Professional Documents
Culture Documents
Extltm 21oct 19 Ehs
Extltm 21oct 19 Ehs
Ext LTM
2%
LA
66%
US&C
2
Injury & Illness data
Rec DAFW 24
Rec Cases 5 29 Recordable Injuries
First Aid 133
Information 47 *Includes Legacy
sites
Source of Injury
10
* Hands remain #1 and Head #2
10 most injured parts (Rec & FA )
8 6
6 4 * 4 of 5 severe cases were
4
3 2 2 Machine Guarding related
2
1 1
0 * Employees < 2 years
* Routine Tasks- No RA
* Slips, trips, falls . Manual work
* Rotating parts, Work at height,
3 lifting operations, vehicles
*
Lessons learned
Management
People become involvement Low standards become
complacent your high expectations
Risk is always
present We don’t know what we don’t know SAFETY improves
There is no “safe speed” Productivity
Working groups with Controls via procedures are poor…even
operators to KNOW the RISKS worst without safety culture
Good KPIs BUT… Bad
Back to basics performance
Eliminating Risk
improves Safety EHS status & Culture
culture We MUST Never blame an employee assessments for
new plants
challenge the – tackle the root cause
Status-quo
2020 Priorities
Compliance
• Environmental Audits ( app.
sites )
• H&S Audit (app. sites )
Incident Prevention
• Risk Matrix
• CAPA’s Closure rate
Risk Management
• Machine Guarding
• LOTO
5
2020 Strategy
Machine Guarding
LOTO
Compliance Audits
Risk Matrix
Culture Assessment
6
Machine Guarding
Tarragona, Spain
Biesheim, France
Washington, GA
Waynesboro, VA
Sao José, Brazil
Berlin, Germany
Old Hickory, TN
Schaumburg, IL
Pilar, Argentina
Mooresville, NC
Bailleul, France
Cali, Columbia
Suzhou, China
Jundiai, Brazil
Statesville, NC
Nanhai, China
McAlester, OK
Latin America
Mundra, India
Pewaukee, WI
Aberdare, UK
Nashville, TN
Augusta, KY
Benson, NC
Maldon, UK
Mason, OH
Dalton, GA
EMEIA
Asia
# Recordables 0 3 1 5 2 1 2 3 1 2 0 3 2 1 2 1 1 0 2 1 1 3 2 0 0 2 0 7 0 3 0 2 2 0 6
TRIR 0.00 1.00 1.69 2.11 1.31 1.38 1.75 1.24 1.15 3.41 0.00 2.21 1.08 1.01 0.22 0.48 0.34 0.00 1.28 0.24 0.19 1.28 0.83 0.00 0.00 1.01 0.00 2.05 0.00 0.74 0.00 2.64 1.99 0.00 3.25
EHS Framework (1-7) 3.9 4.1 3.8 3.3 3.4 2.7 2.8 3.5 2.0 3.0 4.4 3.6 2.8 3.2 3.3 3.4 3.0 3.6 3.2 3.6 3.8 2.8 3.6 3.9 3.9 3.9 2.7 4.0 3.3 2.7 3.5 3.9 3.9 3.5
EHS Framework (all) 3.59 3.81 3.21 3.47 2.91 2.41 2.59 3.11 2.07 2.78 4.17 2.62 2.81 2.40 2.95 2.81 2.19 2.85 3.19 3.61 3.41 2.26 3.39 3.16 3.40 3.04 2.41 3.67 3.09 2.62 3.48 3.23 3.60 3.53
# Elements Audited 7 4 2 7 4 2 6 5 4 8 13 4 6 9 7 8 7 6 7 4 8 8 5
# Agency Inspections 10 1 1 2 1 1 1 3 2 3 1 1 2 2 1 4 2 6 1 2 2
# NOVs 0 0 3 1 2 0 0 0 0 0 0 0 0 4 0 0 0 0 0 3 0
FM Global pre-2019 67 62 50 66 45 48 68 28 45 35 22 55 29 87 49 45 57 44 74 66 60 82 87 47 52 66 79 62
FM Global 2019 69 69 47 63 45 44 71 49 12 47 35 43 56 35 41 50 47 61 54 79 57 65 87 43 48 49 64 71 57
11
VISION
COMPONE FOCUS AREA TARGET ACTIONS
NT
Risk Reduction Site specific target Define Actions per site based on Top Risks
NM Achieve # NM reported per Target - Weekly Define Actions per site
Incident completion follow up
Prevention BBS Achieve # BBS reported per Target - Weekly Define Actions per site
completion follow up
CAPA's Achieve % Actions closed on time -weekly Define Actions per site
completion follow up
FW Machine Guarding Element 13.2 - All equipment has Machine All sites guarded; Focus sites BEDE, CUNL, ASDE, DODE ( 6 months- Mar2020) & Rest (2020
Guarding Assessment and corresponding Action FYE )
Plan (13.2.1 - score of 4 or greater) FW Element; Perform mechanical & electrical guarding assessments
a) 100& Exceptions assessed (eliminate/risk assess)
b) Guarding action plan
Risk c) Execution
Managem FW LOTO Element 12 – All Sub-Elements >3.0 with no FW Element actions ;
ent individual question score = 0 - Program
- Machine LOTO specific procedures & exceptions
- Training Authorised & affected employees
- Program evaluation
Other FW Meet Site FW scores specific targets Define Actions per site
improvements
HS regulatory H&S regulatory assessment (Third Party) site 2020 Sites: MUIN (Third Party-TBD )
specific project
assessment
Complianc Environmental Environmental regulatory assessment (Third 2020 sites ; BAFR, BEDE, CUNL
e Party) site specific project (ERM-Corporate managed )
regulatory assessment
