This document summarizes settlement inspection measurements for the Jimbaran Green Hill project in Villa R2. It shows measurements taken at 5 different dates between May 29th and June 6th 2023 at the benchmark point BM1, surface floor level, multifunction room level 2, MEP room level, and notes. The measurements all match the expected levels with 0 deviation. Periodic checks are recommended at least once a month to be taken at the same locations. The data is reviewed by the surveyor, QC/engineer, and PM/SM.
This document summarizes settlement inspection measurements for the Jimbaran Green Hill project in Villa R2. It shows measurements taken at 5 different dates between May 29th and June 6th 2023 at the benchmark point BM1, surface floor level, multifunction room level 2, MEP room level, and notes. The measurements all match the expected levels with 0 deviation. Periodic checks are recommended at least once a month to be taken at the same locations. The data is reviewed by the surveyor, QC/engineer, and PM/SM.
This document summarizes settlement inspection measurements for the Jimbaran Green Hill project in Villa R2. It shows measurements taken at 5 different dates between May 29th and June 6th 2023 at the benchmark point BM1, surface floor level, multifunction room level 2, MEP room level, and notes. The measurements all match the expected levels with 0 deviation. Periodic checks are recommended at least once a month to be taken at the same locations. The data is reviewed by the surveyor, QC/engineer, and PM/SM.