALL DIMENSIONS ARE IN "mm" & LEVELS ARE IN
"m", UNLESS OTHERWISE SPECIFIED.
2. THE INSTALLATION AND DESIGN SHALL COMPLY
WITH THEHEALTH AND SAFETY AT WORK ACT, AND
ALL REGULATIONS.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION
WITH ALL ASSOCIATED EQUIPMENT SCHEDULES
Gantry 1 AND MECHANICAL,ELECTRICAL, STRUCTURAL AND
ARCHITECTURAL DRAWINGS.
LEVEL 1M

1650
24.450

950
3650
LEVEL 1
20.250

REV. NO. REVISION DESCRIPTION BY DATE


PROJECT TITLE:

HARYONO DATA CENTER


M.T. HARYONO, JAKARTA TIMUR, INDONESIA.

CLIENT

Section Firetank
2 1 : 150
Project Managers|QS Consultants

PT. TURNER & TOWNSEND


International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com

FIRE TANK #1
RED: M&E Consultant
3 ANSON ROAD #17-03 SPRINGLEAF
effective storage height: 3.5m

1
TOWER SINGAPORE 079909
recommended constructed tank height: 4.65m t: +65 6226 3106 | www.red-eng.com

tank horizontal cross-sectional area: 66.3 m2


actual tank size: 232 m3 Architect
AWP PTE LTD
effective water capacity: 240m3 Access ladder 143 CECIL STREET, #12-00 GB BUILDING

0 1.5 3 4.5 6 7.5 pls verify the tank dimension and ensure the water capacity of
240m3 is achievable
SINGAPORE 069542
Tel: + 65 63376777, Fax:+ 6563396956
www.awparchitects.com
B1 Proj. email:

SPK Pump room awp220603c@awparchitects.com

m To demonstrate the details of incoming pipe din, overflow line, C&S CONSULTANT:
warning line, water line, warning pipe Dw, low water line etc.

Ladder inside firetank GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6 JAKARTA SELATAN 12720
TEL: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com

Water volume 220 cubic SECURITY CONSULTANT:


New hatch position
16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318
Tel: +65 6227 2038 | singapore@controlrisk.com
RED: rejected. GENERAL CONTRACTOR:
PT. Berca Buana Sakti

2225
The water tank is used for PT. Berca Mandiri Perkasa
both water sprinkler demand JOINT OPERATION
and fire hydrant. Jl. RC. Veteran No. 4 Bintaro,Jakarta
12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003
water demand for sprinkler
(SNI 03-3989-2000 table 5.3.2): 1350 GC's DC CONSULTANT:
220 m3 HEWLETT-PACKARD
ENTERPRISE
water demand for hydrant for
Data Center Technology Service
combined system (SNI
03-1745-2000 clause 7.9.1.3):
A1
227.1 m3
FOR INFORMATION
FIRE TANK #2
the 227.1 m3 shall be taken as
worse case, and round up to Skema Fire tank

3
240 m3 as the design effective
capacity of the tank..
8
Pls redesign the dimension of SCALE 1: SIGNATURE DATE

the tank. 7 150


DRAWN
6
0 1.5 3 4.5 6 7.5
FIRETANK Plan
CHECKED
Reference:
HAR01-RED-DC-XX-CA-J-8001 CHECKED

4
CHECKED

m APPROVED
DRAWING NO. REV.NO.

1 : 150
N

CINA
ARA
BID
JL .

ATA
R DIN
ANDA
ISK
OTTO
JL. MT
. HA
RYON
O

JL .
NOTES:
1. ALL DIMENSIONS ARE IN "mm" & LEVELS ARE IN
"m", UNLESS OTHERWISE SPECIFIED.
2. THE INSTALLATION AND DESIGN SHALL COMPLY
WITH THEHEALTH AND SAFETY AT WORK ACT, AND
ALL REGULATIONS.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION
WITH ALL ASSOCIATED EQUIPMENT SCHEDULES
AND MECHANICAL,ELECTRICAL, STRUCTURAL AND
ARCHITECTURAL DRAWINGS.

C1

REV. NO. REVISION DESCRIPTION BY DATE


PROJECT TITLE:

HARYONO DATA CENTER


M.T. HARYONO, JAKARTA TIMUR, INDONESIA.

CLIENT
B

10700
B1 2206 Project Managers|QS Consultants

1480
PT. TURNER & TOWNSEND
International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com

M&E Consultant
3 ANSON ROAD #17-03 SPRINGLEAF
TOWER SINGAPORE 079909
t: +65 6226 3106 | www.red-eng.com

total nett capacity

5799
240 m3
7604

Architect
AWP PTE LTD
143 CECIL STREET, #12-00 GB BUILDING
SINGAPORE 069542
Tel: + 65 63376777, Fax:+ 6563396956
www.awparchitects.com
Proj. email:
awp220603c@awparchitects.com

C&S CONSULTANT:
A

GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6 JAKARTA SELATAN 12720


A1 3430
TEL: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com

2290 SECURITY CONSULTANT:


4980

16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318


Tel: +65 6227 2038 | singapore@controlrisk.com

GENERAL CONTRACTOR:
PT. Berca Buana Sakti
PT. Berca Mandiri Perkasa
JOINT OPERATION
Jl. RC. Veteran No. 4 Bintaro,Jakarta
12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003

GC's DC CONSULTANT:
HEWLETT-PACKARD
ENTERPRISE
Data Center Technology Service

FOR INFORMATION
GANTRY

GROUND FLOOR - GANTRY


SCALE 1: SIGNATURE DATE
150
DRAWN

Scale: 1 : 150 CHECKED

CHECKED

CHECKED
5 6 7 8 9 10 APPROVED
DRAWING NO. REV.NO.

You might also like