QUALITY MANAGEMENT PLAN

BUCHAREST INTERNATIONAL AIRPORT RAIL ACCESS LINK PROJECT

LIST OF WORK
METHODOLOGIES AND
PROCEDURES
Annex no. 2

Cod Cod 6.01.STR1.13.QA.00.PMC.ITP-000.AMA.POM.


6.01.STR1.12QMG.0.00-AS.002.AMA.POM.03
QUALITY MANAGEMENT PLAN

BUCHAREST INTERNATIONAL AIRPORT RAIL ACCESS LINK PROJECT

METHODOLOGIES
NO.
Code Title Date
crt.
1 6.01.STR1.12STD.3.00-
RG.001.YUK.AMA.POM.
Program and Methodology for Geotechnical
12.08.2022
Investigations
00

PROCEDURES (*)
No.
Code Title Date
crt.
Method of Statement for Utility Diversion

1 6.01.STR1.14CMG.0.00 MS Electric Utility Diversion


-PR.001.AMA.POM
2 6.01.STR1.14CMG.0.00
-PR.002.AMA.POM MS Tc Utility Diversion
3 6.01.STR1.14CMG.0.00
-PR.003.AMA.POM MS Hot Water Utility Diversion
4 6.01.STR1.14CMG.0.00
MS Sewage Line Utility Diversion
-PR.004.AMA.POM
5
6.01.STR1.14CMG.0.00
MS Water Line Utility Diversion
-PR.005.AMA.POM
6 6.01.STR1.14CMG.0.00
MS for Excavation
-PR.006.AMA.POM
7 6.01.STR1.14CMG.0.00 Method of Statement for Guide & Diaphragm Walls
-PR.007.AMA.POM & Barrettes
8 6.01.STR1.14CMG.0.00
Method of Statement for Traffic Diversions
-PR.008.AMA.POM
9 6.01.STR1.14CMG.0.00- Method of Statement for Execution for Interstation
PR.009.AMA.POM Structures
10 6.01.STR1.14CMG.0.00
Method of Statement for Dewatering Works
-PR.010.AMA.POM

Method of Statement for Station Construction

11
6.01.STR1.14CMG.0.00
Method of Statement of Concrete Works
-PR.011.AMA.POM

Cod Cod 6.01.STR1.13.QA.00.PMC.ITP-000.AMA.POM.


6.01.STR1.12QMG.0.00-AS.002.AMA.POM.03
QUALITY MANAGEMENT PLAN

BUCHAREST INTERNATIONAL AIRPORT RAIL ACCESS LINK PROJECT

NO.
Code Title
crt. Date

12 6.01.STR1.14CMG.0.00- Method of Statement of Reinforcement Works


PR.012.AMA.POM
13 6.01.STR1.14CMG.0.00
Method of Statement of Formworks
-PR.013.AMA.POM
14 6.01.STR1.14CMG.0.00
Method of Statement of Waterproofing
-PR.014.AMA.POM
15 6.01.STR1.14CMG.0.00
Method of Statement of Backfilling
-PR.015.AMA.POM
16 6.01.STR1.14CMG.0.00
Method of Statement for Demolition Works
-PR.016.AMA.POM

Method of Statement for Tunnel Construction

17 6.01.STR1.14CMG.0.00 -
Method of Statement of Segment Manufacturing
-PR.017.AMA.POM
18 6.01.STR1.14CMG.0.00 Method of Statement of TBM Tunneling and
Segment Placing
-PR.018.AMA.POM
19
6.01.STR1.14CMG.0.00 Method of Statement of Break - in - Break Out for
-PR.019.AMA.POM TBM
20 6.01.STR1.14CMG.0.00 Method of Statement of Hyperbaric Interventions to
the TBM Excavation Chamber
-PR.020.AMA.POM
21 6.01.STR1.14CMG.0.00
Method of Statement of NATM Works
-PR.021.AMA.POM
22 6.01.STR1.14CMG.0.00
Method of Statement of Pipe Jacking
-PR.022.AMA.POM
23 6.01.STR1.14CMG.0.00
Method of Statement for Monitoring
-PR.023.AMA.POM
24 6.01.STR1.14CMG.0.00 Method of Statement for Working in Extreme
-PR.024.AMA.POM Climatic Conditions
25 6.01.STR1.14CMG.0.00
Method of Statement for Cold Weather Works
-PR.025.AMA.POM

Cod Cod 6.01.STR1.13.QA.00.PMC.ITP-000.AMA.POM.


6.01.STR1.12QMG.0.00-AS.002.AMA.POM.03
QUALITY MANAGEMENT PLAN

BUCHAREST INTERNATIONAL AIRPORT RAIL ACCESS LINK PROJECT

No. Title
crt. Code
Date

Method of Statement for Inspect and Testing Works

26 6.01.STR1.14CMG.0.00 Method of Statement for Inspection and Receiving of


-PR.026.AMA.POM the Goods
27 Method of Statement of Inspection of Concrete
6.01.STR1.14CMG.0.00 Works (Conditions of Acceptance, Testing and
-PR.027.AMA.POM Repairing)

(*) Note: the List is permanently corelated with the technical documentation valid for execution.

Cod Cod 6.01.STR1.13.QA.00.PMC.ITP-000.AMA.POM.


6.01.STR1.12QMG.0.00-AS.002.AMA.POM.03

You might also like