No.RT-25036/08/2015RS
iv. The details of nodal officer have been provided by Transport Dept.
Raipur.
v. The project will be implemented in private partnership with Maruti
Suzuki India Ltd. following the selection process initiated by
Transport Dept. Chhattisgarh.
vi. The area indicated for the building infrastructure is in line with the
IDTR guidelines. But the proposed detailed layout plans need to be
provided.
vii. The time schedule for completion of various activities of project will
be provided by state govt.
viii. State govt. has also ensured full utilization of the capacity of IDTR
and it is self sustaining and commercially viable.
5. From above, it could be seen that the State has land and requirement
of grant in aid by the State from us is also within approved limit. The IDTR
is also commercially viable in terms of the data provided by the State. The
proposal of the State Government of Chattisgarh is meeting the requisite
criteria for sanctioning of IDTR. Therefore we may sanction Institute of
Drivers Training and Research (IDTR) to be set up at Naya Raipur,
Chhattisgarh in 12th five year plan with total project cost of Rs 17 crore
excluding taxes.
6. The expenditure in this regard will be met from the scheme of
setting up of IDTR. The budgetary outlay for 2015-16 is Rs. 15 Crore for the
scheme. No fund has been released so far. Thus sufficient fund is available for the
purpose. The fund will not be required at one go but it will be released in
installment keeping in view of the progress of the centre.
7. In view of the above, we may seek the kind approval of JS (T) to the
project contained in para 5 at pre page. After approval, the file may be
referred to IFD for occurrence.
-5- No.RT-25036/08/2015RS
3. In this response the State Government has sent the revised proposal
(placed at page 85-102/c). As per the revised proposal the total cost of the project
is 17 Crore as presented in the following table.
The revised proposal has been examined in consultation with IFD vide note at
page 1-3/N. IFD has concurred the proposal vide note at page 4/N. However, their
concurrence is subjected to the approval of competent authority.
5. In view of the above we may release the first installment amounting to Rs.
1.50 crore to Transport Department, Government of Chhattisgarh and out of this
an amount of Rs. 75,000/- will be released to CIRT, Pune consultancy fee @
0.5% of this release for setting up of IDTR at Naya Raipur, Chhattisgarh.
6. File is submitted for kind approval of JS (T). After the approval file may
be referred to IFD for the concurrence.
-12-
No.RT-25036/08/2015-RS
This is regarding release of first installment amounting to Rs. 1.50 cro
Transport Department, Government of Chhattisgarh for setting up of an Institu
Drivers Training and Research (IDTR) at Naya Raipur, Chhattisgarh.
2. In this regard it is stated that file was referred to IFD for concurring the pro
vide note at page 8/N, note IFD vide note at page 11/N concurred the proposal su
to the approval of competent authority and observations of IFD as under: -
i. As per terms and conditions annexed with sanction order, a society compr
representative of MoRTH, State Government and private partners, sha
formed for overseeing the construction and operation of the IDTR. How
RTW has not mentioned whether society has been formed.
ii. RTW has no mentioned whether the project will be completed within stipu
period, if not, extension is permissible as per schematic guidelines.
2. In this regard it is stated that file was referred to IFD for concurring the
proposal vide note at page 8/N, IFD vide note at page 11/N concurred the
proposal subject to the approval of competent authority. While concurring the
proposal IFD has made following observations: -
3.1. It is stated that the private partner i.e. Maruti Suzuki Limited is taking
necessary action to register the society. As per scheme guidelines, the society
should also have the members from State Government and MoRTH. The State
Government and MoRTH has furnished the details of its member to represent the
organization in the society. Thus, it may be stated society may be constituted in
next two months.
2. It is stated that proposal for the release of first installment has been
examined in the Ministry. It has been decided that the fund will be released
only after the registration of the society.
2. It is stated that proposal for the release of first installment has been examined in
the Ministry. It has been decided that the fund will be released only after the registration
of the society. We have written to Transport Department, Government of Chhattisgarh to
submit the documents of society formation vide our letter placed at page 156-/C.