Completion of 90% of Environmental Compliance
findings within 180 days
Cultural assessment Perform Cultural asessment (internal) site specific 2020 sites ; All sites (Internal assessement)
Culture project
12
VISION
FOCUS AREA TARGET ACTIONS
COMPONENT
Environmental Undertake Sites; DODE:
Projects Environmental BAFR: - RTO
Compliance - Fire water retention capex to be submitted - decalred as non - Fire protection wall
projects compliant - Solvents/Chemical storage
BIFR: NFFR :
- Replace compressor for line 1. Fire protection devices non - Avoid pollution in case of fire : Installation of sealing plugs for
compliance out from 3rd party auditor rainwater networks (37 k€)
- FM Global remark on Gemini sprinkler compliance.To be evaluated - Chemicals storage improvements : 26 k€
Tier 1 & Tier 2 TAES:
CUNL: - Chemicals storage building
- Binder mix area- process improvement - Hazardous waste storage area upgrade
- Emissions control system to be installed - Empty oil drums storage area upgrade
- NOX - Gas natural use comsumption
Sustainability & Develop/Execute Sites ; CUNL:
Other Sustanability ABGB: - Waste reduction project
Environmental Projects - Raise level of recycling of waste (not production waste) from 42% MAGB:
EHS Mgt System
Projects (FY19) to > 75% - Waste reduction project including CAPEX support for recycling
- Energy team to launch an energy survey machinery ( increase amount and type of material recycled
ASDE: MUIN:
- Reduce Start Up scrap in Extrusion and increase reuse through NGR - Sustianability Project-sales of recycled waste will be reduce by 2%
- Ops clean sweap - Other Env. Projects - Increase plantation in the peripheri of the
- Waste segregation ( non production waste) plant
BAFR: - Coal burning elimination project to be considered.
- Improve retention of the waste water treatment station - Potential to solar energy generation project
- Reduce waste landfill TAES :
BEDE: - Waste segregation - pilot containers-ambasadors nominated.
- Increased recycling of waste and usage of recycled material - Ops clean sweap
BIFR: - Solar panels start project
- Cooling compressors replacement (Engie project) TEIT:
- Energy reduction project, implement new recycling machine to - Waste reduction project
reduce scraps
13
TASK FREQUENCY
VISION COMPONENT FOCUS AREA TARGET
Environmental regulatory assessment Environmental regulatory assessment (Third Party) site Annual Regulatory assessment
specific project
Compliance Completion of 90% of Environmental Compliance findings
within 180 days
Cultural assessment Perform Cultural asessment (internal) site specific project Annual Cultural assessment
Culture
Analyze/ Measure
Improve .
Equipment & Plant
design
Work Environment
Input actions into GDC
Management Systems
& Procedures
Human Behavior
Expectations
Sites Expectations
Scheduled completion
STATUS Comments Concenrs/Support need Update 21st-Oct-2019
date
Guarding Assessment - to be
October 2019-Guarding reviewed End October for
Biesheim, France- assessment improvement
in progress
BIFR Dec 2019 Line 1 CAPEX Line 1 ( End December)
Jan 2020 -Line 3 Line 3 (End Jan) other guarding (
after guarding assessment)
Project manager assigned - Hendrik Reynvaan
leverage experienced Third party support SICK - line 1: (especially end of line), already in the plan internally as number 1 for
Cuijk, No EHS & technical resources -
Not started/in personnel from Bailleul safety guarding
Netherlands- Mar-20 Alternative external supplier to be
progress leverage engineering - line 16: (concept can we replicated for lines 12 - 15)
CUNL engaged.
resources - line 18 – MHC line.
October 2019
(assessments of Review BKM's from NFFR and
Tarragona, Spain- Not started in
exceptions) check if they are applicable to
TAES progress
YE 2020 ( machine TAES
guarding )
19
YE 2020 In progress
Italy-TEIT 3) To implement the method for
data collection during inspections
and testing.
Overall Milestones
Safe systems of work
• Machine guarding
• LOTO training • Machine guarding done
• LOTO Training EHS Focus sites
everybody else Rest of sites
staff • LOTO training
• LOTO procedures- • LOTO procedures –
• LOTO Programs Authorised & LOTO
general equipment specific
written affected
• LOTO Procedures
assessment
Q1 Q2 Q3 Q4