Achievement Chart of Rac Serivicing

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

8.

7.
6.
5.
4.
3.
2.
1.

9.

25.
24.
23.
22.
21.
20.
19.
18.
17.
16.
15.
14.
13.
12.
11.
10.
Alvie Ancis

Noel Julian
Junnel Barra
Joel Jamasali

Noel Jan Torino

Yazhid Salvador
NAME OF TRAINEE

Teddy Neil Bucoy


Simeon Los Baños

Prepared by:
Survey Site for Installation

Trainor
Prepare for the Installation of
PACU/CRE
Install Components of PACU/CRE
Components

System

PAUL C. SAAVEDRA
Install PACU/CRE

Test Run PACU/CRE System

Prepare Piping Requirements

Install Bracket and Support

Install Bracket and Support


System

Perform Pipe Joint


Install PACU/CRE Piping

Insulate Refrigerant/Chilled Water


Piping
Lay Out Electrical System

Install Power Supply Wiring, Controls


Install

& Protective Devices


System
Electrical
PACU/CRE

Test Run Electrical System

Check/Adjust RAC Components,


Controls & Operating Condition
Maintain Lubrication System in
PACU/CRE
Maintain Refrigerant System in
PACU/CRE
Approved by: Maintain Secondary Heat Transfer
PACU/CRE

Equipment in PACU/CRE
Maintain Air Distribution System in
Service and Maintain

PACU/CRE
Maintain Electrical System

Plan & Prepare for Troubleshoot


PACU/CRE
Troubleshoot Electrical System
ACHIEVEMENT CHART OF RAC SERIVICING (PACU/CRE) NC-III

Troubleshoot Mechanical System


PACU/CRE
Troubleshoot

Test Unit Performance


Center Administrator

Assess Unit for Recovery/Recycle


GERONIMO A. BANDICO

Set up Equipment for Recovery/


Recycle

PACU/CRE
Recover and

Refrigerant in

Perform Refrigerant Recovery/ Recycle

Assess Unit for Retrofit

Repair/Replace Defective Component

Perform Repair and Retrofitting


PACU/CRE
Repair and Retrofit

Test Operating Performance of


Retrofitted Unit

You might also like