2. In this regard it is stated that file was referred to IFD for concurring the
proposal vide note at page 8/N, IFD vide note at page 11/N concurred the
proposal. However their proposal is subject to the approval of competent
authority. While concurring the proposal IFD also made following observations: -
3. The budgetary outlay for the financial year 2018-19 is Rs. 90 crore. Till date
no fund has been released so far. Thus sufficient fund is available. Fund will be
released from budgetary head 3055 - Major head, 28- Road Safety financed from
Central Road Fund, 28.03- Refresher Training of Drivers in unorganized Sector and
Human Resource Development, 28.03.35- Grants for creation of capital assets.
4. In view of the above we may refer the file to IFD for revalidating the
proposal for the release of Rs. 1.50 crore to Transport Department, Government of
Chhattisgarh for setting up of an Institute of Drivers Training and Research (IDTR)
at Naya Raipur, Chhattisgarh
-23-
No.RT-25036/08/2015-RS
4. In this regard it is stated that, file was referred to IFD for concurrence vide
note at page 21/N. IFD has concurred the proposal vide note 22/N. However, their
concurrence is subject to the approval of competent authority.
4. CIRT vide their letter placed at page 218-222/C has informed that their
representative visited Naya Raipur on 18th July, 2018 to assess the progress of the
project. They found the progress satisfactory. They have further stated that total
expenditure incurred against the total amount i.e. Rs. 149.25 lakh, is Rs. 580.00
lakh towards the construction of the IDTR till 18 th July, 2018 and pending amount
of Rs. 430.75 lakh will be paid from the next installment. Following progress has
been reported by CIRT:-
i. Work relating to academic block, sub structure has been completed and
super structure second slab R.C.C. completed, brick masonry work has
been started and super structure work is in progress.
ii. In Hostel block, sub structure is completed and super structure R.C.C.
plinth beam, column, 1st slab completed.
iii. Work related to track, all track excavation is completed and work
relating to track sub grade layer, track open drain R.C.C. work is in
progress.
5. CIRT has further stated that considering the work progress, utilization of
fund and project schedule, CIRT have recommended to release an amount of Rs.
5.00 crore Transport Department Government of Chhattisgarh for continuing the
civil construction of IDTR.
2. In this regard it is stated that file was referred to IFD vide note at page
26/N for concurrence. However, before concurring the proposal IFD vide note
at page 27/N has observed as follows: -
2. In this regard it is stated that file was referred to IFD vide note at page
26/N for concurrence. However, before concurring the proposal IFD vide note
at page 27/N has observed as follows: -
2. In this regard it is stated that file was referred to IFD vide note at page
26/N for concurrence. However, before concurring the proposal IFD vide note
at page 27/N has observed as follows: -
3. It is stated that JS (T) vide note at page 29/N has also observed as
follows:
i. Up to what date are we looking at completion?
ii. What was the original completion date?
2. In this regard it is stated that file was referred to IFD vide note at page
26/N for concurrence. However, before concurring the proposal IFD vide note
at page 27/N has requested to clarify reasons for delay in completion of the
project.
3. It is stated that JS (T) vide note at page 29/N has also observed as
follows:
i. Up to what date are we looking at completion?
ii. What was the original completion date?
i. Work relating to academic block, sub structure has been completed and
super structure second slab R.C.C. completed, brick masonry work has
been started and super structure work is in progress.
ii. In Hostel block, sub structure is completed and super structure R.C.C.
plinth beam, column, 1st slab completed.
iii. Work related to track, all track excavation is completed and work
relating to track sub grade layer, track open drain R.C.C. work is in
progress.
3. In this regard it is stated that file was referred to IFD vide note at page
26/N for concurrence. However, before concurring the proposal IFD vide note
at page 35/N has requested to clarify reasons for delay in release of payment
to transport Department, Chhattisgarh.
4. In this regard it is stated that file was referred to IFD for concurring
the proposal vide note at page 31/N, IFD vide note at page 37-38/N
concurred the proposal subject to the approval of competent authority.
i. Work relating to academic block, sub structure has been completed and
super structure R.C.C. work, brick masonry and plastering work has
been completed.
ii. In Hostel block, sub structure has been completed and super structure
R.C.C. work, brick masonry and plastering work has been completed and
work relating to electrical work and finishing
iii. Work related to track, all track excavation is completed all track sub-
grade and WBM layer work completed and Track top layer pavement
work in progress.
5. CIRT has further stated that considering the work progress, utilization of
fund and project schedule, CIRT have recommended to release an amount of Rs.
5.00 crore Transport Department Government of Chhattisgarh for continuing the
civil construction of IDTR.